China factories

China factory - TAI ZHOU KAKA VALVE FACTORY

TAI ZHOU KAKA VALVE FACTORY

  • China,Putian ,Zhejiang
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China 4 Way Valve Manifold For Pressure Transmitter Water Distribution Plumbing
China 4 Way Valve Manifold For Pressure Transmitter Water Distribution Plumbing

  1. China 4 Way Valve Manifold For Pressure Transmitter Water Distribution Plumbing

4 Way Valve Manifold For Pressure Transmitter Water Distribution Plumbing

  1. MOQ: 3000
  2. Price:
  3. Get Latest Price
Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability 50000pcs
Delivery Time 30-45days
Packaging Details Color Packing
Item: Brass Manifold
Size: 1"(2-12 Way)
Material: HPB 57-3,CW617N, H58-3
Working Pressure: 12 bar, 16 bar
Thread: BSP, NPT
Working Temperature: -10˚C-100˚C
Warranty: 2 years
Seat sealing Material: PTFE
Brand Name KAKA
Model Number M-01
Certification ISO9001,CE
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability 50000pcs
Delivery Time 30-45days Packaging Details Color Packing
Item: Brass Manifold Size: 1"(2-12 Way)
Material: HPB 57-3,CW617N, H58-3 Working Pressure: 12 bar, 16 bar
Thread: BSP, NPT Working Temperature: -10˚C-100˚C
Warranty: 2 years Seat sealing Material: PTFE
Brand Name KAKA Model Number M-01
Certification ISO9001,CE Place of Origin China
High Light 4 valve manifold4 way valve manifoldvalve manifold for pressure transmitter

Water Distribution Plumbing Manifolds

Details of Water Distribution Plumbing Manifolds

MF001

Central heating manifold

Temperature;5-95(℃)

12 and 16(mm) PEX fitting;Max working pressure;1 Mpa(10Bar)

Working pressure;0.7Mpa

DN20x16-2way
 
DN20X16-3 way
 
DN20x16-4 way
 
DN20x16-5 way
 
DN25x16-2 way
 
DN25x16-3 way
 
DN25x16-4 way
 
DN25x16-5 way

3/4″ and 1″ by the two options

Diverter installation is completed for testing,

1. Open the water inlet and return valves, the main water into the manifold, remove the flowmeter red sheath spin up the flow adjustment (collector spool open).
2. Automatic exhaust loose small cap, let the exhaust be in the automatic state, discharge the air inside the manifold.
3. Test the system in the fully open state to see if there are any safety leaks, and test the system for 24 hours (the pressure is stabilized at 1.0~1.2MPa),
4. pressure test 24 hours, check whether there is water seepage or dripping phenomenon in each component connection point. If an urgent shutdown is found into the return valve, repair the pipeline, and re-test.
5. System test indicators can fully meet the user’s requirements, and the pressure system pressure is back to normal use pressure, according to the user’s requirements for the use of fixed.
Note: The highest pressure value of the system can not exceed 1.2MPa.

Brass heating manifold

Manifold

3/4″,1″

Max Manifold pressure

PN10

Manifold Materials

Normal brass, HPB58-3

Manifold Standards

BS2779,EN331,ISO228,DIN 259

Working Temperature:

From 5 ℃ To +98 ℃

Seat sealing Material:

PTFE

Accessories

Manifold clamp, air vent valve, Pex fitting, Adapter

Thread connection:

NPT, BSP

Quality/valve Certifications

CE,ISO9001

Finish;

Nickel-plated, Chrome plated

Cartridge

Brass cartridge

Manifold operator

Handwheel, Worm Gear

Nickname

Pex Manifold

O ring

NBR

Working temp.

0.7Mpa

Central PEX (cross-linked polyethylene) heating manifold is a plumbing system that distributes heated water or other fluids throughout a building. The manifold connects to a boiler or other heat source and distributes the heated fluid through a network of PEX pipes that run through walls, floors, and ceilings to provide heat to different rooms or zones. Here’s more information about central PEX heating manifold applications, raw materials, installation, sizes, and tips:

What is a water Distribution plumbing manifolds

A manifold is a device or system that is designed to distribute, control, or regulate the flow of fluids, gases, or electrical signals to multiple outlets or components. It serves as a central hub or junction point where the flow is divided or combined, allowing for efficient and organized distribution.

The term "manifold" can refer to different types of devices or systems depending on the specific application. Here are a few common types:

Fluid Manifold: In fluid systems, a manifold is a structure that distributes fluid flow from a single source to multiple outlets or channels. It can be used in various industries, such as plumbing, hydraulic systems, fuel systems, and process control. Fluid manifolds can be made of materials like metal, plastic, or composite materials, and they often include valves, fittings, and connections for controlling and directing the flow.

HVAC Manifold: In heating, ventilation, and air conditioning (HVAC) systems, a manifold is used to distribute and balance the flow of air or refrigerant to different zones or components. It helps ensure proper airflow and temperature control throughout a building or system.

Electrical Manifold: In electrical systems, a manifold is a device that allows for the distribution and organization of electrical signals or power to multiple components or circuits. It can include connectors, terminals, or printed circuit boards (PCBs) to facilitate the flow of electrical currents.

Exhaust Manifold: In automotive engines, an exhaust manifold collects and directs the exhaust gases from each cylinder into a single exhaust pipe. It serves as a central junction point for the exhaust gases and helps optimize engine performance.

A heating manifold, also known as a heating distribution manifold or heating circuit manifold, is a device used in hydronic heating systems to control and distribute hot water or heat-carrying fluid to different zones or circuits within a building. It serves as a central hub for the supply and return lines of the heating system, allowing for individual control and regulation of temperature in each heating zone.

 

Applications of water Distribution plumbing manifolds 

  • Residential and commercial heating systems
  • Radiant floor heating systems
  • Baseboard heating systems
  • Hydronic heating systems

Raw materials:

  • PEX pipes
  • Brass or stainless steel manifold
  • Pipe fittings and adapters
  • Insulation
  • Mounting brackets

How to install the minifold

  1. Determine the number of heating zones or rooms and calculate the required length of PEX pipe for each zone.
  2. Install the manifold in a central location, usually near the heat source, and connect it to the supply and return lines.
  3. Install the PEX pipes in each zone and connect them to the manifold using fittings and adapters.
  4. Insulate the PEX pipes to minimize heat loss and improve efficiency.
  5. Mount the manifold to the wall or floor using brackets.
  6. Fill the system with water and purge the air from the pipes.

Sizes: Central PEX heating manifold systems are available in various sizes, depending on the number of zones or rooms they are designed to heat. Manifolds can have as few as two ports and as many as 24 or more. The PEX pipes’ size will also depend on the heating load and the length of the pipes.

Tips:

  • Make sure to properly size the manifold and PEX pipes for the heating load and the length of the pipes.
  • Use high-quality PEX pipes and fittings to ensure a long-lasting and leak-free installation.
  • Insulate the PEX pipes to minimize heat loss and improve energy efficiency.
  • Purge the air from the pipes to prevent noisy operation and air pockets that can cause damage to the system.
  • Consider installing a mixing valve to control the temperature of the heated fluid and improve comfort and efficiency.
  • Choose a suitable location for the manifold that is easily accessible and centrally located. This will make it easier to install and maintain the system.
  • Use a pressure gauge and pressure relief valve to monitor the pressure in the system and prevent over-pressurization.
  • Use a flow meter or balancing valves to ensure the even distribution of heated fluid to all zones or rooms.
  • Consider using a smart thermostat or zone control system to optimize the system’s heating performance and energy efficiency.
  • Regularly inspect and maintain the system to ensure proper operation and prevent leaks or other problems.
  • If you are not experienced with plumbing or heating installations, consider hiring a professional to install the system to ensure a safe and reliable installation.

A central PEX heating manifold system is an effective and efficient way to distribute heat throughout a building. By selecting high-quality materials, properly sizing and installing the system, and following best practices, you can enjoy comfortable and reliable heating for years to come.

 

A brass heating manifold is a type of central heating manifold constructed from brass material. It serves as a central distribution point for hot water in a hydronic heating system and is used to connect the hot water supply and return pipes to individual heating zones or circuits. Brass heating manifolds have become popular in recent years due to their durability, corrosion resistance, and ease of installation. Here are some additional details about brass heating manifolds:

Materials: Brass heating manifolds are typically made of high-quality brass material. This is because brass is known for its excellent corrosion resistance, durability, and long-term reliability. The brass material used in the manifold is typically lead-free to prevent any potential contamination of the heating water.

Applications: Brass heating manifolds are used in a variety of applications, including:

  • Radiant heating systems
  • Underfloor heating systems
  • Baseboard heating systems
  • Hydronic heating systems

Installation: Brass heating manifolds are relatively easy to install, especially when compared to other types of heating manifolds. They typically come pre-assembled and can be installed using basic plumbing tools. The following are the basic steps for installing a brass heating manifold:

  1. Determine the number of zones or circuits required for the heating system.
  2. Choose a suitable location for the manifold that is accessible and central to the heating system.
  3. Install the manifold onto a suitable support bracket.
  4. Connect the hot water supply and return pipes to the manifold.
  5. Connect the individual zone/circuit lines to the manifold using the appropriate fittings and adapters.
  6. Fill the system with water and purge any air pockets from the piping.

Sizes: Brass heating manifolds are available in various sizes, ranging from 2 ports to 12 ports or more. The manifold size will depend on the number of zones/circuits in the heating system.

In conclusion, brass heating manifolds are a durable, reliable, and efficient way to distribute hot water throughout a hydronic heating system. Selecting a high-quality brass manifold and following proper installation procedures ensures that your heating system operates smoothly and efficiently for years to come.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Trading Company

  • Year Established:

    2015

  • Total Annual:

    3000000-5000000

  • Employee Number:

    10~30

  • Ecer Certification:

    Verified Supplier

Home > Enterprise Information > About Us About Us TAI ZHOU KAKA VALVE FACTORY  is situated in Chumen,Yuhuan country along the east China Sea.It is close to NingBO .It is 45km away from Huangyan Airport,25km from Ningbo-Taizhou-Wenzhou Expressway and 10km from Damaiyu Port.It ... Home > Enterprise Information > About Us About Us TAI ZHOU KAKA VALVE FACTORY  is situated in Chumen,Yuhuan country along the east China Sea.It is close to NingBO .It is 45km away from Huangyan Airport,25km from Ningbo-Taizhou-Wenzhou Expressway and 10km from Damaiyu Port.It ...

+ Read More

Get in touch with us

  • Reach Us
  • TAI ZHOU KAKA VALVE FACTORY
  • Putian Industrial Zone, Chumen Town,Yuhuan,Zhejiang,China
  • MrTim
  • 13606868699
  • https://www.bibcockvalve.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement