abrasion and short service time.
Payment Terms | L/C, T/T, Western Union, MoneyGram |
Supply Ability | 500 Tons per month |
Delivery Time | 30 Days |
Packaging Details | Seaworthy Packing |
Fuel | Coal |
Application | Boiler System |
Specification | customization |
Range of Applications | Power station, Industrial |
Warranty | 1 Year |
HS Code | 3215960855 |
Brand Name | HD BOILER |
Model Number | Bare type Economizer |
Certification | ISO9001 , SGS , TUV , ASME , EN |
Place of Origin | China |
View Detail Information
Explore similar products
SA210A1 Steel Boiler Economizer Heat Exchange Part ISO9001 Certification
Carbon Steel Seamless Tube Economizer For Boiler Heat Exchanger ASME Waste Heat
Biomass Boiler Economizer With Carbon Steel Seamless Tube H Fin High Frequency
Boiler Heat Exchanger , Boiler Spiral Fin Tube Economizer ,Economizer Module in
Product Specification
Payment Terms | L/C, T/T, Western Union, MoneyGram | Supply Ability | 500 Tons per month |
Delivery Time | 30 Days | Packaging Details | Seaworthy Packing |
Fuel | Coal | Application | Boiler System |
Specification | customization | Range of Applications | Power station, Industrial |
Warranty | 1 Year | HS Code | 3215960855 |
Brand Name | HD BOILER | Model Number | Bare type Economizer |
Certification | ISO9001 , SGS , TUV , ASME , EN | Place of Origin | China |
High Light | seamless bare tube economizer ,SA210C bare tube economizer ,SA210C carbon steel economizer |
Professional Stainless Steel Boiler Economizer For Heat Recovery H Fin Tube Economizer
Introduction of Boiler Economizer
abrasion and short service time.
Procedure of Boiler Economizer
Economisers also reduce the potential of thermal shock and strong water temperature fluctuations as the feed water enters the drum or waterwalls. Increasingly stringent environmental regulations limiting nitrogen oxides and sulfur dioxide emission can also affect economizer design. The gas-side heat transfer coefficient is much less than water side heat transfer coefficient. To compensate this, outer surface of the tubes may be finned to increase the surface area of heat transfer.The ultimate goal of economizer design is to achieve the necessary heat transfer at minimum cost. A key design criterion for economizer is maximum allowable flue gas velocity. Higher velocity provide better heat transfer and reduce capital cost.
Quality Control
1. Impact test and Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and electrode.
3. X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler.
4. Hydraulic test report: ensure the standard working pressure and safety.
Company Introduction
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.
1. Fabrication area of 400,000 square meters
2. 150 Engineers
3. 600 Coded welders
4. 60 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2008 Quality System
7. ASME Certificate of Power Boilers
8. ASME 'S','U' and NB stamp authorization
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!