China factories

Chat Now Send Email
China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China SA210 Gr.C Carbon Steel Boiler Membrane Wall Panel with φ51×5mm Seamless Tube
China SA210 Gr.C Carbon Steel Boiler Membrane Wall Panel with φ51×5mm Seamless Tube

  1. China SA210 Gr.C Carbon Steel Boiler Membrane Wall Panel with φ51×5mm Seamless Tube

SA210 Gr.C Carbon Steel Boiler Membrane Wall Panel with φ51×5mm Seamless Tube

  1. MOQ: 1 Set
  2. Price: USD 850-1300 / Ton
  3. Get Latest Price
Payment Terms T/T, L/C
Supply Ability 10000 Tons per Year
Delivery Time 30-45 working days
Packaging Details Steel frame with export-grade waterproof wrapping, seaworthy packing
Tube Outer Diameter φ51mm
Tube Wall Thickness 5mm
Tube Material SA210 Gr.C
Membrane Bar Material Carbon Steel Q245R
Tube Pitch 80-100mm
Panel Width Customizable
Panel Length Up to 15000mm
Welding Method High-frequency resistance welding
Working Pressure Up to 12.7MPa
Application HRSG, Combined Cycle Power Plant
Brand Name HD Boiler
Model Number MW-SA210C-51x5
Place of Origin Jiangsu, China
Certification ISO 9001:2015, ASME, CE

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, L/C Supply Ability 10000 Tons per Year
Delivery Time 30-45 working days Packaging Details Steel frame with export-grade waterproof wrapping, seaworthy packing
Tube Outer Diameter φ51mm Tube Wall Thickness 5mm
Tube Material SA210 Gr.C Membrane Bar Material Carbon Steel Q245R
Tube Pitch 80-100mm Panel Width Customizable
Panel Length Up to 15000mm Welding Method High-frequency resistance welding
Working Pressure Up to 12.7MPa Application HRSG, Combined Cycle Power Plant
Brand Name HD Boiler Model Number MW-SA210C-51x5
Place of Origin Jiangsu, China Certification ISO 9001:2015, ASME, CE
High Light SA210 Gr.C Water Wall Panelφ51×5mm HRSG Membrane WallSeamless Boiler Tube Section
SA210 Gr.C Carbon Steel Boiler Membrane Wall Panel φ51×5mm Seamless Tube HRSG Water Wall Section
SA210 Gr.C Carbon Steel Boiler Membrane Wall Panel - φ51×5mm for HRSG

The SA210 Gr.C Carbon Steel Boiler Membrane Wall Panel with φ51×5mm seamless tubes is engineered for heat recovery steam generator (HRSG) water wall sections in combined cycle power plants. This heavy-duty panel delivers reliable performance under cyclic thermal loading conditions.

Material & Construction

Fabricated from SA210 Gr.C medium carbon steel seamless boiler tubes, offering higher tensile strength compared to Gr.A1. The tubes are welded to Q245R carbon steel membrane bars using precision high-frequency resistance welding (HFRW), creating a continuous gas-tight membrane structure. SA210 Gr.C provides excellent creep resistance at elevated temperatures up to 450°C.

Key Features
  • Enhanced Strength: SA210 Gr.C material provides superior yield and tensile strength for high-pressure applications
  • HRSG Optimized: Designed to withstand thermal cycling typical of combined cycle plant start-stop operations
  • Leak-Proof Welding: 100% HFRW with automated weld monitoring ensures consistent membrane bond integrity
  • Modular Design: Pre-fabricated panel sections reduce on-site welding and installation time by up to 40%
  • Full Traceability: Each tube is marked and traceable to its original heat number and material test certificate
Quality Assurance

All panels undergo hydrostatic testing, radiographic examination of tube butt welds, and dimensional inspection per ASME Section I requirements. Material certificates per EN 10204 3.1 are provided with each shipment.

Technical Specifications
Parameter Specification
Tube OD φ51mm
Tube Wall Thickness 5mm
Tube Material SA210 Gr.C
Membrane Bar Material Q245R
Tube Pitch 80-100mm
Welding Method High-frequency resistance welding
Standard ASME Section I & VIII, EN 12952
Applications

Specifically designed for HRSG evaporator water wall sections in combined cycle gas turbine (CCGT) plants, cogeneration facilities, and industrial waste heat recovery systems. Custom configurations available for replacement and new-build projects.

Send us your boiler drawings and specifications for a detailed quotation with lead time and shipping options.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement