China factories

China factory - 3tech corporate limited

3tech corporate limited

  • China,Hong kong
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Combined 40ft Prefabricated Data Center , DCIM Modular Data Center Construction
China Combined 40ft Prefabricated Data Center , DCIM Modular Data Center Construction

  1. China Combined 40ft Prefabricated Data Center , DCIM Modular Data Center Construction

Combined 40ft Prefabricated Data Center , DCIM Modular Data Center Construction

  1. MOQ: negotiate
  2. Price: Negotiate
  3. Get Latest Price
Payment Terms TT
Packaging Details export packing
Delivery Time negotiate
DCIM OwlEye
Container Dimensions 12192 x 2438 x 2896
Container Weight (Fully Equipped) <25
Access Control Electronic lock with IC card reader
Working / Storage Temperature: °C -20 to 453 / -40 to 70
Brand Name LionRock
Model Number All-in-one combined 40ft
Place of Origin Dongguan China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms TT Packaging Details export packing
Delivery Time negotiate DCIM OwlEye
Container Dimensions 12192 x 2438 x 2896 Container Weight (Fully Equipped) <25
Access Control Electronic lock with IC card reader Working / Storage Temperature: °C -20 to 453 / -40 to 70
Brand Name LionRock Model Number All-in-one combined 40ft
Place of Origin Dongguan China
High Light 40ft Prefabricated Data Center ,Combined Prefabricated Data Center ,DCIM Modular Data Center Construction

Combined 40ft All-in-one Prefabricated Data Center

Power Module1

The power module is a single ISO40HC container with four levels of power capacity that can be upgraded from the basic configuration to
480kW ICT load capacity in steps of 120kW each. Internal arrangement has been designed to allow the upgrade by installing additional power
equipment. Multiple Power Modules can be combined to support even high ICT load.

 

ICT Module1

Two ICT module designs are available to suit different cabinet depth. They can be combined in different configurations to meet various
operation requirements. Expansion is easy just by adding more modules. Combined with the Power module, there is always a configuration
that meet your requirement.

 

General Specifications

Fire Protection Type Automatic fire detection (smoke and heat) with
gas suppression system (HFC-227ea)
Monitoring and
Management
Access Control Electronic lock with IC card reader
Monitoring Video: Infrared IP cameras
Data: PDF, UPS, DC, A/C, Temp & Hum, fire protection, access control and ventilation
HMI Touch screen
Remote Access Web, App
Notification SMS, email
DCIM OwlEye
Structure Container Dimensions (W x D x H): mm 12192 x 2438 x 2896 (ISO40HC)
Container Weight (Fully Equipped): T <25
Protection Level IP552
Environmental
Conditions
Working / Storage Temperature: °C -20 to 453 / -40 to 70
Humidity: % 5 to 95
Altitude: m ≤4000 (derating start >1000)
Corrosion Class C (500m away from seashore)

 

Notes:

1 - Consult 3Tech for customized versions with Tier 3 reliability level or different ICT design load.

2 - Optional IP65 protection level.
3 - Optional maximum temperature up to 55°C.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller,Other

  • Year Established:

    1998

  • Employee Number:

    300~400

  • Ecer Certification:

    Active Member

Manufacturer of world class product with the best value of power products and Electrical and Mechanical turnkey solution.   - Headquarter in Hong Kong with manufacturing facility in Dongguan of China and Nigeria - A strong elite team with best technology know how and experience of impl... Manufacturer of world class product with the best value of power products and Electrical and Mechanical turnkey solution.   - Headquarter in Hong Kong with manufacturing facility in Dongguan of China and Nigeria - A strong elite team with best technology know how and experience of impl...

+ Read More

Get in touch with us

  • Reach Us
  • 3tech corporate limited
  • (Headquarter) Room 09, 12/F., Tower B, Hunghom Commercial Centre, 37 Ma Tau Wai Road, Hung Hom, Kowloon, Hong Kong.
  • https://www.3tech-powersolutions.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement