China factories

China factory - Qingdao Jingcheng Weiye Environmental Protection Technology Co., Ltd

Qingdao Jingcheng Weiye Environmental Protection Technology Co., Ltd

  • China,Qingdao
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China OEM Q235 Q345 Pre Engineered Steel Building Warehouse Prefabricated
China OEM Q235 Q345 Pre Engineered Steel Building Warehouse Prefabricated

  1. China OEM Q235 Q345 Pre Engineered Steel Building Warehouse Prefabricated
  2. China OEM Q235 Q345 Pre Engineered Steel Building Warehouse Prefabricated
  3. China OEM Q235 Q345 Pre Engineered Steel Building Warehouse Prefabricated
  4. China OEM Q235 Q345 Pre Engineered Steel Building Warehouse Prefabricated
  5. China OEM Q235 Q345 Pre Engineered Steel Building Warehouse Prefabricated
  6. China OEM Q235 Q345 Pre Engineered Steel Building Warehouse Prefabricated

OEM Q235 Q345 Pre Engineered Steel Building Warehouse Prefabricated

  1. MOQ: 500sqm
  2. Price: USD 50-100/SQM
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union
Supply Ability 100000 tons/year
Delivery Time 30-60 workdays
Packaging Details OT container nude, HC container with steel pallet
Wind speed As clients' request
Material Q355B, Q235B
Surface treatment Painting/Galvanizing
Size customized
Usage warehouse/workshop/hangar
Insulation rockwool/fiberglass/PU/EPS
Brand Name Senwang/OEM
Model Number SW-085-2
Certification ISO14001(2015)
Place of Origin China(Mainland) Shandong Province

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union Supply Ability 100000 tons/year
Delivery Time 30-60 workdays Packaging Details OT container nude, HC container with steel pallet
Wind speed As clients' request Material Q355B, Q235B
Surface treatment Painting/Galvanizing Size customized
Usage warehouse/workshop/hangar Insulation rockwool/fiberglass/PU/EPS
Brand Name Senwang/OEM Model Number SW-085-2
Certification ISO14001(2015) Place of Origin China(Mainland) Shandong Province
High Light Q345 Pre Engineered Steel BuildingOEM Q235 Pre Engineered Steel BuildingQ345 Steel Building Warehouse

Durable Pre Engineered Steel Buildings Prefabricated Steel Frame Steel Structure

 

Steel Structure Project Show

 

 

 

Steel Structure Description:

 

Steel structure building are fabricated with steel, beside the steel beams and columns, roof and wall cladding are normally made of steel also.

Of course ceilings and interior walls could also be made of gypsum and other materials. Steel Structure building also normally used as warehouse, workshop, hangars, animal shed. Now the usage of steel structure is become more and more popular, such as hosipital, shopping mall, residental building. 

 

Steel Structure Connect:

Steel Structure Andvantages:

 

Compared with other building materials such as wood, steel has the following advantages:

1.Steel is structurally sound , it's fabricated to strict specifications and tolerances.
2.Very environmentally friendly because all the materials are 100% recyclable
3.Steel does not warpage, bend, twist or bend easily, making it easy to modify and providing design flexibility.

4.It is also easy to install, which will reduce the intallation cost.

5.Quality of steel building is better, it reduces maintenance while providing greater safety and resistance.

6.With the spread of mold and mildew in residential construction, the use of steel minimizes these intrusions. Mold needs moist, porous material to grow. Steel studs can avoid these problems.

7.Steel structure construction is easy to construct and easy to move.

Material Q235B/Q355B
Length With customer's requirement
Width Single span, double-span, Multi-span
Height With customer's requirement
Column Q235, Q345 welded H section steel
Beam Q235, Q345 welded H section steel
Purlin Q235 C channel or Z channel
Knee brace Q235 angle steel
Vertical and transversal support Q235 angle steel, round bar or steel pipe
Tie bar Q235 steel pipe
Brace Q235 round bar

 

Steel Structure Fabricate Process:

Steel Raw Material Third Party ( SGS) Testing Report:

Feedback Of Other Clients

 

Steel Structure Erection:

 

1. The anchor bolts should be placed upright to prevent deformation. Pay attention to the screw protection to prevent bumps.

2.After laying out the line, find the rules for the anchor bolts. Strictly follow the placed axis and elevation. Find the rules: It is to require all anchor bolts to be aligned, and after the steel column is placed, it is in a straight line

3.For anchor bolt welding, under the premise of ensuring the axis and elevation, the bolt connection should be firm, and the bottom of the screw rod and the bottom of the bolt should be cross welded to the main reinforcement. Shake the bolt to check after welding.

4.The first picture is unpoured concrete, and the second picture is after pouring concrete. Reinforcing bars can increase shear resistance. Generally high-rise buildings have this requirement, and foreign projects are generally not so complicated.

5.Use the nut to find the horizontal line

6.Installation of platform beam and crane beam support.

7.Pay attention to the elevation of anchor nuts and washers

8.Use a ruler to measure the verticality, the error is within one thousandth of L, and the maximum is no more than 25 mm. That is: the height of the steel column is 25 meters, and the error is 25 thousandths of meters, which is 2.5 cm. The height of the steel column is 50 meters, and the error cannot be greater than 2.5 cm

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company,Seller

  • Year Established:

    2016

  • Total Annual:

    2,000,000-8,000,000

  • Employee Number:

    20~100

  • Ecer Certification:

    Verified Supplier

Qingdao JCWY Environmental Protection Technology Co., LTD., is a scientific and technological enterprise mainly engaged in the development of new energy industry, environmental protection sewage, air pollution control, large-scale biogas project design, construction general contracting and integrate... Qingdao JCWY Environmental Protection Technology Co., LTD., is a scientific and technological enterprise mainly engaged in the development of new energy industry, environmental protection sewage, air pollution control, large-scale biogas project design, construction general contracting and integrate...

+ Read More

Get in touch with us

  • Reach Us
  • Qingdao Jingcheng Weiye Environmental Protection Technology Co., Ltd
  • Unit 1603, unit 1, building 4, No. 28, Wenchang Road, Licang district,Qingdao(This place is only for communication)
  • Msadmin
  • 18669803758
  • https://www.biogas-projects.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement