Payment Terms | L/C, T/T, Western Union |
Supply Ability | 500 tons per month |
Delivery Time | 60~150 days |
Packaging Details | Seaworthy packing |
Porduct Name | Boiler Economizer Bank |
Application | Coal-fired Boilers and Waster Incinerator |
Material of Base Tube | SA210A1 |
Keyword | Boiler Economizer |
Production Technique | Hot Bending, Extrusion |
Packing | Steel Frames |
Brand Name | HDB |
Model Number | Boiler Economizer |
Certification | ASME, EN, ISO9001, SGS |
Place of Origin | China |
View Detail Information
Explore similar products
SA210A1 Steel Boiler Economizer Heat Exchange Part ISO9001 Certification
Carbon Steel Seamless Tube Economizer For Boiler Heat Exchanger ASME Waste Heat
Biomass Boiler Economizer With Carbon Steel Seamless Tube H Fin High Frequency
Boiler Heat Exchanger , Boiler Spiral Fin Tube Economizer ,Economizer Module in
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 500 tons per month |
Delivery Time | 60~150 days | Packaging Details | Seaworthy packing |
Porduct Name | Boiler Economizer Bank | Application | Coal-fired Boilers and Waster Incinerator |
Material of Base Tube | SA210A1 | Keyword | Boiler Economizer |
Production Technique | Hot Bending, Extrusion | Packing | Steel Frames |
Brand Name | HDB | Model Number | Boiler Economizer |
Certification | ASME, EN, ISO9001, SGS | Place of Origin | China |
High Light | ASME Standard Boiler Economizer Banks ,Boiler Economizer of CS Tubes ,Boiler Economizer For Waste Incinerators |
Boiler Economizer Banks Made of CS Tubes in ASME Standard for Waste Incinerators
Product Introdution
Our economizers are generally made of 20 low and medium pressure boiler pipes, 20G seamless steel tubes or ASME grade steel tubes. It reduces the flue gas temperature and maximizes the heat recovery to help customers reduce fuel costs.
Parameters of Boiler Economizer
Description | Boiler economizer |
Material | Alloy steel, Carbon steel, SA210C ,SA213T22, etc. |
Material standard | ASTM, EN or ISO etc. |
Dimension | Customization |
Weight | Min: 10 ton Max.:1000 ton |
Process | Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames |
Working Process of Boiler Economizer
There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).
Company Profile
The products of our company have been widely used in major power plants of various provinces and cities in China, bringing stable and significant economic and social benefits to cooperated power plants. At the same time, we attach great importance to product development and strive to improve product quality. Through the cooperation with a number of domestic and foreign companies, we constantly explore the international market.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!