Payment Terms | L/C, T/T, Western Union |
Supply Ability | 500 Tons / Month |
Delivery Time | 50 Days |
Packaging Details | Iron Frame Package |
Material | Carbon steel |
Structure | Fire / Water Tube |
Surface Treatment | Painted |
Range of Applications | Industrial / Power Station |
Specification | Customized |
Port | Shanghai |
Brand Name | HD BOILER |
Model Number | Furnace wall |
Certification | ISO9001 , SGS , TUV , ASME , EN |
Place of Origin | Zhangjiagang,China |
View Detail Information
Explore similar products
Boiler Membrane Water Wall Carbon Steel High Pressure Wear Resistance
Steam Boiler Water Wall Tubes Made of Carbon Steel in ASME/GB Standard
ASME Standard Boiler Membrane Water Wall Panels for Power Station Boiler
Carbon Steel Alloy Steel Water Wall Panels / Water Cooling Wall ASME Standard
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 500 Tons / Month |
Delivery Time | 50 Days | Packaging Details | Iron Frame Package |
Material | Carbon steel | Structure | Fire / Water Tube |
Surface Treatment | Painted | Range of Applications | Industrial / Power Station |
Specification | Customized | Port | Shanghai |
Brand Name | HD BOILER | Model Number | Furnace wall |
Certification | ISO9001 , SGS , TUV , ASME , EN | Place of Origin | Zhangjiagang,China |
High Light | boiler industry water wall panels ,carbon steel water wall construction ,power station water wall panels |
Anti Corrosion Water Wall Panel Membrane With Fin Bar Boiler Industry
Advantages
1 | To guarantee the leakproofness of furnace wall and reduce the air leak of combustion chamber. |
2 | To achieve the full water cooling of combustion chamber, and the boiler accessories membrane water wall is benefit to prevent coking under the condition of supplemental firing. |
3 | The thermal storage capacity is small, the warming of combustion chamber is fast and the cooling is also fast, which could shorten the cooling time of boiler’s start and furnace shut down. |
4 | It is good to adopt top supported water cooled wall and it could reduce the load of boiler framework, which is benefit to overhang. |
5 | Compared with the bare tubes, the membrane water wall improves the heat absorption capacity of tubes. |
6 | The factory direct boiler membrane water wall could improve the Preliminary combination degree of boiler parts and reduce the installation workload. |
Description
1.Membrane walls were originally introduced for land power stations and are being increasingly used in marine boilers.
2.Originally, experience gained when making the lower parts of furnaces sufficiently tight to hold liquid ash, proved that this could be done by welding in steel strips between the floor tubes.
3.In both methods the longitudinal welds are done by an automatic process and panels of the required size are built up ready for welding directly to headers, or, in some cases to stubs on drums.
Application
1. Boiler water walls are membrane walls that are made of tubes welded together with or without a strip of metal in between.
2.These walls form the enclosure of the coal combustion chamber. Water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler.
Features
1. Sturdy construction
2. High strength
3. Accurate dimensions
4. Corrosion resistant finish
Raw material & Assembling
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!