China factories

Chat Now Send Email
China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China 20G Tube Q235B Fin GB Standard Coal Fired Boiler Membrane Wall
China 20G Tube Q235B Fin GB Standard Coal Fired Boiler Membrane Wall

  1. China 20G Tube Q235B Fin GB Standard Coal Fired Boiler Membrane Wall
  2. China 20G Tube Q235B Fin GB Standard Coal Fired Boiler Membrane Wall
  3. China 20G Tube Q235B Fin GB Standard Coal Fired Boiler Membrane Wall
  4. China 20G Tube Q235B Fin GB Standard Coal Fired Boiler Membrane Wall

20G Tube Q235B Fin GB Standard Coal Fired Boiler Membrane Wall

  1. MOQ: 5 tons
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union
Supply Ability 800 Tons / Month
Delivery Time 60 Days
Packaging Details Steel Frame Package
Product Name Boiler Water Wall Panel
Standard GB/EN/ASME
Application Power Plant Boiler and Industrial Boiler
Keyword Membrane Wall
Packing Steel Frame
Welding Technique Submerged Arc Welding
Brand Name HD BOILER
Model Number Water Wall Panel
Certification ISO9001 , , TUV , ASME , EN
Place of Origin Zhangjiagang,China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union Supply Ability 800 Tons / Month
Delivery Time 60 Days Packaging Details Steel Frame Package
Product Name Boiler Water Wall Panel Standard GB/EN/ASME
Application Power Plant Boiler and Industrial Boiler Keyword Membrane Wall
Packing Steel Frame Welding Technique Submerged Arc Welding
Brand Name HD BOILER Model Number Water Wall Panel
Certification ISO9001 , , TUV , ASME , EN Place of Origin Zhangjiagang,China
High Light coal fired Boiler Membrane Wall20G Tube Boiler Membrane WallQ235B Boiler Water Wall Panel

 

Membrane Boiler Water Wall Made of 20G Tube and Q235B Fin in GB Standard for Coal-fired Power Plant Boilers
 

 

Introduction

 

Water wall panels are the main heating surface of boilers, composed of numbers of rows of steel tubes, arranged around the boiler corner. Inside is the flowing water or steam, and the outside accepts the heat of the flame in the furnace of the boiler, mainly absorbing the radiation heat of the high temperature combustion products in the furnace. The working fluid rises in it and evaporates by heat.
 

Membrane water wall is an air-tight structure consisting of pipes and fins.The advantages are less air leakage in furnace; can use pipe-laying wall, less load on steel structure and lower cost of boiler; easy to use suspension structure and improve thermal expansion system, suitable for large-scale mechanized production, high assembly rate, low heat storage capacity and shorten star-up and shutdown time. The disadvantage is that the manufacturing process is complex. Membrane water wall is often used in large capacity, high temperature and high pressure boilers.

 

Materials for water wall panels
20# Steel, SA192, SA 106B, 15CrMoVG, 12Cr1MoV

Standards
ASME Code standard, GB Standard

Quality inspection
MT, RT, Hydraulic test

 

Specification

 

The main function of water wall panels in boiler is to absorb the heat generated by high temperature flame or flue and to generate steam or hot water in tubes, hence to reduce the temperature in the chamber .

Name Water wall panels
Material ASME/GB standard carbon steel or alloy steel
Tube size Customized
Standard As per ASME/GB standard
Equipment Automatic production equipment
Application Maintenance of Sugar Mill Boiler and Power Plant Boiler
 

 

Various Boiler Water Wall Panel Can Be Fabricated

  • Membrane boiler water wall panel: spot welds many rolled finned tubes into a sealed combined heating surface, which improves the airtightness of the furnace and reduces air leakage.
  • Studded water wall tubing: welds pins of 20 to 25 mm in length and 6 to 12 mm in diameter on the water wall tube, and then applies a chrome ore refractory plastic to reduce the water wall panel’s heat absorption, and increase the temperature in the combustion zone. It is appropriate for situations where it is difficult to set fire to the fuel, as well as specific slag tapping furnaces.
  • Plain tube boiler water wall panel: composed of a whole row of seamless steel pipes, the simplest structure.
  • Wall-attached boiler water wall tubing: embedded in the inner wall of the furnace wall, single-sided heat absorption.
  • Double-sided heated water wall panel: installed in the middle of the large boiler furnace, which is divided into two parts that are independent of each other, and both sides are heated.

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement