Payment Terms | 30% after contract and balance 70% before shipment, or 100% L/C at sight |
Supply Ability | 100 tons/Month |
Delivery Time | Depands on Qty |
Packaging Details | Iron frame Packing |
Pressure | Low/High Pressure |
Material | Carbon Steel/Stainless Steel |
Coler | Red/blue/silver |
Inlet Temperature | 150-300℃ |
Boiler Capacity | 1T-10T |
Keyword | Economizer |
Application | Boiler System |
Port | Shanghai |
Brand Name | HD Boiler |
Model Number | Boiler economizer |
Certification | ASME, ISO9001:2015, ISOEN3834 |
Place of Origin | China |
View Detail Information
Explore similar products
Power Station / Power Plant Serpentine Tube for Hot Water/Steam Output Steam
SA210A1 Steel Boiler Economizer Heat Exchange Part ISO9001 Certification
Carbon Steel Seamless Tube Economizer For Boiler Heat Exchanger ASME Waste Heat
Biomass Boiler Economizer With Carbon Steel Seamless Tube H Fin High Frequency
Product Specification
Payment Terms | 30% after contract and balance 70% before shipment, or 100% L/C at sight | Supply Ability | 100 tons/Month |
Delivery Time | Depands on Qty | Packaging Details | Iron frame Packing |
Pressure | Low/High Pressure | Material | Carbon Steel/Stainless Steel |
Coler | Red/blue/silver | Inlet Temperature | 150-300℃ |
Boiler Capacity | 1T-10T | Keyword | Economizer |
Application | Boiler System | Port | Shanghai |
Brand Name | HD Boiler | Model Number | Boiler economizer |
Certification | ASME, ISO9001:2015, ISOEN3834 | Place of Origin | China |
High Light | 1T-10T boiler economizer ,high-efficiency boiler economizer ,boiler economizer for heating systems |
Customized Experience Significant Savings With Our High-Efficiency Boiler Economizer
Product Description
The economizers typically consist of a series of pipes arranged in parallel, often in a curved shape to increase the contact area between the flue gas and the incoming water. The flue gas passes through the boiler combustion chamber and enters the economizer, where it flows in the pipe. At the same time, the inlet water of the boiler also passes through the pipes of the economizer and exchanges heat with the flue gas. The heat in the flue gas is transferred to the inlet water, which lowers the flue gas temperature and increases the inlet water temperature. In this way, the heat in the flue gas is recovered and the thermal efficiency of the boiler is improved.
Function
1. Absorb the heat of low-temperature flue gas, reduce the exhaust temperature, reduce the exhaust loss, and save fuel.
2. Because the feed water is heated in the economizer before entering the steam drum, the heat absorption of the feed water on the heating surface is reduced, and the economizer can be used to replace part of the evaporation heating surface with high cost.
3. When the feed water temperature increases, the wall temperature difference will be reduced when it enters the steam drum, and the thermal stress will be reduced accordingly, prolonging the service life of the steam drum.
Energy-saving principle
Add a reheating process to the cycle. Increase the average temperature of endothermy. This increases the efficiency of the cycle. During the start-up process of the boiler (drum boiler), because the circulation of its steam-water pipeline is not established, that is, the boiler feed water is in a stagnant state, and the water in the economizer is in a state of non-flow at this time. With the strengthening of boiler combustion and the increase of flue gas temperature, the water in the economizer is easy to vaporize, so that the part of the economizer is in an overtemperature state. In order to avoid this situation, a pipe is connected from the centralized sewer pipe of the steam drum to the inlet of the economizer as a recirculation pipe, so that the water in the economizer is in a flowing state to avoid its vaporization.
Features
Packaging and Shipping
Parameters
Description | Boiler economizer |
Material | Alloy steel, Carbon steel, SA210C ,SA213T22, etc. |
Material standard | ASTM, EN or ISO etc. |
Dimension | Customization |
Weight | Min: 10 ton Max.:1000 ton |
Smelting Process: | EF+LF + VD |
Process | Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →rough machining→UT →2nd Heat treatment →finishing machining →Inspection |
UT standard | ASTM A388 or EN10228, etc |
Why Choose Our Boiler Economizer?
Contact Us
If you are looking for a reliable and high-quality Boiler Economizer, look no further than HD Boiler. Contact us today to learn more and to place your order!
FAQ
A: The brand name of this product is HD Boiler.
A: The model number of this product is Boiler economizer.
A: This product is made in China.
A: This product is certified by ASME, ISO9001:2015, and ISOEN3834.
A: The minimum order quantity for this product is 3 tons.
A: Yes, the price for this product is negotiable.
A: This product is packaged in iron frames.
A: The delivery time for this product depends on the quantity ordered.
A: The payment terms for this product are 30% after contract and balance 70% before shipment, or 100% L/C at sight.
A: The supply ability for this product is 100 tons per month.
Parameters
Description | Boiler economizer |
Material | Alloy steel, Carbon steel, SA210C ,SA213T22, etc. |
Material standard | ASTM, EN or ISO etc. |
Dimension | Customization |
Weight | Min: 10 ton Max.:1000 ton |
Smelting Process: | EF+LF + VD |
Process | Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →rough machining→UT →2nd Heat treatment →finishing machining →Inspection |
UT standard | ASTM A388 or EN10228, etc |
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!