China factories

China factory - KingPo Technology Development Limited

KingPo Technology Development Limited

  • China,Hong kong ,Hong kong
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China IEC62560-1 Figure 8 Test Circuit For Non-Dimmable Lamp At Dimmer Or Electronic
China IEC62560-1 Figure 8 Test Circuit For Non-Dimmable Lamp At Dimmer Or Electronic

  1. China IEC62560-1 Figure 8 Test Circuit For Non-Dimmable Lamp At Dimmer Or Electronic
  2. China IEC62560-1 Figure 8 Test Circuit For Non-Dimmable Lamp At Dimmer Or Electronic
  3. China IEC62560-1 Figure 8 Test Circuit For Non-Dimmable Lamp At Dimmer Or Electronic
  4. China IEC62560-1 Figure 8 Test Circuit For Non-Dimmable Lamp At Dimmer Or Electronic

IEC62560-1 Figure 8 Test Circuit For Non-Dimmable Lamp At Dimmer Or Electronic

  1. MOQ: 1
  2. Price: To be quoted
  3. Get Latest Price
Payment Terms T/T
Packaging Details safety carton pack or plywood box
Standard IEC62560-1 fig8
Purpose Testing a Non-Dimmable Lamp at a Dimmer or Electronic Switch
Testing a Non-Dimmable Lamp at a Dimmer or Electronic Switch 105 X 267 X220 W *D*H mm
Ammeter input Power AC 220V 50Hz
Brand Name KingPo
Certification Calibration Certificate (ISO17025)
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Packaging Details safety carton pack or plywood box
Standard IEC62560-1 fig8 Purpose Testing a Non-Dimmable Lamp at a Dimmer or Electronic Switch
Testing a Non-Dimmable Lamp at a Dimmer or Electronic Switch 105 X 267 X220 W *D*H mm Ammeter input Power AC 220V 50Hz
Brand Name KingPo Certification Calibration Certificate (ISO17025)
Place of Origin China
High Light temperature rise test equipmentled testing equipment

 

Test Circuit For Testing a Non-Dimmable Lamp at a Dimmer or Electronic Switch

 

1. Use

Applying non-dimmable self-ballasted lamps on a dimmer or an electronic switch is to be tested as a possible case of abnormal operation..

2. Reference standards

IEC60560-Fig8

4. Technical parameters

 

 

Internal dimension 105 X 267 X220 W *D*H mm
2 potentiometer R1
3 resistor R
4 Triac BTA16/700
5 Diac DB3
6 capacitor C1 = 100 nF
7 capacitor C2 = 68 nF to 150 nF
8 induction L1 = 3 mH
9 basic load, incandescent lamp P = 60 W
11 I r.m.s. Ammeter
Ammeter input Power AC 220V 50Hz

Test procedure:

Determine R1 and S1 setting at which the maximum I r.m.s . occurs.

Test at this situation, and if the lamp passively fails within 60 min, repeat the test at 10 % lower I r.m.s . The lower I r.m.s . shall be set in the decreasing potentiometer resistance direction.

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2000

  • Employee Number:

    50~200

  • Ecer Certification:

    Verified Supplier

Kingpo Technology Development Limited is a pioneer and leader of global safety testing equipment manufacturer.We offer one-stop service for worldwide labs from R&D,testing,production to after-sales service.We dedicate ourselves in achieving optimal production quality for our customers,reduce cos... Kingpo Technology Development Limited is a pioneer and leader of global safety testing equipment manufacturer.We offer one-stop service for worldwide labs from R&D,testing,production to after-sales service.We dedicate ourselves in achieving optimal production quality for our customers,reduce cos...

+ Read More

Get in touch with us

  • Reach Us
  • KingPo Technology Development Limited
  • RM C, 13/F, HARVARD COMMERCIAL BUILDING, 105-111 THOMSON ROAD, WAN CHAI, HK
  • MsLynette Wong
  • +86-769-81627526
  • https://www.batterytestingmachine.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement