China factories

Chat Now Send Email
China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China High Safety Level Boiler Manifold Header with 1 Year Warranty and 5 Years Core
China High Safety Level Boiler Manifold Header with 1 Year Warranty and 5 Years Core

  1. China High Safety Level Boiler Manifold Header with 1 Year Warranty and 5 Years Core
  2. China High Safety Level Boiler Manifold Header with 1 Year Warranty and 5 Years Core
  3. China High Safety Level Boiler Manifold Header with 1 Year Warranty and 5 Years Core
  4. China High Safety Level Boiler Manifold Header with 1 Year Warranty and 5 Years Core
  5. China High Safety Level Boiler Manifold Header with 1 Year Warranty and 5 Years Core
  6. China High Safety Level Boiler Manifold Header with 1 Year Warranty and 5 Years Core

High Safety Level Boiler Manifold Header with 1 Year Warranty and 5 Years Core

  1. MOQ: 3
  2. Price: $1,200-1,500
  3. Get Latest Price
Type Natural Circulation
Structure fire tube and water tube
Pressure Low / High Pressure
Steam production Max. 20t/h
Style Horizontal
Fuel Coal / Gas / Coal-fired / Water Heat
Output Hot Water / Steam
Surface Treatment Painted
Diameter (OD) ∅76mm~∅914mm
Max Length 23000mm
Temperature Range 300~1500℃
Material Options 20G, SA-106B, SA-106C, 15CrMoG, 12Cr1MoVG, SA-335P12, SA335-P22, SA-335P91, SA-335P122, SA-335P92
Header Types water wall header, superheater header, economizer header
Construction Type end cover type or necking down type
Operation Mode Steam distribution with bypass and drain valves
Place of Origin Zhangjiagang,China
Brand Name HD Boiler
Certification ISO9001,ASME,,EN,CE
Model Number Manifold water wall header

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Type Natural Circulation Structure fire tube and water tube
Pressure Low / High Pressure Steam production Max. 20t/h
Style Horizontal Fuel Coal / Gas / Coal-fired / Water Heat
Output Hot Water / Steam Surface Treatment Painted
Diameter (OD) ∅76mm~∅914mm Max Length 23000mm
Temperature Range 300~1500℃ Material Options 20G, SA-106B, SA-106C, 15CrMoG, 12Cr1MoVG, SA-335P12, SA335-P22, SA-335P91, SA-335P122, SA-335P92
Header Types water wall header, superheater header, economizer header Construction Type end cover type or necking down type
Operation Mode Steam distribution with bypass and drain valves Place of Origin Zhangjiagang,China
Brand Name HD Boiler Certification ISO9001,ASME,,EN,CE
Model Number Manifold water wall header
High Light High Safety Level Boiler Manifold Header1 Year Warranty Steam Manifold Header5 Years Core Components Warranty Steam Header

htp boilers

 

 

Condensate pipe htp main boilers

Product Description

 

 

Product Description

 

Steam distribution headers are fabricated out of carbon steel or alloy steel seamless tubes. Customised or tailor made items are offered. Headers, after fabrication, are stress relieved to make the Steam distribution headers free from stresses.They are big pipe headers that transfer water from the downcomers to the risers through a combustion zone where the water gets partially heated to steam from the heat of fuel combustion.

 

Operation

 

In bringing a boiler on the line with other boilers on a header system,certain precautionss are necessary to avoid water hammer and excessive temperature gradients in the piping.Adequate drainage and warming of the piping will eliminate the risk of water hammer.The judicious use of bypass valves around main header valves will avoid steep temperature gradients.Header drains should be operated.The steam line from the boiler to the header should be brought up to temperature by operationg bypass and drain valves.When up to temperature and line pressure,the header valve may be opened wide and the bypass closed.

 

Technical parameters

 

Diameter(OD) ∅76mm~∅914mm
Length(Max) 23000mm
Temperature(℃) 300~1500

 

Application

 

The steam boiler pressure part header with large diameter longitudinal welded pipe have water wall header, superheater header, economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.

 
Material
 

1. Carbon steel:20G,SA-106B,SA-106C,etc.

2. Low-alloy thermal resistant steel:15CrMoG,12Cr1MoVG,SA-335P12,SA335-P22,etc.

3. Middle-alloy thermal resistant steel:SA-335P91,etc.

4. Special material(ultra-supercritical):SA-335P122,SA-335P92,etc.

The boiler headers have water wall header,superheater header,economizer header and so on. It acts action of gathering, mixing and redistribution in boiler systems. In structure, they include end cover hinders or necking hinders.

Similar Products

 

Company Information

 

Certificate

 

Packaging & Shipping

 

FAQ

 

Contact Us

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement