Payment Terms | L/C |
Supply Ability | Negotiable |
Delivery Time | Customized |
Packaging Details | conventional |
product name | Big Automatic 65000Nm³/H CO CO2 Purification |
Capacity | 65000Nm³/H |
place | Taiwan Kaohsiung |
client | PetroChina Dalin plant in Taiwan |
scale | big |
time | 2015 |
purpose | Hydrogen extraction from refinery tail gas by PSA |
Brand Name | Techairs |
Model Number | PSA |
Place of Origin | China |
View Detail Information
Explore similar products
High Volume CO CO2 Purification Plant 24000Nm3/H PLC Control System
6.25t/H CO CO2 Purification System Huge Scale For Chemical Industry
Food Grade Liquid CO CO2 Purification Carbon Dioxide Purification 30000 Tons
Product Specification
Payment Terms | L/C | Supply Ability | Negotiable |
Delivery Time | Customized | Packaging Details | conventional |
product name | Big Automatic 65000Nm³/H CO CO2 Purification | Capacity | 65000Nm³/H |
place | Taiwan Kaohsiung | client | PetroChina Dalin plant in Taiwan |
scale | big | time | 2015 |
purpose | Hydrogen extraction from refinery tail gas by PSA | Brand Name | Techairs |
Model Number | PSA | Place of Origin | China |
High Light | 65000Nm3/H CO CO2 Purification ,Pressure Swing Adsorption CO CO2 Purification ,PSA carbon dioxide purification |
65000Nm³/H CO CO2 Purification By Pressure Swing Adsorption Technology
Big Automatic 65000Nm³/H CO CO2 Purification
The carbon monoxide rich gas source is used as raw material and purified to a certain purity by pressure swing adsorption technology, which meets the requirements of industrial production.
Technical indexes:
Purity:≥98%% (v/v)
Capacity:100~2000 Nm3/h
Yield:≥80%
Basic control function
Sequence control
All control valves are in accordance with the given conditions to switch control the process, making the unit work normally. All program control valves have the position detection, display and alarm function.
Control system can make cutting off and recovery control for a variety of operating conditions and realize safe and smooth implementation of various process control requirements.
PID Loop control
PID control for the important process parameters, meet the need of production.
Parameters optimization control
automatic regulate the flow on the basis of pressure changing , to avoid the pressure fluctuation of PSA system , to reduce the adsorbent erosion and prolong its service life.
Interlock control
A safety interlock function of process parameters.
Management function
Can monitor and dynamic process to improve the visual display, such as fault self diagnosis, the historical trend, the accident state and operation record and print the report forms.
The main function of:
General figure
The dynamic process of detail (images)
Alarm screen
Regulating loop bar graph
Parameter setting
Parameter optimization
Valve status display and operation
Power equipment monitoring
Historical trends (pressure, flow, temperature, liquid level, purity, etc.)
Real time trend (pressure, flow, temperature, liquid level, purity, etc.)
The fault diagnosis function
The control system has automatic diagnosis and alarm processing according to the parameters of pressure, valve position detection, the purity of the product, temperature, flow rate of automatic process or equipment failure, as well as self diagnosis the main fault of control system of its own: CPU failure, communication failure.
Fault tower switch and recovery
In the process of pressure swing adsorption, any fault such as valve, solenoid valve control circuit and other issues make the tower not work properly, need to cut off the tower and operate the rest, to ensure uninterrupted production, this is the key to improve the reliability of pressure swing adsorption, also a core technology of the pressure swing adsorption control.
Process as follows:
A. judgment of fault tower (according to pressure, valve testing, impurity);
B. program alarm and switch automatically (or manually by the operator after the confirmation), shut off all control valve of the fault tower;
C. system will run a new program automatically start from the minimum point of pressure disturbance;
When the fault tower is repaired and to be put into normal operation, the software can automatically find the best recovery as for large fluctuations and even failures, so that the system is stable and safe.
Recovery process is as follows:
A. the operator sends tower recovery instruction after the fault processing is completed;
B. program according to the stress state of the tower, automatically determine the optimal step in the recovery;
C. automatic program until the best point in time to make the tower without disturbance recovery enters into the best step, put into operation.
Company Details
Business Type:
Seller
Year Established:
2004
Total Annual:
15000000-20000000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Company profile Sichuan Techairs Co., Ltd. is a high-tech enterprise specialized in gas preparation, separation and purification technology research and development and engineering transformation. By establishing a strong platform for engineering transformation, the company has exte... Company profile Sichuan Techairs Co., Ltd. is a high-tech enterprise specialized in gas preparation, separation and purification technology research and development and engineering transformation. By establishing a strong platform for engineering transformation, the company has exte...
Get in touch with us
Leave a Message, we will call you back quickly!