China factories

Chat Now Send Email
China factory - KingPo Technology Development Limited

KingPo Technology Development Limited

  • China,Hong kong ,Hong kong
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Toilet Seat Extrusion Tester with AC220V±10% Power Supply 0.5MPa Driving Air
China Toilet Seat Extrusion Tester with AC220V±10% Power Supply 0.5MPa Driving Air

  1. China Toilet Seat Extrusion Tester with AC220V±10% Power Supply 0.5MPa Driving Air
  2. China Toilet Seat Extrusion Tester with AC220V±10% Power Supply 0.5MPa Driving Air

Toilet Seat Extrusion Tester with AC220V±10% Power Supply 0.5MPa Driving Air

  1. MOQ: 1
  2. Price: To be quoted
  3. Get Latest Price
Payment Terms T/T
Packaging Details safety carton pack or plywood box
Power Supply AC220V±10%, 50/60Hz
Driving Air Pressure 0.5MPa
Force Application Time 0~99.9 seconds can be set [standard 4 seconds]
Brand Name KingPo
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Packaging Details safety carton pack or plywood box
Power Supply AC220V±10%, 50/60Hz Driving Air Pressure 0.5MPa
Force Application Time 0~99.9 seconds can be set [standard 4 seconds] Brand Name KingPo
Place of Origin China
High Light AC220V±10% Power Supply Toilet Seat Extrusion Tester0.5MPa Driving Air Pressure Smart Toilet Test EquipmentIEC 60335-2-84 Compliance Toilet Seat Durability Tester

1. Overview :

(1) This equipment is used for the A station (impact test) and B station (swing test) of smart toilets.

(2) This equipment is composed of formed aluminum bracket, pneumatic mechanism, pressure plate, etc. The electrical control part is composed of PLC , human-machine interface, pressure sensor, etc., and the test data is accurate.

(3) This equipment has two working stations, each of which can be tested independently.

 

 

Figure 1 Overall appearance of the equipment

2. Manufacturing Standards

 

This test equipment is designed and manufactured according to the following standards:

Designed and manufactured in accordance with 21.103.1 and 21.103.2 of IEC 60335-2-84 ;

6.7 Swing test, 6.10 Opening and closing test, 6.11 Slow-fall function life test, and 6.12 High pressure test of JC/764-2008 ;

3. Technical Parameters:

Power Supply

AC220V±10%, 50/60Hz

Machine Power

1.5KW

Static pressure and impact test station:

Force Application Method

Cylinder force, adjustable air pressure

Driving Air Pressure

0.5MPa

Force Application Time

0~99.9 seconds can be set [standard 4 seconds]

Pressure Plate

Diameter 300mm, thickness 5mm, Shore A hardness 70 °

Force Value

0~1300N adjustable [Standard static pressure 1500N, impact 1250N]

Force Sensor

0.5 level 200KgF

Impact Count

0~999999999 times can be set

Swing test station:

Force Application Method

Cylinder force, adjustable air pressure

Cylinder

Diameter 50mm, stroke 125mm, one set on each side

Pressure Plate

Diameter 76mm, thickness 19mm, Shore A hardness 70 °

Driving Air Pressure

0.5MPa

Force Application Time

0~99.9 seconds can be set [standard 1.0 second]

Force Value

0~1300N adjustable [890N]

Force Sensor

0.5 level 200KgF one on each side

Swing Count

0~999999999 times can be set

 

4. Usage Environment

(1) The machine and equipment should be placed in an environment that is protected from rain, sun and corrosion.

(2) Ambient temperature 10~ 40 , relative humidity <80%.

(3) The machine should be placed on a level ground free of vibration and kept     stable without shaking.

5. Human-computer Interaction Interface Operation Instructions

(1) Install the device and turn on the power;

(2) User login interface, change user password (the original password for all users is: 1111):

 

 

Figure 2: Boot welcome screen


 

 

Figure 3: Login and password pop-up window

 

 

Figure 4: Change password pop-up window

(3) Operation Interface:

 

 

Figure 5: Operation page for opening and closing test at station A1, static pressure test at        station B1, and swing test at station C

[Logout]: Log out the current user and return to the login interface;

[Clear Alarm]: Please eliminate the alarm first, then press this button to clear the alarm;

 

A Impact Test Station

[Count Reset]: Please reset the count value to zero;

[Force Value Zero]: Set the current force value deviation to zero;

[Start Test]: Start test button;

[Stop Test]: Stop test button;

 

[Current Number]: Display the current number;

[Set Times]: Set the number of times, and the machine will stop when the current number is reached;

[Force Application Time]: display and setting of force application time;

[Current Force Value]: Display the current force value;

[Set Force Value]: set the force value;

 

B Swing Test Station

[Count Reset]: Please reset the count value to zero;

[Force Value Zero]: Set the current force value deviation to zero;

[Start Test]: Start test button;

[Stop Test]: Stop test button;

 

[Current Number]: Display the current number;

[Set Times]: Set the number of times, and the machine will stop when the current number is reached;

[Left Cylinder Force Value]: Set the left cylinder force value and display;

[Left Force Application Time]: Set the left cylinder force application time and display;

[Right Cylinder Force Value]: Set the right cylinder force value and display;

[Right Force Application Time]: Set the right cylinder force application time and display;

 

(4) Parameter and debugging pop-up window (press the button in the upper left corner of each station to pop up the parameter and debugging window ):

 

Figure 6: Station B parameters and debugging pop-up window

[Cylinder Lift]: Manual cylinder lift button;

[Cylinder Down]: Manual cylinder down button;

[Stop]: Stop manual button;

[Shock Compensation Time]: Compensation time when each cycle is not reached during the shock test process;

[Shock test cycle]: Displays the shock test cycle time;

[Force upper deviation] and [Force lower deviation] set the force upper deviation alarm force value and the working parameters of the lower deviation;

[Current force value]: Display the current force value;

 

Figure 7: Station C parameters and debugging pop-up window

[Cylinder Lift]: Manual cylinder lift button;

[Cylinder Down]: Manual cylinder down button;

[Stop]: Stop manual button;

 

[Force Upper Deviation] and [Force Lower Deviation] set the force upper deviation alarm force value and the working parameters of the lower deviation;

[Interval Compensation Time]: The standard requirement is a cylinder interval pressing time of about 0.5 seconds. If it is not reached, set this time compensation;

[Current Force Value]: Display the current force value;

 

(5) History interface (long press the information display box at the bottom of the operation interface to enter this interface, where you can set the system time):

 

 

Figure 8: Workstation history page

[Return]: Return to the main operation page;

[Interface time display settings]: The system time can be set in the upper right corner of this page;


6. Operation process

(1) Adjust the level of equipment installation and positioning of machine feet;

(2) Install the sample at each station, fix the sample with the provided butterfly screws, and adjust the sample level;

 


(3) Connect the power supply and turn on the power. Note that the equipment should be properly grounded to prevent electric shock accidents;

(4) Impact test:

1) Fix the force-applying circular steel plate on the force sensor; for static pressure testing, use a ø160mm circular steel plate; for impact testing, use a ø300mm circular      steel plate;

2) Adjust the position of the sample and the force-applying steel plate by pressing the manual button in the parameter and debugging pop-up window and adjusting the air  pressure according to the output force value. After the adjustment is completed, return the cylinder to its original position.

3) Enter the operation interface and press [Force Value Zero] to reset the current force value;

4) Set the B station function to the function to be tested, clear the last count, and set the force value, number of times, and force application time;

5) Press the [Start Test] button in the main operation interface, and the device will automatically perform opening and closing tests and automatically count the times;

6) The test will automatically stop when completed and will be displayed in the prompt  box; if you need to stop during the test, press the [Stop Test] button; if you need to   stop urgently, press the emergency stop button;

7) Remove the test completed samples and inspect the samples.

(5) Swing Test:

1) Adjust the position of the sample and the force-applying steel plate by pressing the manual button in the parameter and debugging pop-up window and adjusting the air  pressure according to the output force value. After the adjustment is completed, return the cylinder to its original position.

2) Enter the operation interface and press [Force Value Zero] to reset the current force value;

3) Clear the last count on the main operation interface and set the force value, number of times or application time;

4) Press the [Start Test] button in the main operation interface, and the device will automatically perform opening and closing tests and automatically count the times;

5) The test will automatically stop when completed and the message will be displayed in the prompt box. If you need to stop during the test, press the [Stop Test] button. If    you need to stop immediately, press the emergency stop button.

6) Remove the test completed samples and inspect the samples.

 

7. Precautions and Maintenance

(1) Ensure that the machine is well grounded to avoid safety accidents.

(2) Do not exceed the allowable load during testing to avoid damaging the pressure sensor.

(3) The machine part should be wiped frequently to keep it clean.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company,Exporter,Seller

  • Year Established:

    2000

  • Total Annual:

    8000000-1500000

  • Employee Number:

    50~200

  • Ecer Certification:

    Verified Supplier

.gtr-container { font-family: 'Arial', sans-serif; color: #333; line-height: 1.6; max-width: 1000px; margin: 0 auto; padding: 20px; } .gtr-heading { font-size: 18px !important; font-weight: 600; color: #2a5885; margin: 25px 0 15px 0; padding-bottom: 8px; border-bottom: 2px ... .gtr-container { font-family: 'Arial', sans-serif; color: #333; line-height: 1.6; max-width: 1000px; margin: 0 auto; padding: 20px; } .gtr-heading { font-size: 18px !important; font-weight: 600; color: #2a5885; margin: 25px 0 15px 0; padding-bottom: 8px; border-bottom: 2px ...

+ Read More

Get in touch with us

  • Reach Us
  • KingPo Technology Development Limited
  • RM C, 13/F, HARVARD COMMERCIAL BUILDING, 105-111 THOMSON ROAD, WAN CHAI, HK
  • https://www.batterytestingmachine.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement