Payment Terms | L/C, T/T |
Supply Ability | 100,000 Meters Per Month |
Delivery Time | 7-10 Days After Received Your Payment |
Packaging Details | All Steel Members Are Put Into One Steel Holder |
Length: | Customized |
Thickness: | 0.8mm - 1.5mm |
Color: | Original Galvanized |
Material | Q235B, Q345B,G550 |
Type | Corrugation |
Zinc Thickness: | Above AZ60g / m2 |
Connection: | Shear Studs |
Width | 880/970mm |
Usage | hold rebar and cement |
Load method | By 20GP,40GP |
Brand Name | SPDAR , Hongfa |
Certification | ISO9001:2015 |
Place of Origin | Guangdong Of China |
Model Number | 880# |
View Detail Information
Explore similar products
Green Corrugated Anti Rust Steel Roofing Sheets 0.2mm 0.4mm 0.6mm Thickness
Bottom 5U 7U 0.2mm Thickness Steel Roofing Sheets
Mezzanine Office 880mm Galvanized Steel Decking Sheet
Anti - Lock Steel Roofing Sheets 760# For Warehouse High Strength And Long Span
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 100,000 Meters Per Month |
Delivery Time | 7-10 Days After Received Your Payment | Packaging Details | All Steel Members Are Put Into One Steel Holder |
Length: | Customized | Thickness: | 0.8mm - 1.5mm |
Color: | Original Galvanized | Material | Q235B, Q345B,G550 |
Type | Corrugation | Zinc Thickness: | Above AZ60g / m2 |
Connection: | Shear Studs | Width | 880/970mm |
Usage | hold rebar and cement | Load method | By 20GP,40GP |
Brand Name | SPDAR , Hongfa | Certification | ISO9001:2015 |
Place of Origin | Guangdong Of China | Model Number | 880# |
High Light | garage roof sheets ,galvanised roofing sheets |
Galvanized Corrugated Steel Roofing Sheets / Floor Deck For Muti - Floor Buildings
Description:
Quick to fabricate
Various specification and models
Low cost and maintenance
Long using time over 10 years
Lighter weight
Applicable to a humid climate and the harsh corrosive environment
Easy installation and cut
High strength and long span
Nice appearance and Anti-rust
Environment friendly and Recyclable
20'ft | |
Length Per Piece | 5800mm |
Total Meters For Ref. | 6000Meters |
40HQ | |
Length Per Piece | 11850mm |
Total Meters For Ref. | 6000Meters |
Usage: Floor Decking for Severl Floors
Welcome to contact with us, if you have high builidings need to set up.
Client | Tel/Fax: | E-mail: | ||||||
Building Basic Information | ||||||||
Project: | Project No.: | |||||||
Location | Building Usage | Total area | ||||||
Length (m) | Width (m) | Eave Height (m) | ||||||
Roof material | ||||||||
Wall material | ||||||||
Design Load and Meteorological Conditions | ||||||||
Wind load (kn/m2) | Wind speed (m/sec) | Snow load (kn/m2) | ||||||
Rainfall Capacity | Earthquake Grade | |||||||
Please fill out the below information if your building has the mezzanine | ||||||||
Height of Mezzanine(m) | Usage of mezzanine | |||||||
Live load on mezzanine(kn/m2) |
Attached some sample projects.
Finished Project List | ||||||
No. | Time | Project Name | Project Area-㎡ | Quantity | Unit | Project site |
1 | 2010.1 | Thailand ACG Company- JIB WIT factory | 1500㎡ | 50 | Ton | Thailand |
2 | 2010.09 | Thailand ACG Company- I Property factory | 10000㎡ | 300 | Ton | Thailand |
3 | 2011.3 | Thailand ACG Company- JIB WIT II factory | 14000㎡ | 420 | Ton | Thailand |
4 | 2013.9 | Thailand ACG Company- CHAZE Thailand factory | 22000㎡ | 660 | Ton | Thailand |
5 | 2014.6 | Thailand ACG Company-Galaxy project | 5500㎡ | 163 | Ton | Thailand |
6 | 2015.10~2016.12 | Thailand ACG Company-Sharp project | 35000㎡ | 1150 | Ton | Thailand |
7 | 2010.11 | Bostwana JGM company- warehouse Bostwana | 1500㎡ | 50 | Ton | Bostwana |
8 | 2015.06 | Algeria workshop B project | 2000㎡ | 70 | Ton | Algeria |
9 | 2013.1 | 2013.1 Angola- Cateen 120 MT Angola | 3200㎡ | 120 | Ton | Angola |
10 | 2013.03 | Angola Fruit Juice factory project | 3000㎡ | 100 | Ton | Angola |
11 | 2009.1 | ABS Company Australia Factory Australia | 2600㎡ | 82 | Ton | Australia |
12 | 2010.5 | LEX EWIRD SERVICE WORKSHOP Australia | 1500㎡ | 50 | Ton | Australia |
13 | 2010.11 | SYDENY GOOD LUCK SUPPER Australia | 3000㎡ | 100 | Ton | Australia |
14 | 2010.12 | Melbourne SOUTH PACIFIC Australia NOMINEE PTY LTD- Roof truss | 3500㎡ | 80 | Ton | Australia |
15 | 2011.1 | JEDI- WAREHOUSE Australia | 5000㎡ | 160 | Ton | Australia |
16 | 2012.11 | John Beck -WAREHOUSE 60 MT Australia | 1200㎡ | 60 | Ton | Australia |
17 | 2014.8 | Australian Portable Camps-Roof Truss | 1000㎡ | 40 | Ton | Australia |
18 | 2016.07 | 3 floors shoes Workshop | 25122㎡ | 550 | Ton | Bangladesh |
19 | 2015.06 | Mine plant | 4350㎡ | 150 | Ton | Brazil |
20 | 2011.8 | Inmec Consortium SDN BHD- Brunei petroleum school building | 3200㎡ | 100 | Ton | Brunei |
21 | 2012.8 | ROSANA JAYA ENTERPRIS- Brunei warehouse | 3000㎡ | 100 | Ton | Brunei |
22 | 2016.11 | 20000sqm Workshop | 20000㎡ | 450 | Ton | Cambodia |
23 | 2016.07 | Workshop | 8000㎡ | 200 | Ton | Cambodia |
24 | 2011.3 | Petricio Industrial S.A.-BOX BEAM CHILE | 800㎡ | 52 | Ton | CHILE |
25 | 2009.7 | Jordan CECHNO Engineering Egypt Company-- Egypt Cement Pre-heat Tower Platform | 4500㎡ | 250 | Ton | Egypt |
26 | 2015.06 | Workshop | 5000㎡ | 160 | Ton | Hongkong |
27 | 2016.03 | Workshop | 2100㎡ | 70 | Ton | Indonesia |
28 | 2008.11 | Kosovo Benzi ShowRoom | 6600㎡ | 330 | Ton | Kosovo |
29 | 2016.07 | Workshop Crane beam | 1000㎡ | 30 | Ton | Laos |
30 | 2012.6 | Maldives WAREHOUSE | 800㎡ | 60 | Ton | Maldives |
31 | 2016.04 | Gymnasium | 800㎡ | 60 | Ton | Maldives |
32 | 2016.05 | 2 sets 4-floor warehouse | 2000㎡ | 130 | Ton | Maldives |
33 | 2014.12 | MEXICO BOXITO Building Material Supermarket | 5500㎡ | 160 | Ton | Mexico |
34 | 2018.09 | MEXICO -GOLDUNION COMPANY- PARA WAEHOUSE | 8750㎡ | 350 | Ton | Mexico |
35 | 2016.10 | The Heritage Yangon Myanmar | 1944㎡ | 130 | Ton | Myanmar |
36 | 2014.05~2016.04 | Myanamar Brainworks School- | 5000㎡ | 400 | Ton | Myanmar |
37 | 2011.11~2012.5 | NigeriaVIJU- MILK FACTORIES Phase I (60000sqm) | 60000㎡ | 2200 | Ton | Nigeria |
38 | 2015.3-2015-10 | Nigeria VIJU- MILK FACTORIES Phase I I(73800sqm) | 73800㎡ | 2600 | Ton | Nigeria |
39 | 2014.08 | Peru workshop project | 3300㎡ | 100 | Ton | Peru |
40 | 2013.7 | Philippines- Warehosue 330 MT Philippines | 11780㎡ | 330 | Ton | Philippines |
41 | 2014.11 | Philippines- Warehosue | 8000㎡ | 200 | Ton | Philippines |
42 | 2015.5 | Philippines- Warehosue 220 MT Philippines | 7350㎡ | 220 | Ton | Philippines |
43 | 2016.3-2017-3 | Philippines- Warehosue | 3200㎡ | 100 | Ton | Philippines |
44 | 2016.04-12 | Philippines- Warehosue | 4000㎡ | 120 | Ton | Philippines |
45 | 2017-2018 | Philippines-Foton Motor Philippines Inc. Truck factories & 4S shop | 15000㎡ | 680 | Ton | Philippines |
46 | 2012.8 | LOYAL BLOOM LIMITED- warhouse PNG | 7000㎡ | 280 | Ton | PNG |
47 | 2018.8 | LOYAL BLOOM LIMITED- warhouse PNG | 2250㎡ | 90 | Ton | PNG |
48 | 2011.4 | Rwanda Master Steel Limited- STEEL FACTORY | 4500㎡ | 200 | Ton | Rwanda |
49 | 2013.1 | MASTER STEEL -warehouse | 3500㎡ | 140 | Ton | Rwanda |
50 | 2017.04 | MASTER STEEL -Plastic Workshop | 5000㎡ | 200 | Ton | Rwanda |
51 | 2009.1 | Well& Able Company- Labor's Dormitory Room 3#-4 floor | 3250㎡ | 230 | Ton | Singapore |
52 | 2009.1 | Well& Able Company- Labor's Dormitory Room 2#-4 floor- | 2800㎡ | 170 | Ton | Singapore |
53 | 2009.5 | Well& Able Company- Labor's Singapore Dormitory Room 8#- 4 floorS | 3000㎡ | 223 | Ton | Singapore |
54 | 2009.7 | Well & Able Compay- Ship workshop Singapore | 2100㎡ | 104 | Ton | Singapore |
55 | 2009.9 | Well & Able Company --HWA Chong Singapore School -2# Building | 3000㎡ | 195 | Ton | Singapore |
56 | 2009.12 | Well& Able Company- Labor's Singapore Dormitory Room 9#-4 floor 60 MT | 1000㎡ | 60 | Ton | Singapore |
57 | 2014.12 | Singapore Well & Able WA-1489 office building | 18750㎡ | 1500 | Ton | Singapore |
58 | 2011.8 | Venezuela Density International 2024,C.A.- 4 floor office building Density International 2024,C.A. | 6500㎡ | 450 | Ton | Venezuela |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1993
Total Annual:
>100,000,000
Employee Number:
>1000
Ecer Certification:
Active Member
Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen... Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen...
Get in touch with us
Leave a Message, we will call you back quickly!