China factories

Chat Now Send Email
China factory - Honor Eco Energy Tech Co., Ltd

Honor Eco Energy Tech Co., Ltd

  • China,Shenzhen
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China HECO Installation of ground wire and foundation for Maglev Wind Turbine
China HECO Installation of ground wire and foundation for Maglev Wind Turbine

  1. China HECO Installation of ground wire and foundation for Maglev Wind Turbine
  2. China HECO Installation of ground wire and foundation for Maglev Wind Turbine
  3. China HECO Installation of ground wire and foundation for Maglev Wind Turbine
  4. China HECO Installation of ground wire and foundation for Maglev Wind Turbine
  5. China HECO Installation of ground wire and foundation for Maglev Wind Turbine
  6. China HECO Installation of ground wire and foundation for Maglev Wind Turbine
  7. China HECO Installation of ground wire and foundation for Maglev Wind Turbine

HECO Installation of ground wire and foundation for Maglev Wind Turbine

  1. MOQ: 1pcs
  2. Price: Negotiation
  3. Get Latest Price
Delivery Time 5-15 days
Supply Ability 5000PCS/week
Packaging Details Plywood box
Payment Terms Ex works
Brand Name Honor-ECO
Model Number HECO-300W 12V/24V
Certification CE,TUV, IEC
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Delivery Time 5-15 days Supply Ability 5000PCS/week
Packaging Details Plywood box Payment Terms Ex works
Brand Name Honor-ECO Model Number HECO-300W 12V/24V
Certification CE,TUV, IEC Place of Origin China
High Light construction of wind turbinebuild wind generator

 

HECO Installation of ground wire and foundation for Maglev Wind Turbine

 

 

Foundation for Towers

 

(1) Mining ground: the size of the battery enclosure should be in accordance with construction drawing size. If the soil is too loose at the bottom of the enclosure, we  should dig it deeper.

(2) Four sides brick, do not need to hit the cement wall, lest the water storage is not conducive to discharge

(3) Bottom should be flat water mud surface.

(4) Make cement prefabricated cover and  size is in accordance with the drawings.

 

 

1, Installation of ground wire and foundation

 

1.1 Grounding electrodes into the underground, insert at the bottom of the well mud 40 ~ 50 cm

1.2Lead fastening connection terminal and the foundation of cage.

 

2, Lightning angle iron end inserts in the bottom of the Earth, can only achieve conductive effect. Fastening the cage wire terminals of the Foundation . Place ground cage, require vertical laying, foundations should be two or three centimeters below ground level at the top of the cage, parallel to the road, its center point location and road edge distances according to the drawing requirements and consistent (usually set distance of 50~60 cm)

 

3,Flow backward concrete

 

3.1 Concrete light tower foundation by two times intrusion, intrusion depth ≤ 50% for the first time, fixed to cage. Curing 6-8 hour back in the second time, before the  second intrusion, stretch hose wire is first placed in a cage in the middle of the Central Office, the height to top of cage 8~10 cm of concrete to ensure level cement surface (smooth)

 

 

50% or less, fixed cage. Curing flow backward again after 6 ~ 8 hours for the second time, before the flow backward for the second time, to be wire elastic tube placed in the center of the cage in the middle of the place, the height of the concrete below the top of the cage to 8 to 10 cm, guarantee the cement surface level (flat).

 

3.4 Light tower foundation concrete points twice, the first flow backward depth of 50% or less, fixed cage. Curing flow backward again after 6 ~ 8 hours for the second time, before the flow backward for the second time, to be wire elastic tube placed in the center of the cage in the middle of the place, the height of the concrete below the top of the cage to 8 to 10 cm, guarantee the cement surface level (flat).

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2020

  • Total Annual:

    60000000- 65000000

  • Employee Number:

    35~55

  • Ecer Certification:

    Verified Supplier

Honor Eco Energy Tech Co., Ltd is a pioneer of green energy technology in the world.  Honor Eco Energy  is a technology innovation-oriented enterprise which integrates the research, manufacture, sale and service of maglev wind turbine systems as one set. After seventeen years of arduous e... Honor Eco Energy Tech Co., Ltd is a pioneer of green energy technology in the world.  Honor Eco Energy  is a technology innovation-oriented enterprise which integrates the research, manufacture, sale and service of maglev wind turbine systems as one set. After seventeen years of arduous e...

+ Read More

Get in touch with us

  • Reach Us
  • Honor Eco Energy Tech Co., Ltd
  • A060, CM Port Commercial Bldg., 1 Taizi Rd, Nanshan Shenzhen, China
  • https://www.allsolarkits.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement