Payment Terms | L/C, T/T |
Supply Ability | 30 sets per month |
Delivery Time | Within 30-40 Days After The Deposit |
Packaging Details | General Container, Open Top Container, Skeletal Container, Bulk Cargo |
Type | H beam shot blasting machine |
Working speed | 0.5-4m/s |
Cleaning type | Automatic |
Function | Cleaning machine |
Abrator type | Automatic |
Blasting media | Steel shot, steel grit, cut wire shot |
Brand Name | LC |
Model Number | Q698, Q6910, Q6918, Q6920 |
Certification | ISO9001 |
Place of Origin | Jiangsu, China |
View Detail Information
Explore similar products
Continuous Type Steel Plate Shot Blasting Machine With Cut Wire Shot 4m / Min
Rust Removal Shot Blast Cleaning Equipment Custom Colors With 11KW Turbine Power
Steel Abrator Blast Cleaning Machine , Dustless Blasting Machine With Steel Grit
Pass Through Type H Beam Shot Blasting Machine Steel Metal Parts Cleaning
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 30 sets per month |
Delivery Time | Within 30-40 Days After The Deposit | Packaging Details | General Container, Open Top Container, Skeletal Container, Bulk Cargo |
Type | H beam shot blasting machine | Working speed | 0.5-4m/s |
Cleaning type | Automatic | Function | Cleaning machine |
Abrator type | Automatic | Blasting media | Steel shot, steel grit, cut wire shot |
Brand Name | LC | Model Number | Q698, Q6910, Q6918, Q6920 |
Certification | ISO9001 | Place of Origin | Jiangsu, China |
High Light | shot peening machine ,industrial shot blaster |
Automatic H Beam Shot Blasting Machine for Surface Cleaning
Production description
Our machines can cleaning different size H beam. Please tell us your workpieces size, then we can design it according to your requirment, and our professional enginners will find the best solution for you.
Where is it used
1. Steel plate surface cleaning.
2. Derusting for the surface of steel structure.
3. Surface cleaning of steel pipe.
4. Stone floor surface treatment.
5. Cleaning up the beam steel or other metal structure workpieces .
6. Cleaning up the heat metal workpieces.
7. Mantenance and derusting of hull surface
8. Cleaning up the beam steel or other metal structure workpieces of highways.
9. Other surface treatment........
Working principle
H beam shot blasting machine, in the cleaning process ,the adjustable speed conveyor roller is controlled by the electric, it will transport the steel workpieces or steel projectile body to the blasting area of cleaning machine room , its whole body on each side is hit and friction by the strong intensive projectile from different coordinate orientation , so that the oxide scale, rust and dirt on the rapidly falling, get some roughness and smooth steel surface ,on both sides of the exits and entrances of outdoor ,roller loadand unload the workpieces. Projectiles falled above the steel and dust and rust is purged by the venting device , scattered down the pill dust mixture is transported by screw conveyor into the chamber funnel, vertical and horizontal screw conveyor brings together below the lelevator, then rise to separater on the upper part , purity projectile after separation drops in the separator hopper for recycling shot blasting. the dust produced during the shot blast cleaning is sent to the dust removal system by the exhaust pipe, treated air is discharge to atmosphere,the granular dust is collected.
Technical parameter
Q698 | Q6910 | Q6912 | |
Entrance Dimension | 800x1600mm | 1000x1800mm | 1200x2000mm |
Turbines | 8 | 8 | 8 |
Turbine Power | 7.5KW | 11KW | 15KW |
Conveying Speed | 0.5~4m/min | 0.5~4m/min | 0.5~4m/min |
Blasting Speed | 0.5~1.5m/min | 0.5~1.5m/min | 0.5~51.m/min |
Surface Cleaning Grade | SA 2.5 | SA 2.5 | SA 2.5 |
Conveyor Loading Capacity | 1,500Kg | 2,000Kg | 2,000Kg |
Dust Collector | Filter Cartridge | Filter Cartridge | Filter Cartridge |
Additional Information
1. Production time: 20-30 days
2. Installation and commissioning time: 20 days
3. Installation and commissioning issue: Longcheng will send 1- 2 technicians to help with machine installation and commissioning for our shot blasting machine, the customer pays for their tickets, hotel and diet, and salary is USD 70 per day per person.
4. Warranty time of shot blasting machine: 12 months from date of commissioning completion, but no more than 18 months from date of delivery.
5. Payment terms: 30% as down payment, 70% balance at sight of B/L copy before delivery
6. Longcheng supplies full English documents, including general installation drawing, pit design drawing, manual book, electric wiring diagram, electric manual book, maintenance book and etc.
NOTE:
According to your requirements, the most suitable machines will be designed for your workpieces please indicate the following details.
1. what kind of workpiece will you clean?
2. The workpiece size, length, width and height of maximum workpiece?
3. How many workpieces do you want to clean per day?
Company Details
Business Type:
Manufacturer
Year Established:
2000
Total Annual:
80million-100million
Employee Number:
200~250
Ecer Certification:
Active Member
Jiangsu Longcheng Casting Machinery Technology Co., Ltd is a collection of scientific research, manufacturing, sales at home and abroad and sales services for the metal surface treatment equipment locating in Dafeng, Yancheng City, a beautiful scenery zone of Yellow Sea which is close to Shanghai Po... Jiangsu Longcheng Casting Machinery Technology Co., Ltd is a collection of scientific research, manufacturing, sales at home and abroad and sales services for the metal surface treatment equipment locating in Dafeng, Yancheng City, a beautiful scenery zone of Yellow Sea which is close to Shanghai Po...
Get in touch with us
Leave a Message, we will call you back quickly!