| Tank Material | Stainless Steel / PP/PVC |
| Drying Method | Hot Air |
| Delivery Time | 60-90 days |
| Anodizing Tank Material | PP/ PVC/ Stainless Steel |
| Operation Type | Semiautomatic or Automatic |
| Yield | 60 tons per day |
| Productname | Anodizing Production Line |
| Tank Body | Concrete |
| Color | enjoy customization |
| Application | Aluminum anodizing |
| Anodizing Film Thickness | 8-12µm |
| Treament Range | ALuminium profiles |
| Payment Terms | L/C,T/T |
| Treatment Scope | aluminium alloy profiles |
| Alu Profiles Colour | silver brown black golden champage |
| Packaging Details | Standard Packaging |
| Model Number | MEI-AL-L20261001 |
| Place of Origin | Foshan, China |
| Brand Name | MEI-AL |
View Detail Information
Explore similar products
Horizontal Anodizing Production Line 6500mm Max Profile Length
1000 Ton Manual Anodizing Production Line 10µM - 12µM Micron
150 Ton Anodizing Production Line Aluminum Alloy Horizontal Mode
Horizontal Anodizing Line Construction Automatic Operation Style
Product Specification
| Tank Material | Stainless Steel / PP/PVC | Drying Method | Hot Air |
| Delivery Time | 60-90 days | Anodizing Tank Material | PP/ PVC/ Stainless Steel |
| Operation Type | Semiautomatic or Automatic | Yield | 60 tons per day |
| Productname | Anodizing Production Line | Tank Body | Concrete |
| Color | enjoy customization | Application | Aluminum anodizing |
| Anodizing Film Thickness | 8-12µm | Treament Range | ALuminium profiles |
| Payment Terms | L/C,T/T | Treatment Scope | aluminium alloy profiles |
| Alu Profiles Colour | silver brown black golden champage | Packaging Details | Standard Packaging |
| Model Number | MEI-AL-L20261001 | Place of Origin | Foshan, China |
| Brand Name | MEI-AL | ||
| High Light | 1800 Tons/Month Capacity Anodizing Production Line ,Type II & III Anodizing Automotive Anodizing Line ,PLC-Controlled Automation Turnkey Anodizing System | ||
This turnkey anodizing production line is engineered for manufacturers of high-end automotive aluminum components. The comprehensive system covers the complete process chain—from pre-treatment through anodizing to sealing—within a fully automated PLC-controlled environment.
The system supports both conventional sulfuric acid anodizing (Type II) and hard anodizing (Type III) for automotive aluminum components including brake caliper pistons, valve bodies, trim parts, wheel nuts, heat sinks, and structural brackets. Automotive components require surface treatment to enhance corrosion resistance and wear performance, with anodized layers providing exceptional hardness and integral bonding that prevents peeling or flaking.
Hard anodized coatings demonstrate exceptional corrosion resistance, exceeding 1,000 hours of neutral salt spray exposure without corrosion onset, making them ideal for automotive applications exposed to road salt, moisture, and temperature cycling.
The 1,800 tons/month capacity is optimized for large-scale production of small to medium-sized automotive aluminum parts, with adjustable process parameters based on alloy composition, component geometry, and target film properties.
| Parameter | Specification |
|---|---|
| Applicable Workpieces | Automotive aluminum components (brake caliper pistons, valve bodies, trim parts, wheel nuts, heat sinks, structural brackets) |
| Operation Mode | Fully automatic PLC-controlled with manual override |
| Anodizing Type | Type II Sulfuric Acid Anodizing / Type III Hard Anodizing (configurable) |
| Film Thickness | Type II: 5-25 μm; Type III: 25-80 μm (per MIL-A-8625F, Type III nominal range 12.7-114 μm) |
| Surface Finish | Matte, Satin, Chemical Polished, or Sandblasted pre-treated finish |
| Process Temperature | Type II: 18°C - 22°C; Type III: −9°C - −4°C (anodizing); Sealing: up to 95°C |
| Current Density | Type II: 1.0-2.5 A/dm²; Type III: 2.0-3.3 A/dm² (adjustable by alloy and part geometry) |
| Production Capacity | 1,800 tons/month (dependent on surface area per ton and cycle time) |
| Sealing Method | Hot deionized water sealing / Nickel acetate sealing / Cold sealing (configurable) |
| Property | Type II (Sulfuric Anodize) | Type III (Hard Anodize) |
|---|---|---|
| Corrosion Resistance | >336 hrs salt spray | 1,000-2,000 hrs salt spray |
| Wear Resistance | 15.4 mg loss (Suga test) | 3.4 mg loss (Suga test) |
| Hardness | -- | 60-70 HRC |
Source: Pioneer Metal Finishing technical bulletin based on MIL-A-8625 testing data.
The production line follows a sequential multi-stage process:
Each stage is controlled by the central PLC system, with automated gantry crane transfer between tanks. Rinse stages incorporate cascading counter-flow to reduce water consumption. The anodizing stage uses a rectifier with stable DC output or pulse capability, and electrolyte temperature is maintained within set thresholds by an industrial chiller system.
The rectifier and PLC system regulate current density and oxidation time to achieve target film thickness. Per MIL-A-8625F, Type III hard anodic coatings do not vary by more than ±20% for coatings up to 50 μm thick. The rectifier operates with programmable current/voltage loading stages to support predictable oxide growth rates across component geometries.
A central PLC system manages hoist movement schedules, immersion times, temperature profiles, and rectifier parameters with real-time data logging. This reduces manual intervention and supports process traceability across production batches.
Automated chemical dosing systems and temperature-regulated dye tanks maintain stable bath compositions, contributing to consistent results across production runs. The sealed bath chemistry is monitored via conductivity and pH sensors, with automatic dosing to maintain electrolyte concentration within set parameters.
Industrial chillers combined with titanium heat exchangers regulate electrolyte temperatures within set thresholds. For hard anodizing, the chiller maintains electrolyte temperature between −9°C and −4°C during processing. Continuous multi-stage micron filtration maintains bath clarity and contributes to uniform coating formation.
The tank layout supports interchangeable pre-treatment options, allowing transitions between chemical polishing, satin etching, and matte anodizing depending on product specifications. Coloring can be integrated via organic dye or electrolytic coloring tanks. Sealing methods are configurable to balance corrosion resistance and hardness retention requirements.
A typical line layout includes the following major equipment:
The line footprint and tank dimensions are customized based on maximum workpiece size and required throughput.
Every production scenario differs in workpiece geometry, alloy mix, and throughput target. We provide customized line layouts and process solutions based on your specific requirements—including tank sizing, crane configuration, rectifier capacity, and treatment cycle design.
To receive a tailored proposal, please share:
Our engineering team will respond with a proposed line layout, equipment list, and estimated process cycle time.
Company Details
Business Type:
Manufacturer
Year Established:
2011
Total Annual:
430000-10000000
Employee Number:
50~90
Ecer Certification:
Verified Supplier
Guangdong MEI-AL Technology | Leading Anodizing Line Manufacturer Since 2011 MEI-AL Technology has been committed to serve the aluminum profile surface treatment industry with its strong technical force, excellent production and processing, scientific management methods and excellent m... Guangdong MEI-AL Technology | Leading Anodizing Line Manufacturer Since 2011 MEI-AL Technology has been committed to serve the aluminum profile surface treatment industry with its strong technical force, excellent production and processing, scientific management methods and excellent m...
Get in touch with us
Leave a Message, we will call you back quickly!