Payment Terms | L/C,T/T,Western Union |
Supply Ability | 500 tons per month |
Delivery Time | 60~80 days |
Packaging Details | Seaworthy packing |
Porduct Name | Boiler Economizer Coils |
Dimension of Tube | OD32mm*Thickness4mm |
Material of Base Tube | SA210C |
Keyword | Boiler Economizer |
Production Technique | Tube Bending, Assembly |
Packing | Steel Frame |
Brand Name | HDB |
Model Number | Boiler Economizer |
Certification | ASME, EN, ISO9001, SGS |
Place of Origin | China |
View Detail Information
Explore similar products
Power Station / Power Plant Serpentine Tube for Hot Water/Steam Output Steam
SA210A1 Steel Boiler Economizer Heat Exchange Part ISO9001 Certification
Carbon Steel Seamless Tube Economizer For Boiler Heat Exchanger ASME Waste Heat
Biomass Boiler Economizer With Carbon Steel Seamless Tube H Fin High Frequency
Product Specification
Payment Terms | L/C,T/T,Western Union | Supply Ability | 500 tons per month |
Delivery Time | 60~80 days | Packaging Details | Seaworthy packing |
Porduct Name | Boiler Economizer Coils | Dimension of Tube | OD32mm*Thickness4mm |
Material of Base Tube | SA210C | Keyword | Boiler Economizer |
Production Technique | Tube Bending, Assembly | Packing | Steel Frame |
Brand Name | HDB | Model Number | Boiler Economizer |
Certification | ASME, EN, ISO9001, SGS | Place of Origin | China |
High Light | ASME Standard Boiler Economizer Coils ,SA210C Boiler Economizer Coils ,Handcuffs Boiler Economizer Coils |
Boiler Economizer Coils Made Of SA210C With Handcuffs in ASME Standard
Product Introduction
Economizer is a device installed at the lower part of the flue at the tail of the boiler to recover the waste heat of the exhaust gas. It heats the boiler feed water into a heating surface of saturated water under the pressure of the drum. Because it absorbs the heat of high-temperature flue gas, reduces the exhaust gas temperature, saves energy and improves efficiency, it is called an economizer.
Parameters of Boiler Economizer
Description | Boiler economizer |
Material of Base Tube | SA210C or others customized |
Material standard | ASTM |
Dimension | Customization |
Weight | Min: 10 ton Max.:1000 ton |
Process | Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames |
Quality Control
1. Impact test and Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and electrode
3. X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler
4. Hydraulic test report: ensure the standard working pressure and safety
Company Profile
founded in 1985, is an enterprise specializing in manufacturing power station boilers, industrial boilers, HRSGs, waste incineration boilers, biomass boilers and related heating surface components in China. Hua Dong Boiler provides clients with integrated services from design, manufacturing to installation and maintenance.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!