China factories

China factory - Qingdao KaFa Fabrication Co., Ltd.

Qingdao KaFa Fabrication Co., Ltd.

  • China,Qingdao ,Shandong
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Large Span Portal Frame Prefabricated Steel Structure Factory Construction
China Large Span Portal Frame Prefabricated Steel Structure Factory Construction

  1. China Large Span Portal Frame Prefabricated Steel Structure Factory Construction
  2. China Large Span Portal Frame Prefabricated Steel Structure Factory Construction
  3. China Large Span Portal Frame Prefabricated Steel Structure Factory Construction
  4. China Large Span Portal Frame Prefabricated Steel Structure Factory Construction

Large Span Portal Frame Prefabricated Steel Structure Factory Construction

  1. MOQ: 1000 sqm
  2. Price: USD 45-90 per sqm
  3. Get Latest Price
Supply Ability 15000/month
Delivery Time 6 weeks after shop drawing get approval
Packaging Details In nude or packed on steel pallet and loaded into 40' HQ/OT
Payment Terms L/C, T/T
Material Q355B/Q235B, Steel
Type Light,Heavy,steel Structure
Purlin C/Z Section Galvanized Steel(Q235)
Surface Treatment Hot Dip Galvanised,two Primer And One Top Paint, DFT 70μm
Drawing Design AutoCAD,PKPM,Tekla Structure
Service Life 50 Years
Brand Name Kafa
Place of Origin Shandong, China
Model Number KAFA-2022029
Certification ISO 9001:2015; ISO14001:2015; ISO45001:2018

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Supply Ability 15000/month Delivery Time 6 weeks after shop drawing get approval
Packaging Details In nude or packed on steel pallet and loaded into 40' HQ/OT Payment Terms L/C, T/T
Material Q355B/Q235B, Steel Type Light,Heavy,steel Structure
Purlin C/Z Section Galvanized Steel(Q235) Surface Treatment Hot Dip Galvanised,two Primer And One Top Paint, DFT 70μm
Drawing Design AutoCAD,PKPM,Tekla Structure Service Life 50 Years
Brand Name Kafa Place of Origin Shandong, China
Model Number KAFA-2022029 Certification ISO 9001:2015; ISO14001:2015; ISO45001:2018
High Light Large Span Prefabricated Steel StructurePortal Frame Prefabricated Steel StructureSteel Structure Factory Construction Solution

Well Designed High Strength Large Span Portal Frame Prefabricated Steel Structure Factory Construction Solution

 

The steel structure workshop buildings use steel to form a load-bearing structure. Generally, the load-bearing structure called main frame, which are consist of beam, column and truss. The bracing system are including tie bar, knee bracing, staying bar, column bracing, as well as horizontal bracing. Together with roof system, wall system, and floor system, they are conforming an entire steel structure building.

 

Compared with traditional concrete buildings, metal workshop buildings apply steel plates or sectional steel instead of reinforced concrete, thus the workshop steel structure performs much higher strength, and better seismic resistance. Because of the components mostly being prefabricated in factories and assembled on-site, the construction period is greatly reduced. Due to the re-usability of steel, it can greatly reduce construction waste and become more environmentally friendly.

 

Industrial Portal Frame Steel Structure Workshop Prefab Steel Structure Building 0 Industrial Portal Frame Steel Structure Workshop Prefab Steel Structure Building 1

Specification of the Prefab Steel Structure Workshop Building

 

Dimension Length x Width x Eave height/ Ridge height
Frame type Portal frame, multi-story frame
Main frame Hot-rolled or Welded H beam and column, Q355B steel
Bracing components Tie bar, staying bar, Horizontal bracing, Column bracing
Cladding system Corrugated color steel sheet, sandwich panel with glass wool, rock wool,PU insulation
Accessory Ridge tile, trim, Gutter, Down pipe,skylight, clerestory
Door Sliding door, Roll up door, industrial section door, swing door
Window PVC window, aluminum window, metal louver

 

Advantages of Steel Structure Workshop

 

1. Easy to assemble

The steel components arriving at the construction site are all prefabricated. During the construction process, the installation work needs to layout each structure and erect it according to the installation drawing.

The installation sequence of the steel workshop building is:

First, install the steel columns and column cross-bracing and install roof beams and roof horizontal bracing. Finally, installs the purlin and enclosure structure.

 

2. Reasonable cost:
The steel structure workshop building is light in weight, reducing the basic cost, and the construction speed is fast. It can be completed and put into production as soon as possible. The overall economic benefits are much better than that of the concrete structure

 

3. Simple construction, short construction period.
The production and installation of steel structure usually involve processing all required components in the factory and then transporting to the construction site to assemble. So the construction period is greatly shortened. A 4000 square meter building can be basically installed in only 40 days.

 

4. Energy-saving and environmentally friendly
The corrugated color steel sheet and sandwich panels used in the prefab steel structure workshop are all energy-saving materials. The steel structure also adopts dry construction during the construction process to avoid dust and environmental pollution caused by concrete construction.

 

Design Important Factors

 

1. Reasonable column spacing

Steel structure buildings mainly apply H-section steel columns and steel beams. The spacing of H-section steel columns has a significant influence on the total quantity of steel used and the total cost. We usually apply economic column distance of 6.8m to 9m, based on the normal load of the structures.
As for the projects with special needs, that can be flexibly adjusted. The determination of building height should not only meet the requirements of production equipment and production operations but also consider the height of maintenance more comprehensively.

 

2. Proper lighting and ventilation design

As the enterprises adopt intensive production, the characteristics of large-span and large-space internal spaces are becoming more and more apparent. Therefore, steel building design should pay attention to lighting and ventilation design from the perspective of humanization and energy saving. When the workshop building is tall, the openable window at the bottom of the side exterior wall is used as the primary air inlet. By installing a roof ventilator, the ventilation and lighting problems are easily solved, and the actual operation is relatively simple.

 

Difference between steel structure building and concrete building

 

1.Short construction period

In terms of the construction cycle, the steel structure has obvious advantages. The construction of the steel structure building is very fast because it is prefabricated in the factory and assembled on the construction site. Only slight weld works need be applied on site.

 

2. Environmental Friendly

After transported to the construction site, the steel components only need to be hoisted and spliced. The whole process can be operated without water. There is no flying sand and a large amount of dust, which can reduce environmental pollution and impact on nearby residents.

 

3. Favorable Cost

Steel structure buildings save construction period and labor costs compared with concrete buildings. The total cost of a steel structure building roughly is 20%~30% lower than that of traditional concrete building. What’s more, steel structure is more robust and more durable than concrete.

 

4. Structure Weight

The steel structure itself has the characteristics of lightweight. The walls and roofs of the steel structure are made of light metal building materials, which are much lighter than the brick-concrete wall and roof.


Nearly 20 years of operating experience, KAFA has built our reputation by successfully implementing hundreds of projects in domestic and overseas. With a team of professionally trained engineers, KAFA always has complete solutions suitable for your project with a variety of choices from simple to complex including:

Pre-Engineered Steel Buildings
Buildings For Heavy Industry
Buildings for commodity industry
Industrial Steel Structures

Your satisfaction is our key success factor.
Contact us for the best solutions for your project!

 

        

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Trading Company

  • Year Established:

    2001

  • Total Annual:

    12000000-15000000

  • Employee Number:

    50~100

  • Ecer Certification:

    Verified Supplier

Qingdao KaFa Fabrication Co., Ltd. is a professional steel structure company who could provide you one-stop solution of the steel structure projects . We specialize in Design, Manufacture,Delivery and Installation of the steel structure building. The floor space is... Qingdao KaFa Fabrication Co., Ltd. is a professional steel structure company who could provide you one-stop solution of the steel structure projects . We specialize in Design, Manufacture,Delivery and Installation of the steel structure building. The floor space is...

+ Read More

Get in touch with us

  • Reach Us
  • Qingdao KaFa Fabrication Co., Ltd.
  • Dazhushan Industrial zone , Huangdao District, Qingdao City.
  • MsAlice Lee
  • 0086 13969825647
  • https://www.steelstructure-construction.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement