Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 500Ton/Tons per Month |
Delivery Time | 50~100 Days |
Packaging Details | Iron Frame Package |
Name | Boiler Water Wall Panels |
Structure | Fire/Water Tube |
Pressure | High/Low Pressure |
Fuel | Coal/Gas/Oil-fired, Water Heat |
Output | Hot Water/Steam |
Dimension(L*W*H) | Customization |
Brand Name | ORL Power |
Model Number | Customization |
Certification | ISO9001/SGS/TUV/ASME/EN |
Place of Origin | Zhangjiagang,Jiangsu,China |
View Detail Information
Explore similar products
Condensing Gas Boiler Water Wall Panels , Boiler Membrane Wall Tube
High Pressure CFB Boiler Water Wall Panels Water Tube ASME with Certification
Environment Friendly Boiler Water Walls Customization Corrosion Resistance
Biomass Boiler Water Wall Panels Anti Corrosion For Metallurgical Industry
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 500Ton/Tons per Month |
Delivery Time | 50~100 Days | Packaging Details | Iron Frame Package |
Name | Boiler Water Wall Panels | Structure | Fire/Water Tube |
Pressure | High/Low Pressure | Fuel | Coal/Gas/Oil-fired, Water Heat |
Output | Hot Water/Steam | Dimension(L*W*H) | Customization |
Brand Name | ORL Power | Model Number | Customization |
Certification | ISO9001/SGS/TUV/ASME/EN | Place of Origin | Zhangjiagang,Jiangsu,China |
High Light | Boiler water bubble wall panel ,steel boiler water wall ,ISO boiler water wall panels |
Boiler Water Wall Panels
Boiler Water Wall Panels Introduction
A waterwall in a boiler is any furnace wall that is comprised of refractory and tubes in a water-tube boiler. The tubes are evenly spaced and generally connect to headers which in turn are connected back to the main generating bank of the boiler. They serve a two fold purpose here in that they capture heat that would otherwise escape to the atmosphere and help heat the water in the boiler. And they also help keep the refractory cool .This prevents spalling of the refractory.
Boiler Water Wall Panels Parameters
Name | Boiler Water Wall Panels |
Material | Carbon steel,Alloy steel,etc. |
Tube size | Φ38 - 76 mm, Customization |
Standard | ISO , ASME |
Model | Studded |
Dimension | Customization |
Manufacturing process | Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Polishing→Tube joint welding→Assembly →Welding →Inspection→Heat treatment→Hydraulic pressure test→Painting→ Packaging |
Installation location | around the boiler combustion chamber |
Boiler Parts
Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater
FAQ
1. Why choose us?
We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.
We ensure the deliver time, high quality, and the best after-sale service for you.
2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Total Annual:
$5000000-$10000000
Employee Number:
500~600
Ecer Certification:
Active Member
Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province. ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin ... Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province. ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin ...
Get in touch with us
Leave a Message, we will call you back quickly!