Payment Terms | L/C, T/T, Western Union |
Supply Ability | 1500 Tons / Month |
Delivery Time | 50 ~ 100 Days |
Packaging Details | Seaworthy packing |
Condition | New |
Type | Natural Circulation / Once Through |
Materaial | Carbon Steel/Stainless Steel |
Output | Hot Water / Steam |
Specification | Customized |
Surface Treatment | Painted |
Range of Applications | Industry / Power Station |
Weight | 10~1000 tons |
Brand Name | HD BOILER |
Model Number | Heated area |
Certification | ISO9001 , SGS , TUV , ASME , EN |
Place of Origin | China |
View Detail Information
Explore similar products
High Temperature Superheater Boiler Spare Parts For Pulverized Coal Boilers
Carbon/Stainless Steel Superheater In Boiler For Natural Circulation Coal -
Alloy Steel Superheater And Reheater For Pulverized Coal Boilers With Natural
Stainless Steel Superheater And Reheater For Utility / Power Station , High
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 1500 Tons / Month |
Delivery Time | 50 ~ 100 Days | Packaging Details | Seaworthy packing |
Condition | New | Type | Natural Circulation / Once Through |
Materaial | Carbon Steel/Stainless Steel | Output | Hot Water / Steam |
Specification | Customized | Surface Treatment | Painted |
Range of Applications | Industry / Power Station | Weight | 10~1000 tons |
Brand Name | HD BOILER | Model Number | Heated area |
Certification | ISO9001 , SGS , TUV , ASME , EN | Place of Origin | China |
High Light | superheater in boiler , reheater in power plant |
Superheater Boiler Part Heat Transfer , Anti Corrosion Reheater In Boiler For Power Plant
Description
Heaters and superheater are a set of tubes located in a boiler.Water vapor enters the superheater from the water wall and heats to above saturation temperature until it reaches the required maximum operating temperature.Superheated steam flows to the high-pressure turbine through the main steam pipe.The steam discharged from the high-pressure turbine is directed to the boiler for reheating and from the boiler to the medium-low pressure turbine.High temperature heating can improve the output and efficiency of power plants.
Function
A reheater is basically a superheater that superheats steam exiting the high-pressure stage of a turbine. The reheated steam is then sent to the low-pressure stage of the turbine. By reheating steam between high-pressure and low-pressure turbine it is possible to increase the electrical efficiency of the power plant cycle beyond 40%.The reheat cycle is used in large power boilers since it is feasible economically only in larger power plants.
Application
Surper is a heat exchange part of boiler which widely used in energy industrail.
Manufacturing and acceptance criteria
JB/T1611 " Technical specification for manufacturing of boiler pipes."
JB/T1612 "boiler pressure test technical conditions. "
JB/T1613 "Technical specification for welding of pressure parts of boiler."
JB/T1615"Technical specification for painting and packing of boiler."
JB/T3375 "Rules for receiving acceptance of materials for boiler construction."
Workshop
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!