China Carbon Steel Bare Tube Water Wall Panels as Heating Surface For Waste Heat
China Carbon Steel Bare Tube Water Wall Panels as Heating Surface For Waste Heat

  1. China Carbon Steel Bare Tube Water Wall Panels as Heating Surface For Waste Heat
  2. China Carbon Steel Bare Tube Water Wall Panels as Heating Surface For Waste Heat
  3. China Carbon Steel Bare Tube Water Wall Panels as Heating Surface For Waste Heat
  4. China Carbon Steel Bare Tube Water Wall Panels as Heating Surface For Waste Heat

Carbon Steel Bare Tube Water Wall Panels as Heating Surface For Waste Heat

  1. MOQ: 5 tons
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union
Supply Ability 800 Tons / Month
Packaging Details Iron Frame Package
Product Name Boiler Water Walls
Tube material SA 179
Fin bar SA36
Design & Fabrication ASME SECTION I,2017 EDITION
NDE REQUIREMENTS 100% RT/ 100%PT / 100%UT
Anti-corrosion Painting & Powder
Brand Name HD BOILER
Model Number Water wall panel
Certification ISO9001 , SGS , TUV , ASME , EN
Place of Origin Zhangjiagang,China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union Supply Ability 800 Tons / Month
Packaging Details Iron Frame Package Product Name Boiler Water Walls
Tube material SA 179 Fin bar SA36
Design & Fabrication ASME SECTION I,2017 EDITION NDE REQUIREMENTS 100% RT/ 100%PT / 100%UT
Anti-corrosion Painting & Powder Brand Name HD BOILER
Model Number Water wall panel Certification ISO9001 , SGS , TUV , ASME , EN
Place of Origin Zhangjiagang,China
High Light boiler water wall panelsboiler water wall tubes

Bare tube water wall panel export product positive tolerance premium quality with low cost

 

PRODUCT DESCRIPTION

 

1 Tube panels are fabricated using premium grade raw materials in carbon steel or alloy steel as per the customers' requirement.
2 Layers of tube panels involving multi radius bends, overlapping each other to be accommodated in lesser space for ultimate efficiency.
3 Compact size and leak proof assembly.
4 Widely used in water tube and waste heat recovery boilers, tube panels can be customized as per the specifications and drawings of customers.
5 Smelting units, power stations and sugar plants are the common buyers of this product.

 

SOLUTION TO CORROSION PROBLEMS IN LOWER FURNACE

 

1 An innovative, engineering solution for solving corrosion or erosion/corrosion problems experienced by the waterwall is to apply an overlay of a corrosionresistant alloy to carbon steel waterwalls on site using automatic welding machines.
2 The GMA W overlay machine, which is fully automatic, deposits weld beads in a vertical down mode starting typically from the membrane and then moving to the tube section following a preprograrnrned weld bead sequence to achieve a uniform coverage of the waterwall (i.e., membranes and tubes) in a boiler.
3 Each weld bead is overlapped by subsequent weld bead to insure a full coverage with no missing spots.
4 The thickness of the overlay applied to the watelwall in field is typically 1.78 mm (0.070") minimum. 
5 For overlay welding of the waterwall in the field, it is a common practice to use many welding machines, for example, 10 or more, at the same time in the boiler to complete the project during a maintenance shutdown. 
6 A modem machine can deliver a welding "speed" of approximately 0.14 to 0.19 m2 (1.5 to 2.0 fY) per hour. 
7 Thus, with 10 machines, a total area of about 16.7 to 22.3 m 2 (180 to 240 fY) of the waterwall can be overlaid over a 12-hour shift. A waterwall area of about 280 m 2 (about 3000 fY) can be routinely overlaid in seven days using a two 12-hour-shift-per-day schedule. 
8 When the waterwall is damaged beyond repair on site, the damaged section can be removed and replaced with shop-fabricated overlay panels. 
9 Panels of sizes up to 1.2 m (4 ft) wide and 12 m (40 ft) long can be readily handled in the shop. 
10 Construction of an overlay panel consists of fabricating a panel of steel tubes and membranes, which is then followed by overlay welding of the panel on a stand using essentially the same techniques as field overlay. 

 

Application

 

1 Energy saving enviromental protection china supplier membrane water wall for CFB boiler are membrane walls that are made of tubes welded together with or without a strip of metal in between.
2 These walls form the enclosure of the coal combustion chamber.
3 Water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler.

 

Encasement

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement