China factories

China factory - Greentech (Tianjin) Anti-corrosion Engineering Tech Co.,Ltd

Greentech (Tianjin) Anti-corrosion Engineering Tech Co.,Ltd

  • China,Tianjin ,Tianjin
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant
China Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant

  1. China Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant
  2. China Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant

Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant

  1. MOQ: 500kg
  2. Price: $2.6-5.8/kg
  3. Get Latest Price
Supply Ability 1000 tons per month
Packaging Details 20kg/carton
Raw Material Epoxy Polyester Hybird resin
Color Ral color
usage indoor
Gel time 250±50
Application Method Electrostatic spray
Gloss high/Low/Matt
Brand Name Greentech
Model Number 3524
Certification SGS
Place of Origin Tianjin,China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Supply Ability 1000 tons per month Packaging Details 20kg/carton
Raw Material Epoxy Polyester Hybird resin Color Ral color
usage indoor Gel time 250±50
Application Method Electrostatic spray Gloss high/Low/Matt
Brand Name Greentech Model Number 3524
Certification SGS Place of Origin Tianjin,China
High Light powder coating powderexterior powder coating

electrostatic epoxy polyester resin powder coating

 

Feature:

  1. Excellent adhesion, flexibility, impact resistance, high hardness. Good flow property, vividness, fullness, saturation, beautiful decoration.
  2. To improve the reaction rate of the material, to enhance the effect of seculars reflection, light saturation capacity. Reflection effect, decorative effect is improved.
  3. The protection of pigment is much better.
  4. Giving coating more functional elements according to the different requirement, such as waterproof and rust-proof.
  5. Make the powder coating easy to reach grooves, corner.
  6. Powder rate is high, the coating with high efficiency, spraying area is large, the cost is lower than the paint coating.
  7. Environmental protection, excluding volatile matter, no smell of paint, do not contain heavy metals and polybrominated biphenyl (certification testing by SGS), in line with the international general standards, without any toxic and side effects

 

Item Test standard and method Test
Appearance Color uniform, loose without blocking, dry coating liquidity 120—140mm visual
color As customer required Chromatic meter
Adhesion GB/T9286-1998 ISO2409 0 class
Impact resistance GB/T1732-1993 ISO6272 50kg.cm
flexibility GB/6742-1986 ISO1519 3mm
Cupping test GB/T9753-1993 ISO1520 8mm
Pencil hardness GB/T6739-1996 ASTM/D3363 1H-2H
Salt spray testing GB/T1771-1991 ISO7253 > 500hour
Heat resistance 150℃/24 hours(white) <0.5
Humid and hot resistance GB/T1740-1979 ISO6270 >1000hous
         

 

Application areas: air conditioning, refrigerator, microwave ovens, cooking hoods electric kettles and other household appliances shell

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    2011

  • Total Annual:

    1.8million-3.6million

  • Employee Number:

    120~150

  • Ecer Certification:

    Active Member

Greentech (Tianjin) Anti-corrosion Engineering Tech Co.,Ltd. was founded in 2011, is a large-scale research and development of powder coating and production-oriented enterprises. The mainly product is thermosetting powder coating. The company registered capital is 12 million RMB, currently has 120 e... Greentech (Tianjin) Anti-corrosion Engineering Tech Co.,Ltd. was founded in 2011, is a large-scale research and development of powder coating and production-oriented enterprises. The mainly product is thermosetting powder coating. The company registered capital is 12 million RMB, currently has 120 e...

+ Read More

Get in touch with us

  • Reach Us
  • Greentech (Tianjin) Anti-corrosion Engineering Tech Co.,Ltd
  • 25 Building, No.1 Hua ke Three Road, Huayuan Industry Zone, Tianjin,China
  • https://www.anticorrosionpowdercoating.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement