China factories

China factory - Hebei Zexu Pipe Manufacturing Co., Ltd.

Hebei Zexu Pipe Manufacturing Co., Ltd.

  • China,Cangzhou ,Hebei
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Power Plant Aluminum Customized Steam Blowing Target Plate
China Power Plant Aluminum Customized Steam Blowing Target Plate

  1. China Power Plant Aluminum Customized Steam Blowing Target Plate
  2. China Power Plant Aluminum Customized Steam Blowing Target Plate
  3. China Power Plant Aluminum Customized Steam Blowing Target Plate

Power Plant Aluminum Customized Steam Blowing Target Plate

  1. MOQ: 1 PCS
  2. Price: USD 100 per piece
  3. Get Latest Price
Payment Terms T/T
Supply Ability 10,000 pieces per month
Delivery Time 3-10 working days
Packaging Details Wooden box, pallet or according to customer requirements
Material aluminum
Product specifications customizable
Blowing method Solo
Dust removal rate 0.999
Exhaust gas purification rate 0.9999
Implementation of quality standards DLT1269-2013
Brand Name Ze Xu
Model Number customizable
Certification API
Place of Origin Yanshan, Hebei, China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 10,000 pieces per month
Delivery Time 3-10 working days Packaging Details Wooden box, pallet or according to customer requirements
Material aluminum Product specifications customizable
Blowing method Solo Dust removal rate 0.999
Exhaust gas purification rate 0.9999 Implementation of quality standards DLT1269-2013
Brand Name Ze Xu Model Number customizable
Certification API Place of Origin Yanshan, Hebei, China
High Light power plant steam blowing target platecustomized steam blowing target platealuminum target plate for steam blowing

Power Plant Steam Purging Aluminum Target Plate, The Target Plate Frame Can Be Customized

Packaging & Delivery
Packaging Details:Wooden box, PE film, Bubble bag. e
Lead Time:
Quantity(Pieces) 1 - 10 >10
Est. Time(days) 25 To be negotiated

After the piping system is installed, it can be blown by air or steam according to the working conditions of the working medium and the degree of dirt on the inner surface of the pipe. The general requirements for pipe purge are:

Equipment and pipes that are not allowed to be purged should be isolated from the purging system.

Before the pipeline is purged, orifice plates, flange-connected regulating valves, main valves, throttle valves, safety valves, instruments, etc. should not be installed. For the above-mentioned valves and instruments connected by welding, the bypass should be used or the seal should be removed. Protective measures such as pieces of equipment. The order of purging should be carried out in the order of main pipe, branch pipe, and drain pipe. The blown out dirt must not enter the pipe that has been purged.

The dirt discharged by purging shall not pollute the environment, and random discharge is strictly prohibited.

A restricted area should be set before purging.

 

After the pipeline has passed the purging, other operations that affect the cleaning shall not be carried out.

 

1. After the strength test of the piping system, before the air pressure tightness test, purge and clean should be carried out in sections

 

2. The method of purging should be determined according to the requirements for the use of the pipeline, the working medium and the degree of dirt on the inner surface of the pipeline. The liquid or gas pipeline with a nominal diameter greater than or equal to 600mm should be manually cleaned, and the liquid pipeline with a nominal diameter less than 600mm should be cleaned manually. Use water to clean the gas pipeline with a nominal diameter of less than 600mm, which should be purged with air. Steam pipes should be purged with steam, and non-thermal pipes should not be purged with steam. The purge is generally carried out in sequence according to the main pipe, branch pipe, and drain pipe.

 

3. Before the pipeline is purged, a detailed purging plan should be prepared and carried out in sections according to the system

 

4. The equipment and pipes that are not allowed to be purged are separated from the purging system.

 

5. After the pipeline is qualified for purging, in addition to the required inspection and restoration work, no other work that affects the cleaning of the pipeline shall be performed, and the "Pipeline System Purging Record"

 

 

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2016

  • Total Annual:

    10000000-50000000

  • Employee Number:

    >100

  • Ecer Certification:

    Active Member

      Hebei Zexu Pipeline Manufacturing Co., Ltd. has a complete production and operation management system and is one of the first companies in the industry to pass the ISO9001 quality management system certification, HSE environment, and occupational health and safety management sys...       Hebei Zexu Pipeline Manufacturing Co., Ltd. has a complete production and operation management system and is one of the first companies in the industry to pass the ISO9001 quality management system certification, HSE environment, and occupational health and safety management sys...

+ Read More

Get in touch with us

  • Reach Us
  • Hebei Zexu Pipe Manufacturing Co., Ltd.
  • Yanshan County, Cangzhou City, Hebei Province
  • Manager Zhao
  • 13603178097
  • https://www.piping-fittings.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement