China SA210 Gr.C CFB Boiler Membrane Wall Panel with φ63.5×6mm Thick Wall Tube and
China SA210 Gr.C CFB Boiler Membrane Wall Panel with φ63.5×6mm Thick Wall Tube and

  1. China SA210 Gr.C CFB Boiler Membrane Wall Panel with φ63.5×6mm Thick Wall Tube and

SA210 Gr.C CFB Boiler Membrane Wall Panel with φ63.5×6mm Thick Wall Tube and

  1. MOQ: 1 Set
  2. Price: USD 900-1400 / Ton
  3. Get Latest Price
Payment Terms T/T, L/C
Supply Ability 8000 Tons per Year
Delivery Time 30-50 working days
Packaging Details Steel frame with export-grade waterproof wrapping, seaworthy packing
Tube Outer Diameter φ63.5mm
Tube Wall Thickness 6mm
Tube Material SA210 Gr.C
Membrane Bar Material Q245R Carbon Steel
Tube Pitch 100-120mm
Panel Width Customizable
Panel Length Up to 15000mm
Welding Method Submerged arc welding
Working Pressure Up to 12.7MPa
Application CFB Boiler Furnace, Erosion Zone
Brand Name HD Boiler
Model Number MW-CFB-635x6
Place of Origin Jiangsu, China
Certification ISO 9001:2015, ASME, CE

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, L/C Supply Ability 8000 Tons per Year
Delivery Time 30-50 working days Packaging Details Steel frame with export-grade waterproof wrapping, seaworthy packing
Tube Outer Diameter φ63.5mm Tube Wall Thickness 6mm
Tube Material SA210 Gr.C Membrane Bar Material Q245R Carbon Steel
Tube Pitch 100-120mm Panel Width Customizable
Panel Length Up to 15000mm Welding Method Submerged arc welding
Working Pressure Up to 12.7MPa Application CFB Boiler Furnace, Erosion Zone
Brand Name HD Boiler Model Number MW-CFB-635x6
Place of Origin Jiangsu, China Certification ISO 9001:2015, ASME, CE
High Light CFB Boiler Membrane Wallφ63.5×6mm Thick Wall PanelCirculating Fluidized Bed Tube
SA210 Gr.C CFB Boiler Membrane Wall Panel φ63.5×6mm Thick Wall Tube Circulating Fluidized Bed Furnace Section
SA210 Gr.C CFB Boiler Membrane Wall Panel - φ63.5*6mm Heavy-Duty

The SA210 Gr.C CFB Boiler Membrane Wall Panel is purpose-built for circulating fluidized bed (CFB) boilers, featuring φ63.5*6mm thick-wall SA210 Gr.C carbon steel tubes. This panel is engineered to withstand the intense erosive conditions created by high-velocity solid particle circulation in CFB furnace lower sections and refractory transition zones.

Material & Construction

Fabricated from SA210 Gr.C medium carbon steel seamless tubes with industry-leading 6mm wall thickness. In CFB boilers, the dense bed region subjects water wall tubes to severe particle impingement erosion. The 6mm heavy wall design, combined with SA210 Gr.C's high tensile strength (≥485 MPa), provides extended service life in these aggressive environments. Q245R membrane bars are joined using submerged arc welding (SAW) for deep, consistent weld penetration across the full fin width.

Key Features
  • CFB-Optimized Design: φ63.5*6mm tube dimensions with 100-120mm tube pitch are specifically configured for CFB boiler heat transfer characteristics and erosion management
  • Erosion Resistant: 6mm wall thickness provides substantial erosion allowance for the high particle loading conditions in CFB lower furnace zones, where bed material velocities exceed 5 m/s
  • Metal Spray Coating Ready: Panel surface preparation compatible with thermal spray coating (HVOF) application for additional erosion protection in the most severe wear zones
  • SAW Welded Membrane: Submerged arc welding delivers full penetration fin-to-tube bonds that resist crack propagation from erosive wear at the tube-fin interface
  • Field Assembly Friendly: Pre-machined weld preparation on all panel edges reduces on-site welding time and improves field joint quality control
Quality Assurance

100% UT of tube butt welds and fin-to-tube bonds. Dimensional verification including tube straightness (<2mm/meter) and panel flatness. Hydrostatic testing at 1.5x design pressure. Full material certification per ASME/ASTM standards with heat number traceability.

Technical Specifications
Parameter Specification
Tube OD φ63.5mm
Tube Wall Thickness 6mm
Tube Material SA210 Gr.C
Membrane Bar Material Q245R
Tube Pitch 100-120mm
Welding Method Submerged arc welding
Standard ASME Section I, GB/T 9222
Applications

Lower furnace water wall sections (dense bed zone), refractory-to-water-wall transition areas, and cyclone inlet/outlet duct panels in circulating fluidized bed boilers from 35 t/h to 1025 t/h capacity. Also applicable for bubbling fluidized bed (BFB) boiler furnace walls.

Contact our CFB boiler specialists for erosion assessment and panel design optimization for your specific fuel type and operating conditions.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement