China factories

Chat Now Send Email
China factory - KingPo Technology Development Limited

KingPo Technology Development Limited

  • China,Hong kong ,Hong kong
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China IEC 60335-2-84 Ammonia and Hydrochloric acid for polluted atmosphere
China IEC 60335-2-84 Ammonia and Hydrochloric acid for polluted atmosphere

  1. China IEC 60335-2-84 Ammonia and Hydrochloric acid for polluted atmosphere
  2. China IEC 60335-2-84 Ammonia and Hydrochloric acid for polluted atmosphere

IEC 60335-2-84 Ammonia and Hydrochloric acid for polluted atmosphere

  1. MOQ: 1
  2. Price: To be quoted
  3. Get Latest Price
Temperature Range RT
Power Supply AC220V 4KW 50HZ
Payment Terms T/T
Packaging Details safety carton pack or plywood box
Brand Name KingPo
Model Number KP-1700L
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Temperature Range RT Power Supply AC220V 4KW 50HZ
Payment Terms T/T Packaging Details safety carton pack or plywood box
Brand Name KingPo Model Number KP-1700L
Place of Origin China
High Light 1728L Capacity Corrosion Test ChamberAC220V Power Supply Corrosion Test ChamberTemperature Control ±1℃ Battery Testing Equipment
Toilet Hydrochloric Acid Ammonia Corrosion Test Chamber
Professional corrosion testing chamber designed for evaluating material resistance to hydrochloric acid and ammonia exposure under controlled conditions.
Performance Specifications
  • Temperature range: RT
  • Temperature control accuracy: ±1℃
  • Uniform temperature distribution: ±2.0℃
  • Test time: 0-999H M adjustable
  • Equipment placement space: 3000 * 2000 * 2000 mm (W * H * D)
  • Inner box size: W1200 * D1200 * H1200mm
  • Power supply: AC220V 400KW 50HZ
  • Ammonia concentration: 0.01-0.1% (volume percentage)
  • Hydrochloric acid concentration: 0.0001-0.001 (volume percentage)
  • Box material: PP
  • Internal volume: 1728L
Note: Performance measurements require temperature sensor stability for 30 minutes prior to measurement.
System Structure
Machine Materials
  • Inner/outer boxes: PP acid/alkali resistant material with thermal insulation foaming
  • Glass rotor flowmeter: Corrosion-resistant with precise control
  • Sealing joints/hardware: PP + Teflon + titanium alloy + 316L stainless steel
  • Door material: 12mm tempered glass
Waste Disposal System
  • 40W large air volume inlet fan with electric ball valve switch
  • Large diameter spray pipe with R20 and filter cotton (90%+ exhaust filtration)
Heating System
  • Corrosion-resistant titanium alloy electric heating tube
Control System
  • PID controller with temperature control
  • Temperature accuracy: ±1.0℃
  • PT100*1 (dry ball) input signal
  • 4-20MA temperature/humidity conversion output
Working Principle
  • Ammonia flow controlled via digital mass flow meter in PLC
  • Hydrochloric acid pumped via digital micro flow pump in PLC
  • Automatic shutoff when set values are reached
Installation Requirements
  • Power supply: AC220V MAX 10A (±5% voltage, ±1% frequency fluctuation)
  • Humidification water: Purified/distilled water (minimum 10L initial preparation)
  • Level, vibration-free surface with proper drainage
  • Separate space with good ventilation, away from flammable materials
  • Exhaust outlet must connect to outdoors
Power Supply Specifications
Specification Value
Power Wiring 1¢2W220VAC 50/60HZ
Power Line Diameter 1.0~1.5m㎡ (for length ≤10m)
Operation Procedures
  1. Power on sequence: User switch → Main power switch → Panel power
  2. Set temperature, flow rate, and time parameters
  3. Close door securely before operation
  4. Initiate test via controller
  5. Activate exhaust treatment (20-30 minutes) before product removal
Safety Precautions
WARNING:
  • Absolutely prohibited for explosive, flammable, or highly corrosive substances
  • Door must remain closed during operation to prevent gas leaks
  • Wear protective equipment (gloves, goggles) when handling chemicals
  • Proper grounding essential to prevent static hazards
Maintenance Requirements
  • Clean distribution room annually
  • Inspect/test safety devices regularly
  • Clean internal/external surfaces annually with detergent
  • Use dry, corrosion-resistant gloves for product removal
Included Accessories
  • Instruction manual
  • Bottom layer plate
  • Exhaust pipe
  • Bottle of glacial acetic acid
Troubleshooting Guide
Fault Condition Possible Cause Solution
Machine not powering on Power supply abnormality Check/reconnect power
Flow control failure Loose connections Check all joints
Controller malfunction I/O board issue Re-plug or contact manufacturer

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company,Exporter,Seller

  • Year Established:

    2000

  • Total Annual:

    8000000-1500000

  • Employee Number:

    50~200

  • Ecer Certification:

    Verified Supplier

.gtr-container { font-family: 'Arial', sans-serif; color: #333; line-height: 1.6; max-width: 1000px; margin: 0 auto; padding: 20px; } .gtr-heading { font-size: 18px !important; font-weight: 600; color: #2a5885; margin: 25px 0 15px 0; padding-bottom: 8px; border-bottom: 2px ... .gtr-container { font-family: 'Arial', sans-serif; color: #333; line-height: 1.6; max-width: 1000px; margin: 0 auto; padding: 20px; } .gtr-heading { font-size: 18px !important; font-weight: 600; color: #2a5885; margin: 25px 0 15px 0; padding-bottom: 8px; border-bottom: 2px ...

+ Read More

Get in touch with us

  • Reach Us
  • KingPo Technology Development Limited
  • RM C, 13/F, HARVARD COMMERCIAL BUILDING, 105-111 THOMSON ROAD, WAN CHAI, HK
  • https://www.batterytestingmachine.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement