China factories

Chat Now Send Email
China factory - Jiangsu Sat-Cham Energy Technology Co., Ltd.

Jiangsu Sat-Cham Energy Technology Co., Ltd.

  • China,Suzhou
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Factory Rate X42 X50 2mm 4mm 6mm Thickness Round Carbon Seamless Steel Pipe
China Factory Rate X42 X50 2mm 4mm 6mm Thickness Round Carbon Seamless Steel Pipe

  1. China Factory Rate X42 X50 2mm 4mm 6mm Thickness Round Carbon Seamless Steel Pipe
  2. China Factory Rate X42 X50 2mm 4mm 6mm Thickness Round Carbon Seamless Steel Pipe
  3. China Factory Rate X42 X50 2mm 4mm 6mm Thickness Round Carbon Seamless Steel Pipe
  4. China Factory Rate X42 X50 2mm 4mm 6mm Thickness Round Carbon Seamless Steel Pipe
  5. China Factory Rate X42 X50 2mm 4mm 6mm Thickness Round Carbon Seamless Steel Pipe

Factory Rate X42 X50 2mm 4mm 6mm Thickness Round Carbon Seamless Steel Pipe

  1. MOQ: 1
  2. Price: 500
  3. Get Latest Price
Surface Treatment Painted
Production Capacity 500 Tons/Month
Metrial SUS/Alloy/Carbon
Transport Package Frame Packing
Application Boiler System
Delivery 30 Days
Origin Suzhou, China
Trademark SAT-CHAM
Warranty 1 Year
Range of Applications Industrial
Type Stainless Pipe

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Surface Treatment Painted Production Capacity 500 Tons/Month
Metrial SUS/Alloy/Carbon Transport Package Frame Packing
Application Boiler System Delivery 30 Days
Origin Suzhou, China Trademark SAT-CHAM
Warranty 1 Year Range of Applications Industrial
Type Stainless Pipe
High Light 2mm seamless carbon steel pipe4mm round boiler fin tube6mm thickness steel pipe

Product Description

Steel pipes are long, hollow tubes that are used for a variety of purposes. They are produced by two distinct methods which result in either a welded or seamless pipe. In both methods, raw steel is first cast into a more workable starting form. It is then made into a pipe by stretching the steel out into a seamless tube or forcing the edges together and sealing them with a weld. The first methods for producing steel pipe were introduced in the early 1800s, and they have steadily evolved into the modern processes we use today. Each year, millions of tons of steel pipe are produced. Other places they find utility is in automobiles, refrigeration units, heating and plumbing systems, flagpoles, street lamps, and medicine to name a few.our steel tubing is available in a variety of custom shapes, diameters, walls, and lengths to meet your application needs. Custom orders are our specialty.  We specialize in the hard to find and/or odd sizes of mild carbon and alloy tubing.   Talk to any one of our sales associates about your specific application and we'll cut and ship the right steel tubing at the right price at the right time.

Product Parameters
Name Seamless carbon steel pipes
Pipe Size 1/2-"32" 
Wall Thickness SCH10,SCH20,SCH30,STD,SCH40,SCH60,XS,SCH80,
SCH100,SCH120,
SCH140,SCH160,XXS,DIN, JIS standard thickness
Length 5.8m,6m, 11.8m,12m or depending on customers' requirements
Standard ASTM A53, A106, API 5L, ASME B36.10M-1996
DIN1626, DIN1629, DIN17175, DIN 2448
JIS G3452,JIS G3454,JIS G3455,JIS G3456,JIS G3457,JIS G3461
Material Q235, 20#, Q345
A53B, A106B, API 5L B,X42,X46,X52,X60, X65
ST37.0,ST35.8,St37.2,St35.4/8,St42,St45,St52,St52.4
STP G38,STP G42,STPT42,STB42,STS42,STPT49,STS49
Application Low and middle pressure fluid pipeline, boiler, petroleum 
and natural gas industry, drilling, chemical
Surface Black painting, black varnish, transparent oil, hot galvanized, 
3PE,epoxy coating,BE,PE.etc.
Package As per customers' request
Certificate ISO9001, API etc
Delivery EXW FOB CIF CFR
Payment Bank Transfer
Advantages 1.Reasonable price with excellent quality
2.Abundant stock and prompt delivery
3.Rich supply and export experience, sincere service
4.Reliable forwarder, 2-hour away from port.
Jiangsu Satcham Energy Technology CO.,LTD
Detailed Photos
 
Application
Low and middle pressure fluid pipeline, boiler, petroleum and natural gas industry, drilling, chemical industry, electric industry, shipbuilding, fertilizer equipment and pipeline, structure, petrochemical, pharmaceutical industry.
 
Surface
Black painting, varnish paint, anti rust oil, hot galvanized, cold galvanized, 3PE, etc.
 
Package
Plastic film, wooden cases, wooden pallet, or on customers' request
 
Certificate
ASTM ISO:9001
 


Advantages
1. Reasonable price with excellent quality
2. Abundant stock and prompt delivery
3. Rich supply and export experience, sincere service
4. Reliable forwarder, 2 hours away from port.

Company Profile

Jiangsu Sat-Cham Energy Technology Co., Ltd. is committed to boiler components supporting solutions. The company is located in the beautiful environment, economic prosperity of Zhangjiagang City, Suzhou. With Shanghai to the east, Nanjing and Changzhou to the west, Nantong to the north, Suzhou and Wuxi to the south, it is located in the golden area of the "Chang-Tri-horn". Unique geographical location, land and water transportation is fast and convenient.

The company now covers an area of 15,000 square meters, production area of 10,000 square meters. Fixed assets of more than 10 million yuan. There are 50 employees, 10 engineering and technical personnel. The company is equipped with purchasing, technology, quality inspection, sales, production, company office, finance seven management departments; And pipe system, membrane walls, collecting box, module, paint packaging and other three production workshops. It has advanced automatic welding equipment such as Membrane assembly submerged arc automatic welding, automatic welding of fin tube and testing equipment. Sat-Cham  is a high-tech enterprise integrating design, manufacturing, production and sales.

 

Our Advantages

1.Ensure sealing of furnace wall and reduce air leakage in combustion chamber.
2.Realize full water cooling of the combustion chamber, which is helpful to prevent coke formation in the case of intensified combustion.
3.Small capacity of heat storage, fast heating of combustion chamber and rapid cooling, can shorten the cooling time of boiler start and stop.
4.It is appropriate to use pipe furnace wall, which greatly reduces the load of boiler frame and is convenient for suspension.
5.Compared with the optical tube, the heat absorption capacity of the tube is improved.
6.The pre-combination degree of boiler components is improved, which is convenient and reduces the installation workload.
 

 

FAQ

Q1:  How long is the warranty period?
        We provide 18 months warranty for all spare parts(exclude fragile parts).

Q2:  How can we guarantee quality?
       1  All machines are in strict accordance with the ISO quality and CE system requirements.
       2  Each procedure is crafted by professional Skilled labour, followed by particular QC
       3  All information of our products can be checked in efficient management system.

Q3:  What can you buy from us?
        Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler superheater, Boiler membrane wall,Boiler manifold headers and other pressure spare parts.

Q4:  What kind of service do you provide?
        Before sales:Provide productinformations, market research forecasting, product customization,product processing,consultation and other services for your convenience.

Q5:  Are you a factory or trading company, where are you located?

       We are a factory, just 130km(2 hours by car) away from Shanghai Airport.

       We offer pickup service at Shanghai for your visit.

Get in touch with us

  • Reach Us
  • Jiangsu Sat-Cham Energy Technology Co., Ltd.
  • Room 216-1589, Textile Raw Materials Market, Zhangjiagang Free Trade Zone, Suzhou, China
  • https://www.boilers-part.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement