| Packaging Details | By Pallet or As Request |
| Supply Ability | 1500-2000 |
| Wall Panel | 50mm/75mm Fireproof Mineral Rockwool Sandwich Panel |
| Payment Terms | L/C,T/T |
| Delivery Time | 25-45 Days |
| Floor Board | 18mm Fiber Cement Board |
| Roof Insulation | Fiber Glass With Aluminum Foil |
| Certification | ISO;CE |
| Model Number | YGDD03 |
| Brand Name | YAGO INDUSTRY |
| Place of Origin | China |
View Detail Information
Explore similar products
Fast Assembly Construction Site Camp Flat Pack Container Sleeping Units
Double Floor Building Site Temporary Mining Camp Shipping Container Welfare Unit
Waterproof Modular Construction Site Camp Offices Heat Insulated Staff Living
Prefabricated Temporary Construction Site Office Temporary Container Labour
Product Specification
| Packaging Details | By Pallet or As Request | Supply Ability | 1500-2000 |
| Wall Panel | 50mm/75mm Fireproof Mineral Rockwool Sandwich Panel | Payment Terms | L/C,T/T |
| Delivery Time | 25-45 Days | Floor Board | 18mm Fiber Cement Board |
| Roof Insulation | Fiber Glass With Aluminum Foil | Certification | ISO;CE |
| Model Number | YGDD03 | Brand Name | YAGO INDUSTRY |
| Place of Origin | China | ||
| High Light | High Strength Construction Site Camp ,Eco Friendly Modular Housing ,Flat-Pack Folding Structure Temporary Field Building | ||
High Strength Eco Friendly Construction Site Camp Modular Housing for Mining Worker Office Dormitory
This high‑performance Construction Site Camp adopts galvanized light steel framework and high‑grade PU insulation sandwich panels. Every modular housing unit is fully outfitted inside factory with doors, windows, flooring and complete pre‑wired electrical systems. Featuring flat‑pack folding structure, it reduces logistics burden for cross‑border shipment. Multiple units can be combined horizontally or stacked into double‑layer arrangement to build integrated mining worker office and dormitory compound. This Construction Site Camp delivers stable durability for long‑term remote field operation.
Our High Strength Eco Friendly Construction Site Camp Modular Housing is manufactured in YAGO’s automated production facility and complies with international field building standards. The Construction Site Camp uses heavy‑duty galvanized light‑steel frame with powder‑coated finishing, delivering strong anti‑rust performance to extend service life under outdoor open‑air conditions. Wall and roof sections adopt 75mm PU sandwich panels, granting the Construction Site Camp reliable thermal insulation, sound insulation and weather‑proof performance.
Each module of this Construction Site Camp is pre‑completed before shipment. Reinforced security door, anti‑theft PVC windows with insect screen and heavy‑duty vinyl floor covering are all pre‑installed. Complete pre‑routed electrical circuits including lighting sockets, air‑condition reserved circuits and leakage‑proof distribution box are embedded inside each unit. After on‑site assembly of the Construction Site Camp, users only need simple power connection, without complex secondary decoration work.
Modular design supports flexible scaling of the Construction Site Camp. Individual housing units can be freely spliced side‑by‑side or stacked up to two floors. External staircases and connecting walkways can be equipped as required to separate office working zones and worker dormitory rest zones. The flat‑pack packaging optimizes container loading efficiency, greatly lowering ocean transportation expenditure for bulk orders of the Construction Site Camp. Most materials of this eco‑friendly Construction Site Camp can be recycled. When one project finishes, the whole camp can be fully disassembled, transported and reassembled at another project location to help clients save repeated capital investment.
| Project name: 20ft container with side bathroom -- 6055mm*2435mm*2895mm | ||||||
| A | Standard Configuration | Specification | ||||
| Steel Structure System | ||||||
| 1 | Roof structure | set | 1.00 | Main roof frame: 2.3mm Q235 galvanized Steel profile, with Automatic Powder Coated paint Roof purlin: C Section Steel, galvanized. Q235B steel | ||
| 2 | Floor structure | set | 1.00 | Main floor frame:2.3mm Q235 galvanized Steel profile,with Automatic Powder Coated paint Floor purlin:C Section Steel, galvanized. Q235B steel | ||
| 3 | Corner pillar | pcs | 4.00 | 2.3mm Q235 galvanized Steel profile, Galvanized with Automatic Powder Coated paint | ||
| Container roof System | ||||||
| 1 | Roof covering | set | 1.00 | 0.4mm Galvanized Powder Coated color painting steel Sheet. | ||
| 2 | Insulation | set | 1.00 | 75mm thickness Fiber glass with aluminum foil | ||
| 3 | Ceiling board | set | 1.00 | 0.35mm Galvanized Powder Coated color painting steel Sheet. | ||
| Container floor System | ||||||
| 1 | PVC flooring | set | 1.00 | 2mm thickness Vinly floor leather with glue | ||
| 2 | Floor board | set | 0.00 | 18mm fiber cement board | ||
| 3 | Floor Bottom Cover | set | 1.00 | Pu plastic tile | ||
| ContainerWall System | ||||||
| 1 | Wall panel | set | 1.00 | 50mm Rockwool sandwich panel with 0.33mm Galvanized Powder Coated color painting steel Sheet. on both sides(white color) | ||
| 2 | Door | set | 2.00 | Insulated Steel Door. (W850*H2030mm) | ||
| 3 | Window | set | 3.00 | PVC sliding window, double glass, with fly screen and security Net (W800*H1100mm) | ||
| Container Electrical System | ||||||
| 1 | Power distribution cabinet | set | 1.00 | circuit with air-break switch, leakage protector (Main power supply cable 6m2 For industrial Socket, 1.5mm2 for lighting, 2.5mm2 for common sockets, 4mm2 for AC socket.) | ||
| 2 | Light | set | 2.00 | LED light, 24W | ||
| 3 | AC &Water heater Socket | set | 2.00 | 16A universal, with socket box | ||
| 4 | Common Socket | set | 3.00 | 10A, Universal type, with socket box | ||
| 5 | Switch | set | 2.00 | 10A , with switch box | ||
| Container Accessories | ||||||
| 1 | Side Flashing | set | 1.00 | 2 Pcs Length=5635mm, galvanized, 2pcs Length=2690mm, galvanized | ||
| 2 | Rainspout pipe | set | 1.00 | Dia. 50mm, UPVC, Length=2650mm | ||
| 3 | Pillar trim plate | set | 1.00 | Length=2520mm, 0.3mm color steel plate(with fittings & accessories) | ||
| 4 | Ceiling trim plate | set | 1.00 | Length=5640mm/2630mm, 0.3mm color steel plate(with fittings & accessories) | ||
| Plumbing system | ||||||
| 1 | washbasin | set | 1.00 | including the accessory | ||
| 2 | Closetool | set | 1.00 | including the accessory | ||
| 3 | shower | set | 1.00 | shower base, shower head, water mixture | ||
| 4 | Exhaust Fan | set | 1.00 | 6 Inch | ||
| 5 | water pipe | set | 1.00 | input and output water pipe | ||
| Additional Traingle Roof on Top of Each Block (Optional as per drawing) | ||||||
| 1 | Roof Structure | set | 1.00 | Fabricated with C section steel, Galvanized Q235 Steel. | ||
| 2 | Roof Covering | set | 1.00 | 0.4mm Corrugated Galvanized Powder Coated Roof Tile | ||
![]()
![]()
Q1: What is the expected service lifespan for this Construction Site Camp under outdoor mining‑site environment? A1: With normal maintenance, the galvanized‑steel‑framed Construction Site Camp can serve 8‑12 years for outdoor field projects. Regular surface cleaning can further extend its service life.
Q2: Can we add separate kitchen or toilet modules into this Construction Site Camp compound? A2: Yes. We can match compatible modular kitchen and toilet units, which can be combined together with standard office and dormitory modules to form a complete Construction Site Camp.
Q3: Does this Construction Site Camp need special foundation treatment before installation? A3: Leveled compacted ground or simple concrete foundation is sufficient. It does not require complex deep foundation, which saves your site civil‑work cost.
Q4: What preparation work should we finish on‑site before receiving goods of the Construction Site Camp? A4: You need to level the ground, reserve power access point and reserve enough space for module unloading and assembly. We will provide detailed site preparation guidance document for reference.
Q5: If our project manpower grows halfway, can we expand the scale of existing Construction Site Camp? A5: Definitely. Thanks to modular feature, you can purchase extra individual housing units later, splice or stack them to your existing Construction Site Camp compound to increase accommodation and office capacity.
Company Details
Business Type:
Manufacturer
Year Established:
2018
Total Annual:
5000000-10000000
Employee Number:
150~305
Ecer Certification:
Verified Supplier
YAGO Industry is leading manufacture in China for Prefabricated building, Container building and Pre-engineered Steel structure Building. We have full engineer team and fabrication team to support your project from design, engineering, fabrication and site installation support. We are glad... YAGO Industry is leading manufacture in China for Prefabricated building, Container building and Pre-engineered Steel structure Building. We have full engineer team and fabrication team to support your project from design, engineering, fabrication and site installation support. We are glad...
Get in touch with us
Leave a Message, we will call you back quickly!