China factories

Chat Now Send Email
China factory - TOBO STEEL GROUP CHINA

TOBO STEEL GROUP CHINA

  • China,Shanghai ,Shanghai
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Carbon Steel ASTM B16.5 Orifice Flange A105 CL300 WN RF Flange
China Carbon Steel ASTM B16.5 Orifice Flange A105 CL300 WN RF Flange

  1. China Carbon Steel ASTM B16.5 Orifice Flange A105 CL300 WN RF Flange
  2. China Carbon Steel ASTM B16.5 Orifice Flange A105 CL300 WN RF Flange
  3. China Carbon Steel ASTM B16.5 Orifice Flange A105 CL300 WN RF Flange
  4. China Carbon Steel ASTM B16.5 Orifice Flange A105 CL300 WN RF Flange
  5. China Carbon Steel ASTM B16.5 Orifice Flange A105 CL300 WN RF Flange

Carbon Steel ASTM B16.5 Orifice Flange A105 CL300 WN RF Flange

  1. MOQ: 1pc
  2. Price: US $ 10 - 100 / Kilogram
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union
Supply Ability 50 Metric Ton/Metric Tons per Month
Delivery Time 30 days After Receiving the 30% Prepayment by T/T or LC
Packaging Details Seaworthy wooden cases or pallets tied by steel band or as per client's requirements
Type Flange/Forgings/Discs/Rings/Shaft/Sleeves
Standard ANSI B16.5, ANSI B16.47, MSS SP-44 or as per the customers' request or drawing
Size 1/2''~72''
Class Rating 150#~2500#
Facing RF(raised face);FF(flat face);RTJ(ring type joint);RJ(ring joint face) TG(tongue and groove face);MFM(male and female face)
Manufacturing process Push, Press, Forge, Cast, etc.
Packing Wooden cases, pallets, nylon bags or according to the customers' requirements
MOQ 1pcs
Delivery time 10-100 days depending on quantity
Payment terms L/C,T/T
Shipment FOB Tianjin/Shanghai, CFR, CIF etc
Application Petroleum/Power/Chemical/Construction/Gas/Metallurgy/Shipbuilding etc
Remarks Other materials and drawings are available.
Brand Name TOBO
Model Number A105
Certification SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union Supply Ability 50 Metric Ton/Metric Tons per Month
Delivery Time 30 days After Receiving the 30% Prepayment by T/T or LC Packaging Details Seaworthy wooden cases or pallets tied by steel band or as per client's requirements
Type Flange/Forgings/Discs/Rings/Shaft/Sleeves Standard ANSI B16.5, ANSI B16.47, MSS SP-44 or as per the customers' request or drawing
Size 1/2''~72'' Class Rating 150#~2500#
Facing RF(raised face);FF(flat face);RTJ(ring type joint);RJ(ring joint face) TG(tongue and groove face);MFM(male and female face) Manufacturing process Push, Press, Forge, Cast, etc.
Packing Wooden cases, pallets, nylon bags or according to the customers' requirements MOQ 1pcs
Delivery time 10-100 days depending on quantity Payment terms L/C,T/T
Shipment FOB Tianjin/Shanghai, CFR, CIF etc Application Petroleum/Power/Chemical/Construction/Gas/Metallurgy/Shipbuilding etc
Remarks Other materials and drawings are available. Brand Name TOBO
Model Number A105 Certification SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED
Place of Origin China
High Light forgings flanges and fittingsbutt weld flanges

Carbon steel ASTM B16.5 Orifice Flange A105 CL300 WN rf flange

Quick Details

Specifications

Size:

1/2''-48''

Material:

Carbon Steel

Standard:

ANSI

Place of Origin:

Hebei, China (Mainland)

Model Number:

Welding Neck

Brand Name:

TOBO

Standard or Nonstandard:

Standard

Name:

Carbon steel ASTM B16.36 Orifice Flange

Application:

Petroleum,Chemical etc

Wall thickness:

Sch5s-Sch160,XS,XXS,STD
Packaging & Delivery

Packaging Details:

In wooden cases or pallet or as per customer's requirement

Delivery Detail:

7-20 Days or as per customer's requirement

Product Orifice Flange
Size rang 1/2''-48''
Wall thickness Sch5s-Sch160, XS, XXS,STD
Material Carbon Steel
Surface treatment Black/Galvanized or according to requirement.
Packing Seaworthy package, Plywood or Pallet or as for per customer's requirements.
Payment L/C, T/T or according to the customers' requirements.
Delivery Time 7-20 days or according to the customers' requirements.
Standard AMSE B16.9, ASME B16.28, GB, JIS, DIN,ANSI, etc.
Certification ISO9001:2000, ISO90001:2008,ISO/TS16949
Application rang

Petroleum,Chemical,Election Power,Oil&Gas,

Shipbuilding,Water-treatment,etc.

The third party inspection SGS and other party alloyed by clients.
Others

1.Special design available according to customers' requirements.

2.Anti-corrosion and high temperature resistant with black painting.

3.All the production process are made under ISO9001:2000 strictly.

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Agent,Importer,Exporter,Trading Company,Seller

  • Year Established:

    1998

  • Total Annual:

    100000-100000000

  • Employee Number:

    200~300

  • Ecer Certification:

    Verified Supplier

     TOBO GROUP sales head offce in Shanghai.         We are one of the Professional manufacturers Exporter  Pipeline products  in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ...      TOBO GROUP sales head offce in Shanghai.         We are one of the Professional manufacturers Exporter  Pipeline products  in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ...

+ Read More

Get in touch with us

  • Reach Us
  • TOBO STEEL GROUP CHINA
  • 2F,Building7,Baolong Center,No.689,Xiwang Road,Jiading District,Shanghai,201800,China
  • https://www.buttweldingfitting.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement