China factories

Chat Now Send Email
China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China High Efficiency Boiler Economizer Heat Exchanger with Max. 20t/h Steam
China High Efficiency Boiler Economizer Heat Exchanger with Max. 20t/h Steam

  1. China High Efficiency Boiler Economizer Heat Exchanger with Max. 20t/h Steam
  2. China High Efficiency Boiler Economizer Heat Exchanger with Max. 20t/h Steam
  3. China High Efficiency Boiler Economizer Heat Exchanger with Max. 20t/h Steam
  4. China High Efficiency Boiler Economizer Heat Exchanger with Max. 20t/h Steam
  5. China High Efficiency Boiler Economizer Heat Exchanger with Max. 20t/h Steam
  6. China High Efficiency Boiler Economizer Heat Exchanger with Max. 20t/h Steam

High Efficiency Boiler Economizer Heat Exchanger with Max. 20t/h Steam

  1. MOQ: 20
  2. Price: $2,200-2,500
  3. Get Latest Price
Type Natural Circulation
Structure fire tube and water tube
Pressure Low / High Pressure
Steam production Max. 20t/h
Style VERTICAL
Output Hot Water / Steam
Surface Treatment Painted
Fuel Coal-fired
Material Alloy steel, Carbon steel, SA210C, SA213T22
Material standard ASTM, EN or ISO
Weight range 10 ton - 1000 ton
Smelting Process EF+LF+VD
UT standard ASTM A388 or EN10228
Process Material->Ingot->Hot/Cold-Rolling->Heat treatment->Inspection->rough machining->UT->2nd Heat treatment->finishing machining->Inspection
Hydraulic test Standard working pressure and safety
Place of Origin Zhangjiagang, China
Brand Name HD Boiler
Certification ISO9001,ASME, EN
Model Number Bare type Economizer

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Type Natural Circulation Structure fire tube and water tube
Pressure Low / High Pressure Steam production Max. 20t/h
Style VERTICAL Output Hot Water / Steam
Surface Treatment Painted Fuel Coal-fired
Material Alloy steel, Carbon steel, SA210C, SA213T22 Material standard ASTM, EN or ISO
Weight range 10 ton - 1000 ton Smelting Process EF+LF+VD
UT standard ASTM A388 or EN10228 Process Material->Ingot->Hot/Cold-Rolling->Heat treatment->Inspection->rough machining->UT->2nd Heat treatment->finishing machining->Inspection
Hydraulic test Standard working pressure and safety Place of Origin Zhangjiagang, China
Brand Name HD Boiler Certification ISO9001,ASME, EN
Model Number Bare type Economizer
High Light Max. 20t/h Steam Production Boiler Economizer3 Years Warranty Heat ExchangerLow Price Boiler Membrane Wall
Products Description

Introduction

Boiler economizers are heat exchange devices with finned tubes that heat a liquid, sometimes water, up to however sometimes doesn't exceed the boiling purpose of liquid. We can manufacture three types of boiler economizer, bare tube economizer, H finned tube economizer and spiral finned tube economizer. H-finned tube economizer is high efficient heat exchanger economizer which is consisted of H-finned tubes.

Compared with bare tube economizer, H-finned tube economizer can enlarge the heat exchange area and reduce the number of tubes. It also can increase the flue gas flow area in order to reduce the flue gas flow speed and abrasion.
H-finned tube can be made as double H finned tubes , with high rigidness to fit long tube row.
The spiral finned economizer is a newly designed heat transfer equipment, consists of spiral fin tubes to overcome the serious abrasion and short service time.

Function

The function of the economizer is as its name implies, to “economize” or save on cooling costs. Obviously, it costs money to operate the compressor. If the compressor can be shut down and the system still provide adequate cooling, energy savings can be realized.
Product Paramenters
Description
Boiler economizer
Material
Alloy steel, Carbon steel, SA210C ,SA213T22, etc.
Material standard
ASTM, EN or ISO etc.
Dimension
Customization
Weight
Min: 10 ton
Max.:1000 ton
Smelting Process:
EF+LF + VD
Process
Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →rough machining→UT →2nd Heat treatment
→finishing machining →Inspection
UT standard
ASTM A388 or EN10228, etc
Product packaging
For special cargos, such as overlength, overwidth, overheight and overweight cargos, we will choose frame boxes for easy handling.
For regular goods, we prefer ordinary containers
After loading the goods, we will reinforce them in all aspects
Company Profile
Zhangjiagang Hua Dong Boiler Co., Ltd.,
founded in 1985, is an enterprise specializing in manufacturing power station boilers, industrial boilers, HRSGs, waste incineration boilers, biomass boilers and related heating surface components in China. Hua Dong Boiler provides clients with integrated services from
design, manufacturing to installation and maintenance.
Our Advantages

38 years experience in industry research, development and manufacturing with sufficient production capacity.

Quality Control

1. Impact test and Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and electrode
3. X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler
4. Hydraulic test report: ensure the standard working pressure and safety
Complete quality assurance and control system which certified according to the International Quality Standard.
Establish a quality assurance system faithfully in compliance with the national regulations, standards and other technical requirements. The quality of process and products is 100% under control. Ensured all the products are manufactured faithfully in accordance with the contract requirements, national regulations and standards by stringent inspection and test over materials and products during manufacturing.
Certifications
Owns verification certificates:
ISO 9001: 2015; CE certificate; EN ISO 3834-2; ASME certificate with "S", "U" and "NB" stamps, etc.
Global Sales
FAQ
Q1: How long is the warranty period?
We provide 18 months warranty for all spare parts(exclude fragile parts).

Q2: How can we guarantee quality?
1) All machines are in strict accordance with the ISO quality and CE system requirements.
2) Each procedure is crafted by professional Skilled labour, followed by particular QC
3) All information of our products can be checked in efficient management system.

Q3: What can you buy from us?
CFB Boiler, HRSG Boiler, Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler superheater, Boiler membrane wall,
Boiler manifold headers and other pressure spare parts.


Q4: What kind of service do you provide?
Before sales:
Provide productinformations, market research forecasting, product customization,product processing,consultation and other services for your convenience.

After sales:
1. Technical training on according to customer requirements;
2. We promise replacement under warranty;
3. We promise to supply the maintenance spare parts;
4. Regular call back or visit customers;
5. On time response to mail and phone calls of your complaints or consultation.

Accepted Delivery Terms: FOB, CFR, CIF, EXW, FCA;
Accepted Payment Currency: USD, CNY;
Accepted Payment Type: T/T, L/C, MoneyGram, Western Union, Cash;
Language Spoken:English,Chinese

Q5: Are you a factory or trading company, where are you located?
We are a factory, just 130km(2 hours by car) away from Shanghai Airport.
We offer pickup service at Shanghai for your visit.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement