Payment Terms | T/T, L/C |
Supply Ability | 6sets per year |
Delivery Time | 3months |
Packaging Details | Standard Export Package |
Raw Material | Silica,Carbonaceous Reducing Agent,Iron-Bearing |
Usage | Industrial |
Design Capacity | 30,000tons per year |
Control | Siemens PLC |
Turn-key Project | Yes |
Brand Name | CMT |
Model Number | Customization |
Certification | CE, ISO |
Place of Origin | China |
View Detail Information
Explore similar products
Electrolytic Aluminium Anode Rodding Assembly Equipment Production Line
36 M2 Mn Iron Ore Sintering Machine Turn Key Project
ITmk3 Rotary Hearth Furnace Direct Reduced Iron Sponge Iron Turnkey Project
Supervision 3000000T/Year Iron Ore Pellet Plant with Consulting Services
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 6sets per year |
Delivery Time | 3months | Packaging Details | Standard Export Package |
Raw Material | Silica,Carbonaceous Reducing Agent,Iron-Bearing | Usage | Industrial |
Design Capacity | 30,000tons per year | Control | Siemens PLC |
Turn-key Project | Yes | Brand Name | CMT |
Model Number | Customization | Certification | CE, ISO |
Place of Origin | China | ||
High Light | continuous heat treatment furnace ,welding electrode making machine |
CMT Adopts the most advanced process of ferrosilicon plant in the design.
We can provide whole machine line, installation, and technological service for you.
Technical process flow
Ferrosilicon is the alloy of silicon and iron,the ferrosilicon production belongs to slag-free submerged arc smelting. Carbonaceous reducing agent (coke,semi-coke,etc), iron-bearing material and silica are mixed according to a certain proportion then go into the furnace,the ferrosilicon is obtained through chemical reaction under high temperature by taking advantage of the arc heat.
The qualified materials (large bulk need crushing) go through material proportioning,lifting,distribution and feeding system,then after mixture (the mixture of silica,carbonaceous reducing agent,iron-bearing material) go into the furnace heart for smelting. The ferrosilicon is obtained through oxidation-reduction reaction under high temperature in the furnace heart,then after opening the furnace mouth through the arc burner (mutegun),the silicon hot metal flows into the ladle,then the ladle shall be transported to the pouring workshop for pouring via ladle trolley,at last,the ferrosilicon, after cooling,shall be crushed,packed,measured and stored).
The smoke generated from the ferrosilicon production goes through bag dedusting equipment for dust removing,then the purified smoke discharges into the air,at last condensing and packaging the processed dust.
Main equipment
Material preparation, burdening, material loading system |
Feeding and Burden distribution system |
Electrode Stability Control |
Short net system |
Furnace shell parts |
Gas hood |
Purging system |
At the front of furnace and subsidiary tools |
Hydraulic system |
Water cooling system |
Circulating water system |
For more information,pls feel free to contact us.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2000
Total Annual:
10000000-50000000
Employee Number:
500~1000
Ecer Certification:
Verified Supplier
Suzhou CMT, an international technology-oriented engineering group company, specialized in Turn-key Projects, providing services of project consulting, engineering design, construction supervision, project management and general contracting. We have strong technical support. There are m... Suzhou CMT, an international technology-oriented engineering group company, specialized in Turn-key Projects, providing services of project consulting, engineering design, construction supervision, project management and general contracting. We have strong technical support. There are m...
Get in touch with us
Leave a Message, we will call you back quickly!