Payment Terms | L/C, T/T, Western Union, D/P, MoneyGram |
Supply Ability | 500 Tons/Month |
Delivery Time | Within 50 Days after getting the down payment or L/C |
Packaging Details | seaworthy packing for exporting with iron frame |
Condition | New |
Structure | Fire/Water Tube |
Fuel | Coal/Gas/Coal-fired/Water heat |
Type | Energy Saving |
Pressure | Low/High Pressure |
Range of Applications | Industrial/Power Station |
Specification | Customized |
Surface Treatment | Painted |
Brand Name | HD Boiler |
Model Number | HDB041007 |
Certification | ISO9001,ASME,Grade A,SGS,EN |
Place of Origin | China |
View Detail Information
Explore similar products
Alloy Customized Heat Recovery Steam Generator For Power Plant With ASME
EN3834 SA210 A1 Membrane Boiler Water Wall Panels For Power Station long life
TUV Certificated Carbon Steel Boiler Membrane Wall Tubes High Efficiency
SA -210 High Performance Water Wall Panels Efficient Heat Exchange Boiler Part
Product Specification
Payment Terms | L/C, T/T, Western Union, D/P, MoneyGram | Supply Ability | 500 Tons/Month |
Delivery Time | Within 50 Days after getting the down payment or L/C | Packaging Details | seaworthy packing for exporting with iron frame |
Condition | New | Structure | Fire/Water Tube |
Fuel | Coal/Gas/Coal-fired/Water heat | Type | Energy Saving |
Pressure | Low/High Pressure | Range of Applications | Industrial/Power Station |
Specification | Customized | Surface Treatment | Painted |
Brand Name | HD Boiler | Model Number | HDB041007 |
Certification | ISO9001,ASME,Grade A,SGS,EN | Place of Origin | China |
High Light | boiler water wall panels ,boiler water wall tubes |
Alloy Steel Industrial Boiler Water Wall Panels For Recycling Water , SA213 P11
Product Description: Boiler Membrane Water Wall Panel
Water Wall Panels are used in modern day Boilers to reduce heat loss due to their gas tight nature and reduce insulation costs. We fabricate Water Wall Panels using automatic Fin to tubes welding machines and large Tube Panel Benders to achieve desired shape of panels which can have Stub Welded to Headers. We supply Panels with integrated manhole openings in the panels.
Boiler water walls are membrane walls that are made of tubes welded together with or without a strip of metal in between. These walls form the enclosure of the coal combustion chamber. Water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler.
Parameter
Name | Membrane water panel |
Material | Carbon steel,Alloy,Stainless steel |
Tube size | Φ38 - 76 mm, or as required |
Standard | ISO , ASME |
Model | Studded |
Application | Istallable around the boiler combustion chamber |
Application
1 | Energy saving enviromental protection china supplier membrane water wall for CFB boiler are membrane walls that are made of tubes welded together with or without a strip of metal in between. |
2 | These walls form the enclosure of the coal combustion chamber. |
3 | Water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler. |
Note
1 | Control of weld penetration to satisfy mechanical and heat transfer requirements Control of the deformation to acceptable tolerances. |
2 | Panels routinely require straightening in the workshop after welding and heat treatment, the question to be answered is can the shop then meet the required dimensional tolerances for successful site installation? |
3 | Can existing shop handling procedures be used as-is without adding excessive controls that will add cost and schedule. |
4 | The importance of preheating and its maintenance through the welding process could cause a number of handling and shop processing issues that will substantially increase cost. |
Features
1. Strength calculation report with applied materials information;
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler;
4. Hydraulic test report: ensure the standard working pressure and safet
Advantages
1.ensure the sealing of furnace wall and reduce air leakage in combustion chamber.
2.realize full water cooling in the combustion chamber, which is conducive to preventing coking under the condition of intensified combustion.
3.low heat storage capacity, fast heating and cooling of the combustion chamber, which can shorten the cooling time of the boiler starting and stopping.
4.it is suitable to use tube-laying furnace wall, which greatly reduces the load of boiler frame and facilitates suspension.
5.compared with the light pipe, the heat absorption capacity of the pipe is improved.
6.improve the pre-assembly degree of boiler components, facilitate and reduce the installation workload.
workshop
Certifications
HD Boiler offers a best in class facility,including
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!