Supply Ability | 10000/month |
Delivery Time | 15-30 workdays |
Packaging Details | Carton or as your requirements |
Material | Aluminum Alloy ADC12 A380, Aluminium |
Process | Die Casting |
Aplication | LED Heatsink, LEd Housing. |
Color | Design |
Shape | Square |
Brand Name | LF |
Model Number | LF-Y9210 |
Certification | ISO9001:2008 |
Place of Origin | Dongguan,Mainland China |
View Detail Information
Explore similar products
A3 Q235 Metal Stamping Parts Customized SUS 304 Base For Roller Skate Bottom
Metal Stamping Process Mixed Olives Precision Assembly Power Box
Custom Metal Stamping Parts Silver Anodize Aluminum Driver Box With Polishing
High Quality Circle Clip Stamping Parts Stainless Steel Lock Retaining Rings For
Product Specification
Supply Ability | 10000/month | Delivery Time | 15-30 workdays |
Packaging Details | Carton or as your requirements | Material | Aluminum Alloy ADC12 A380, Aluminium |
Process | Die Casting | Aplication | LED Heatsink, LEd Housing. |
Color | Design | Shape | Square |
Brand Name | LF | Model Number | LF-Y9210 |
Certification | ISO9001:2008 | Place of Origin | Dongguan,Mainland China |
High Light | precision metal stamping ,custom made metal stamps |
Outdoor LED Heat Sink Design for Floodlight Metal Stamping Process ADC12 A380
Specifications:
1. Place of origin: Duangdong China (Mainland)
2. Brand name: LIFONG
3. Material: Aluminum, Aluminum Alloy ADC12 A380
4. Shape: Square
5. Application: LED heatsink .LEd housing.
6. Machine: 180 tons -1200 tons
Specifications
1. 150W outdoor led heat sink design for floodlight
2. RoHS
3. Die cast aluminum ADC12
4. Agent wanted
5. Good cooling
Description:
| Metal Stamping Process | |
Item No. | LF-Y9210 | |
Service | Drawings or sample processing | |
Materials | Aluminium,Aluminum Alloy ADC12 A380 | |
Precision processing | Die Casting | |
QC (inspection everywhere ) | 15-30days,it is up to the order. | |
Package | PP bag/carton or according customers' requirement | |
payment term | T/T,L/C |
Advantages:
1. Professional research and design team, processes all necessary equipment: Extrusion machine: 2 sets, CNC machine: 20 sets (Maximum working platform: 1600*80), drill/threading machining: 25 Machines
2. Strict quality control in each process and finish product quality control
3. Short delivery lead time: 15-30 days
4. Optional for OEM or ODM
5. Comprehensive after-sale service, quick responses for daily communication
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2001
Total Annual:
25,000,000-30,000,000
Employee Number:
450~500
Ecer Certification:
Verified Supplier
Lifong was set up in the year 2011, locates in Dongguan City, Guangdong Province. We provide customers Thermal Solution, Heat Sinks, Other Fabrication Service Like Metal Product Design, tooling making, CNC Machining Process, Casting, Stamping, Sheet Metal Forming, Aluminum Profile extruding, Co... Lifong was set up in the year 2011, locates in Dongguan City, Guangdong Province. We provide customers Thermal Solution, Heat Sinks, Other Fabrication Service Like Metal Product Design, tooling making, CNC Machining Process, Casting, Stamping, Sheet Metal Forming, Aluminum Profile extruding, Co...
Get in touch with us
Leave a Message, we will call you back quickly!