Payment Terms | L/C, T/T, Western Union |
Supply Ability | 500 Tons Per Month |
Delivery Time | 30 - 60 Days |
Packaging Details | Iron Frame Packing |
Condition | New |
Specification | Customized |
Origin | Zhangjiagang , China |
Material | Carbon Steel, Alloy Steel or Equivalent |
HS Code | 3215960855 |
Port | Shanghai |
Brand Name | HD BOILER |
Model Number | Finned tube |
Certification | ISO9001 , SGS , TUV , ASME , EN |
Place of Origin | China |
View Detail Information
Explore similar products
Cold Finish High Frequency Welding ASME Boiler Fin Tube
Customized Industrial Boiler Fin Tube , Economizer H Fin Tubes For Heat
Customized Carbon Steel Spiral Boiler Spare Parts Fin Tube For Industry
ISO Certification Boiler Tubular Longitudinal Fin Tube For Heat Exchange
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 500 Tons Per Month |
Delivery Time | 30 - 60 Days | Packaging Details | Iron Frame Packing |
Condition | New | Specification | Customized |
Origin | Zhangjiagang , China | Material | Carbon Steel, Alloy Steel or Equivalent |
HS Code | 3215960855 | Port | Shanghai |
Brand Name | HD BOILER | Model Number | Finned tube |
Certification | ISO9001 , SGS , TUV , ASME , EN | Place of Origin | China |
High Light | finned heat exchanger tubes ,spiral fin tube |
ASTM Carbon steel Nonferrous and nickel alloys High temperature resistance H type fin tube
Product Description
H-fin Tubes have two steel discs,with fluorescent tubes symmetrically welded together to form fins(fins of butterfly piece)creating a shape that looks somewhat like the letter"H",creating an efficient energy saving, extension heating surface.H-fin Tubes also have a high rate of fusion welds and weld tensile strength.H-fin Tube is assembled with the H economizer, which has high efficiency,little resistance,less wear and light weight.
Product | H-fin Tube |
Base Pipe | Welded or Seamless |
Material | carbon steel, alloy steel, stainless steel, non-ferrous alloys and nickel alloys. |
Application | H economizer,H evaporator,H superheater,H air heater and etc. |
Structure
Our products can be modified according to our customers' needs and the situation.we design and manufacture safe,reliable and efficient H-fin tubes.HD BOILER has also completed stand-alone product quality assurance systems.Production of H-fin tubes are with high heat transfer efficiency, they have flue gas resistance and are designed for a small space.
Cerficate
ASME 'S' & 'U' STAMP
Company Introduction
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.
1. Fabrication area of 200,000 square meters
2. 150 Engineers
3. 600 Coded welders
4. 60 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2008 Quality System
7. ASME Certificate of Power Boilers
8. ASME 'S','U' and NB stamp authorization
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!