China factories

Chat Now Send Email
China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Heat Recovery Boiler Spare Parts Water Wall Tubes Stainless Steel / Alloy
China Heat Recovery Boiler Spare Parts Water Wall Tubes Stainless Steel / Alloy

  1. China Heat Recovery Boiler Spare Parts Water Wall Tubes Stainless Steel / Alloy
  2. China Heat Recovery Boiler Spare Parts Water Wall Tubes Stainless Steel / Alloy
  3. China Heat Recovery Boiler Spare Parts Water Wall Tubes Stainless Steel / Alloy
  4. China Heat Recovery Boiler Spare Parts Water Wall Tubes Stainless Steel / Alloy

Heat Recovery Boiler Spare Parts Water Wall Tubes Stainless Steel / Alloy

  1. MOQ: 1 Set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union
Supply Ability 500 Tons / Month
Delivery Time 50 Days
Packaging Details Seaworthy packing
Material Carbon Steel,Alloy,Stainless steel
Surface treatment Painted
HS Code 3215960855
Packaging Iron Frame Packing
Available Energy Saving
Color Red / Grey Other Color
Condition New
Specification Customized
Brand Name HD BOILER
Model Number Water wall panel
Certification ISO9001 , SGS , TUV , ASME , EN
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union Supply Ability 500 Tons / Month
Delivery Time 50 Days Packaging Details Seaworthy packing
Material Carbon Steel,Alloy,Stainless steel Surface treatment Painted
HS Code 3215960855 Packaging Iron Frame Packing
Available Energy Saving Color Red / Grey Other Color
Condition New Specification Customized
Brand Name HD BOILER Model Number Water wall panel
Certification ISO9001 , SGS , TUV , ASME , EN Place of Origin China
High Light boiler water wall panelsboiler water wall tubes

 

Heat Recovery Boiler Spare Parts Water Wall Tubes Stainless Steel / Alloy

 

Product Description


The water cooling wall is the main heating part of the boiler.It is the internal flow of water or steam, outside the heat from the boiler furnace.It mainly absorbs the radiation heat of the high-temperature combustion products in the furnace, in which the working medium moves upward and is heated to evaporate.

 

 

 

Specification


Name Membrane water panel
Material Carbon steel,Alloy,Stainless steel
Tube size Φ38 - 76 mm, Customize
Standard ISO , ASME
Model Studded
Application Istallable around the boiler combustion chamber

 

 

Functions


1. The water cooling wall is the high-temperature radiant heat absorbed by the fuel chamber flame, which makes the water entering the water cooling wall evaporate into saturated steam.

2. Protect the furnace wall. The water cooling wall is laid on all sides to separate the combustion chamber from the furnace wall and prevent the furnace wall from being burnt out.

3. Simplify the furnace wall structure for easy installation, and pay attention to the anti-friction and explosion-proof network of the boiler.

4. The water-cooled wall tube can absorb radiation heat well, and its evaporation intensity is 4 times that of the convection tube bundle. Appropriately increasing the water-cooled wall tube in the furnace will reduce the number of convection and heating surface.

 

The water-cooling screen is used to distinguish the early light-pipe water-cooling wall, the water-cooling wall of the early boiler is a pipe vertical around the furnace, and the water-cooling wall is surrounded by thick furnace wall. The water-cooling wall pipe of the current boiler has fins on both sides and two adjacent pipe fins are connected together to form a water-cooling screen, which is distributed around the furnace.

 

Certification

 

 

Advantages


1.ensure sealing of furnace wall and reduce air leakage in combustion chamber.

2.realize full water cooling of the combustion chamber, which is helpful to prevent coke formation in the case of intensified combustion.

3. small capacity of heat storage, fast heating of combustion chamber and rapid cooling, can shorten the cooling time of boiler start and stop.

4. it is appropriate to use pipe furnace wall, which greatly reduces the load of boiler frame and is convenient for suspension.

5. compared with the optical tube, the heat absorption capacity of the tube is improved.

6.the pre-combination degree of boiler components is improved, which is convenient and reduces the installation workload.

 

 

Quality Control


1. Fabrication area of 200,000 square meters

2. 150 Engineers

3. 600 Coded welders

4. 60 Licensed Inspectors(NDT Level-III instructors)

5. Class-A Licenses for Design and Manufacture Boiler

6. ISO 9001:2008 Quality System

7. ASME Certificate of Power Boilers

8. ASME 'S','U' and NB stamp authorization

 

 

Workshop


Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement