Payment Terms | T/T |
Supply Ability | 80 pcs per month |
Delivery Time | 7 working days |
Packaging Details | safety carton pack or plywood box |
Standard | JIS C 8303 |
brand | KingPo |
Calibration Certificate | ISO17025 |
Material | steel |
Brand Name | kingpo |
Model Number | JIS C 8303 |
Certification | iso9001 ce |
Place of Origin | china |
View Detail Information
Explore similar products
UL498 Plug Socket Tester American Standard Plug And Socket Gauge
BS1363-1:1995 Figure 5 | Gauge For Plug Pins | British Standard BS1363 Figure 5
IEC60884-1 Figure 44 Clause 19 Temperature Rise Test Equipment
SN 441011-2-3:2019 Lehre J1 Gauge For Suisse Plugs
Product Specification
Payment Terms | T/T | Supply Ability | 80 pcs per month |
Delivery Time | 7 working days | Packaging Details | safety carton pack or plywood box |
Standard | JIS C 8303 | brand | KingPo |
Calibration Certificate | ISO17025 | Material | steel |
Brand Name | kingpo | Model Number | JIS C 8303 |
Certification | iso9001 ce | Place of Origin | china |
High Light | JIS C 8303 Plugs And Receptacles ,JIS C 8303 Standard Plugs Receptacles |
JIS C 8303 Plugs and receptacles for domestic and similar general use
No. | Items | Description | Qty |
1 | A1 | JISC8303-Figure A.1 Verification of the maximum withdrawal force gauge | 1 |
2 | JISC8303-Figure A.1 Verification of the minimum withdrawal force gauge | 1 | |
3 | JISC8303-Figure A.1 Temperature rise gauge | 1 | |
4 | JISC8303-Figure A.1 Breaking capacity / Normal operation gauge | 1 | |
5 | A2 | JISC8303-Figure A.2 Verification of the maximum withdrawal force gauge | 1 |
6 | JISC8303-Figure A.2 Verification of the minimum withdrawal force gauge | 1 | |
7 | JISC8303-Figure A.2 Temperature rise gauge | 1 | |
8 | JISC8303-Figure A.2 Breaking capacity / Normal operation gauge | 1 | |
9 | A3 | JISC8303-Figure A.3 Verification of the maximum withdrawal force gauge | 1 |
10 | JISC8303-Figure A.3 Verification of the minimum withdrawal force gauge | 2 | |
11 | JISC8303-Figure A.3 Temperature rise gauge | 1 | |
12 | JISC8303-Figure A.3 Breaking capacity / Normal operation gauge | 1 | |
13 | A4 | JISC8303-Figure A.4 Verification of the maximum withdrawal force gauge | 1 |
14 | JISC8303-Figure A.4 Verification of the minimum withdrawal force gauge | 1 | |
15 | JISC8303-Figure A.4 Temperature rise gauge | 1 | |
16 | JISC8303-Figure A.4 Breaking capacity / Normal operation gauge | 1 | |
17 | A5 | JISC8303-Figure A.5 Verification of the maximum withdrawal force gauge | 1 |
18 | JISC8303-Figure A.5 Verification of the minimum withdrawal force gauge | 1 | |
19 | JISC8303-Figure A.5 Temperature rise gauge | 1 | |
20 | JISC8303-Figure A.5 Breaking capacity / Normal operation gauge | 1 | |
21 | A8 | JISC8303-Figure A.8 Verification of the maximum withdrawal force gauge | 1 |
22 | JISC8303-Figure A.8Verification of the minimum withdrawal force gauge | 1 | |
23 | JISC8303-Figure A.8Temperature rise gauge | 1 | |
24 | JISC8303-Figure A.8 Breaking capacity / Normal operation gauge | 1 | |
25 | A9 | JISC8303-Figure A.9 Verification of the maximum withdrawal force gauge | 1 |
26 | JISC8303-Figure A.9 Verification of the minimum withdrawal force gauge | 2 | |
27 | JISC8303-Figure A.9 Temperature rise gauge | 1 | |
28 | JISC8303-Figure A.9 Breaking capacity / Normal operation gauge | 1 | |
29 | A10 | JISC8303-Figure A.10 Verification of the maximum withdrawal force gauge | 1 |
30 | JISC8303-Figure A.10 Verification of the minimum withdrawal force gauge | 2 | |
31 | JISC8303-Figure A.10Temperature rise gauge | 1 | |
32 | JISC8303-Figure A.10 Breaking capacity / Normal operation gauge | 1 | |
33 | A11 | JISC8303-Figure A.11Verification of the maximum withdrawal force gauge | 1 |
34 | JISC8303-Figure A.11Verification of the minimum withdrawal force gauge | 2 | |
35 | JISC8303-Figure A.11Temperature rise gauge | 1 | |
36 | JISC8303-Figure A.11Breaking capacity / Normal operation gauge | 1 | |
37 | A12 | JISC8303-Figure A.12Verification of the maximum withdrawal force gauge | 1 |
38 | JISC8303-Figure A.12Verification of the minimum withdrawal force gauge | 2 | |
39 | JISC8303-Figure A.12Temperature rise gauge | 1 | |
40 | JISC8303-Figure A.12Breaking capacity / Normal operation gauge | 1 | |
41 | A12 | JISC8303-Figure A.13Verification of the maximum withdrawal force gauge | 1 |
42 | JISC8303-Figure A.13Verification of the minimum withdrawal force gauge | 2 | |
43 | JISC8303-Figure A.13Temperature rise gauge | 1 | |
44 | JISC8303-Figure A.13Breaking capacity / Normal operation gauge | 1 | |
45 | A14 | JISC8303-Figure A.14Verification of the maximum withdrawal force gauge | 1 |
46 | JISC8303-Figure A.14Verification of the minimum withdrawal force gauge | 2 | |
47 | JISC8303-Figure A.14Temperature rise gauge | 1 | |
48 | JISC8303-Figure A.14Breaking capacity / Normal operation gauge | 1 | |
49 | A16 | JISC8303-Figure A.16Verification of the maximum withdrawal force gauge | 1 |
50 | JISC8303-Figure A.16Verification of the minimum withdrawal force gauge | 3 | |
51 | JISC8303-Figure A.16Temperature rise gauge | 1 | |
52 | JISC8303-Figure A.16Breaking capacity / Normal operation gauge | 1 | |
53 | A18 | JISC8303-Figure A.18Verification of the maximum withdrawal force gauge | 3 |
54 | JISC8303-Figure A.18Verification of the minimum withdrawal force gauge | 1 | |
55 | JISC8303-Figure A.18Temperature rise gauge | 3 | |
56 | JISC8303-Figure A.18Breaking capacity / Normal operation gauge | 3 | |
57 | A19 | JISC8303-Figure A.19Verification of the maximum withdrawal force gauge | 3 |
58 | JISC8303-Figure A.19Verification of the minimum withdrawal force gauge | 1 | |
59 | JISC8303-Figure A.19Temperature rise gauge | 3 | |
60 | JISC8303-Figure A.19Breaking capacity / Normal operation gauge | 3 | |
61 | A20 | JISC8303-Figure A.20Verification of the maximum withdrawal force gauge | 1 |
62 | JISC8303-Figure A.20Verification of the minimum withdrawal force gauge | 2 | |
63 | JISC8303-Figure A.20Temperature rise gauge | 1 | |
64 | JISC8303-Figure A.20Breaking capacity / Normal operation gauge | 1 | |
65 | A21 | JISC8303-Figure A.21Verification of the maximum withdrawal force gauge | 1 |
66 | JISC8303-Figure A.21Verification of the minimum withdrawal force gauge | 2 | |
67 | JISC8303-Figure A.21Temperature rise gauge | 1 | |
68 | JISC8303-Figure A.21Breaking capacity / Normal operation gauge | 1 | |
69 | A22 | JISC8303-Figure A.22Verification of the maximum withdrawal force gauge | 1 |
70 | JISC8303-Figure A.22Verification of the minimum withdrawal force gauge | 2 | |
71 | JISC8303-Figure A.22Temperature rise gauge | 1 | |
72 | JISC8303-Figure A.22Breaking capacity / Normal operation gauge | 1 | |
73 | A23 | JISC8303-Figure A.23Verification of the maximum withdrawal force gauge | 1 |
74 | JISC8303-Figure A.23Verification of the minimum withdrawal force gauge | 2 | |
75 | JISC8303-Figure A.23Temperature rise gauge | 1 | |
76 | JISC8303-Figure A.23Breaking capacity / Normal operation gauge | 1 | |
77 | A24 | JISC8303-Figure A.24Verification of the maximum withdrawal force gauge | 1 |
78 | JISC8303-Figure A.24Verification of the minimum withdrawal force gauge | 2 | |
79 | JISC8303-Figure A.24Temperature rise gauge | 1 | |
80 | JISC8303-Figure A.24Breaking capacity / Normal operation gauge | 1 | |
81 | A25 | JISC8303-Figure A.25Verification of the maximum withdrawal force gauge | 1 |
82 | JISC8303-Figure A.25Verification of the minimum withdrawal force gauge | 3 | |
83 | JISC8303-Figure A.25Temperature rise gauge | 1 | |
84 | JISC8303-Figure A.25Breaking capacity / Normal operation gauge | 1 | |
85 | A26 | JISC8303-Figure A.26Verification of the maximum withdrawal force gauge | 1 |
86 | JISC8303-Figure A.26Verification of the minimum withdrawal force gauge | 3 | |
87 | JISC8303-Figure A.26Temperature rise gauge | 1 | |
88 | JISC8303-Figure A.26Breaking capacity / Normal operation gauge | 1 | |
89 | A27 | JISC8303-Figure A.27Verification of the maximum withdrawal force gauge | 1 |
90 | JISC8303-Figure A.27Verification of the minimum withdrawal force gauge | 3 | |
91 | JISC8303-Figure A.27Temperature rise gauge | 1 | |
92 | JISC8303-Figure A.27Breaking capacity / Normal operation gauge | 1 | |
93 | A28 | JISC8303-Figure A.28Verification of the maximum withdrawal force gauge | 1 |
94 | JISC8303-Figure A.28Verification of the minimum withdrawal force gauge | 2 | |
95 | JISC8303-Figure A.28Temperature rise gauge | 1 | |
96 | JISC8303-Figure A.28Breaking capacity / Normal operation gauge | 1 | |
97 | A29 | JISC8203-Figure A.29Verification of the maximum withdrawal force gauge | 1 |
98 | JISC8203-Figure A.29Verification of the minimum withdrawal force gauge | 2 | |
99 | JISC8203-Figure A.29Temperature rise gauge | 1 | |
100 | JISC8303-Figure A.29Breaking capacity / Normal operation gauge | 1 |
Company Details
Business Type:
Manufacturer,Trading Company,Exporter,Seller
Year Established:
2000
Total Annual:
8000000-1500000
Employee Number:
50~200
Ecer Certification:
Verified Supplier
KingPo Technology Development Limited is a global leader in manufacturing battery testing machines, environmental test chambers, and safety compliance testing equipment. As an industry pioneer, we provide one-stop solutions for laboratories worldwide, spanning R&D, testing, production, and after... KingPo Technology Development Limited is a global leader in manufacturing battery testing machines, environmental test chambers, and safety compliance testing equipment. As an industry pioneer, we provide one-stop solutions for laboratories worldwide, spanning R&D, testing, production, and after...
Get in touch with us
Leave a Message, we will call you back quickly!