| Payment Terms | TT |
| Packaging Details | export packing |
| Delivery Time | negotiate |
| DCIM | OwlEye |
| Container Dimensions | 12192 x 2438 x 2896 |
| Container Weight (Fully Equipped) | <25 |
| Access Control | Electronic lock with IC card reader |
| Working / Storage Temperature: °C | -20 to 453 / -40 to 70 |
| Brand Name | LionRock |
| Model Number | All-in-one combined 40ft |
| Place of Origin | Dongguan China |
View Detail Information
Explore similar products
55 Degree All In One Data Center , IP65 Prefabricated Modular Data Centers 20ft
Combined 40ft Prefabricated Data Center , DCIM Modular Data Center Construction
40ft Prefabricated Data Center Solutions 12192x2438x2896mm Dimensions
ODM LionRock Prefabricated Data Center Modular ISO Standard Fire Protection
Product Specification
| Payment Terms | TT | Packaging Details | export packing |
| Delivery Time | negotiate | DCIM | OwlEye |
| Container Dimensions | 12192 x 2438 x 2896 | Container Weight (Fully Equipped) | <25 |
| Access Control | Electronic lock with IC card reader | Working / Storage Temperature: °C | -20 to 453 / -40 to 70 |
| Brand Name | LionRock | Model Number | All-in-one combined 40ft |
| Place of Origin | Dongguan China | ||
| High Light | 40ft Prefabricated Data Center ,Combined Prefabricated Data Center ,DCIM Modular Data Center Construction | ||
Combined 40ft All-in-one Prefabricated Data Center
Power Module1
The power module is a single ISO40HC container with four levels of power capacity that can be upgraded from the basic configuration to
480kW ICT load capacity in steps of 120kW each. Internal arrangement has been designed to allow the upgrade by installing additional power
equipment. Multiple Power Modules can be combined to support even high ICT load.
ICT Module1
Two ICT module designs are available to suit different cabinet depth. They can be combined in different configurations to meet various
operation requirements. Expansion is easy just by adding more modules. Combined with the Power module, there is always a configuration
that meet your requirement.
![]()
General Specifications
| Fire Protection | Type | Automatic fire detection (smoke and heat) with gas suppression system (HFC-227ea) |
| Monitoring and Management | Access Control | Electronic lock with IC card reader |
| Monitoring | Video: Infrared IP cameras Data: PDF, UPS, DC, A/C, Temp & Hum, fire protection, access control and ventilation | |
| HMI | Touch screen | |
| Remote Access | Web, App | |
| Notification | SMS, email | |
| DCIM | OwlEye | |
| Structure | Container Dimensions (W x D x H): mm | 12192 x 2438 x 2896 (ISO40HC) |
| Container Weight (Fully Equipped): T | <25 | |
| Protection Level | IP552 | |
| Environmental Conditions | Working / Storage Temperature: °C | -20 to 453 / -40 to 70 |
| Humidity: % | 5 to 95 | |
| Altitude: m | ≤4000 (derating start >1000) | |
| Corrosion | Class C (500m away from seashore) |
Notes:
1 - Consult 3Tech for customized versions with Tier 3 reliability level or different ICT design load.
2 - Optional IP65 protection level.
3 - Optional maximum temperature up to 55°C.
Company Details
Business Type:
Manufacturer,Exporter,Seller,Other
Year Established:
1998
Employee Number:
300~400
Ecer Certification:
Active Member
Manufacturer of world class product with the best value of power products and Electrical and Mechanical turnkey solution. - Headquarter in Hong Kong with manufacturing facility in Dongguan of China and Nigeria - A strong elite team with best technology know how and experience of impl... Manufacturer of world class product with the best value of power products and Electrical and Mechanical turnkey solution. - Headquarter in Hong Kong with manufacturing facility in Dongguan of China and Nigeria - A strong elite team with best technology know how and experience of impl...
Get in touch with us
Leave a Message, we will call you back quickly!