China factories

China factory - TOBO STEEL GROUP CHINA

TOBO STEEL GROUP CHINA

  • China,Shanghai ,Shanghai
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China ASTM Seamless Polished Welded A106 Carbon Steel Schedule 40 Tubing Pipe
China ASTM Seamless Polished Welded A106 Carbon Steel Schedule 40 Tubing Pipe

  1. China ASTM Seamless Polished Welded A106 Carbon Steel Schedule 40 Tubing Pipe

ASTM Seamless Polished Welded A106 Carbon Steel Schedule 40 Tubing Pipe

  1. MOQ: 100KG
  2. Price: USD Depending on quantity
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union
Supply Ability 500 tons per month
Delivery Time 10-90 work days
Packaging Details PLY-WOODEN CASE OR PALLET
Product name ASTM Seamless Polished Welded A106 Carbon Steel Schedule 40 Tubing Pipe
Type Seamless/Welded
Material ss 201/304/316
Technique Efw, Hot Rolled, Hot rolled, Welded, Galvanized
Surface Polishing or Unpolishing
Thickness 0.01mm-4mm
Processing Service Welding, Cutting
Standard DIN, ASTM, JIS, DIN 1626, ASTM A106-2006, JIS G3463-2006
Application Chemical Industry, Construction, Building
Brand Name TOBO/TPCO/TISCO/VALIN/METAL
Model Number Duplex Stainless Steel Pipe
Certification ISO/PED/TUV/SGS/LR/BV
Place of Origin China/Japan/Germany

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union Supply Ability 500 tons per month
Delivery Time 10-90 work days Packaging Details PLY-WOODEN CASE OR PALLET
Product name ASTM Seamless Polished Welded A106 Carbon Steel Schedule 40 Tubing Pipe Type Seamless/Welded
Material ss 201/304/316 Technique Efw, Hot Rolled, Hot rolled, Welded, Galvanized
Surface Polishing or Unpolishing Thickness 0.01mm-4mm
Processing Service Welding, Cutting Standard DIN, ASTM, JIS, DIN 1626, ASTM A106-2006, JIS G3463-2006
Application Chemical Industry, Construction, Building Brand Name TOBO/TPCO/TISCO/VALIN/METAL
Model Number Duplex Stainless Steel Pipe Certification ISO/PED/TUV/SGS/LR/BV
Place of Origin China/Japan/Germany
High Light Schedule 40 Seamless Steel TubingPolished Welded Seamless Steel TubingASTM A106 Seamless Steel Tubing

ASTM Seamless Polished Welded A106 Carbon Steel Schedule 40 Tubing Pipe

Product Specification:

1. Material: Stainless Steel Pipe S31803/S31500/S32750 ETC
2. O.D: 6mm-710mm , Thickness:2.5-50mm

3. A999/A999M: Each pipe shall be subjected to the nondestructive electric test or the hydrostatic test, the Thpe of test to be used shall be at the option of the mfg, unless otherwise specified in the PO.

4. The Pipe lengths : Unless otherwise agreed upon, all size from NPS 1/8” TO AND INCLUDING nps 8 are available in a length up to 24ft with the permitted range of 15 to 24 ft. Short length are acceptable and the number and min, length shall be agreed upon between mfg and purchaser.

5. The finished pipe shall be reasonably straight and shall have workmanlike finish, Removal of imperfections by grinding is permitted, provided the W.T are not decreased to the lenss than the permitted in Section 9 of Specification A999/A999M

6. Butt Weld End: According to ANSI B 16.25
7. Pipe Marking: Specified in A999/999M, include “Logo+Standard+SIZE+Heat No.+Lot No.+H.T/E.T/U.T”

8. Packing: Each Pipe end is protected by Plastic cap. Then packed by Anti-rust steel strip, The outside of the bundle is plastic woven bag, or Plastic film.

9. Packing Mark: SIZE + STEEL GRADE+ QTY OF PIECE/WEIGHT/METRE.

10. MTC: TOBO Official Original MTC paper will be supplied for each order.

 

Standard ASTM B165 , ASTM B163 , ASTM B829 , ASTM B775 ,ASTM B725 ,ASTM B730 , ASTM B751,ASTM B 444, ASME SB444,
Size 1/2’’~48’’(Seamless);16’’~72’’(Welded)
Wall thickness SCH10, SCH20, SCH30, STD, SCH40, SCH60, SCH80, SCH100 SCH120, SCH160, XS, XXS
Manufacturing process Push, Press, Forge, Cast, etc.
Material Carbon steel, stainless steel, alloy steel, duplex stainless, nickel alloy steel
Applications field

This type pipe fittings be widely used in kinds of industries:

a. Paper Making,Waste-water Treatment

b. Chemical Industry and Natural Gas

c. Shipbuilding

d. Electrical equipment

e. Nuclear Energy

f. Construction

g. Petroleum

 

2 (2)-600x600-0.jpg

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Application:
a) For fluid & gas transport
b) Structure & machining etc


Advantages:
a) Advanced technology of cold draw machine
b) Advanced annealing machine
c) Better mechanical property
d) More precise dimension
e) Perfect inspection method and inspection equipment etc

 

 

 

 

Advantages:
a) Advanced technology of cold draw machine

b) Advanced annealing machine

 

c) Better mechanical property
d) More precise dimension
e) Perfect inspection method and inspection equipment etc

 

Packaging & Shipping:

Package:Standard export carton packing.

Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity.

 

1.png

 

FAQ:

1. Are you trading company or manufacturer ?

We are manufacturer with over years experiences.

2. How long is your delivery time?

Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

3. Do you provide samples ? is it free or extra ?

Yes, we could offer the sample for free charge but need pay the cost of freight.

4. What is your terms of payment ?

Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.

 
 
 
 
 
 
 
 
 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Agent,Importer,Exporter,Trading Company,Seller

  • Year Established:

    1998

  • Total Annual:

    100000-100000000

  • Employee Number:

    200~300

  • Ecer Certification:

    Verified Supplier

     TOBO GROUP sales head offce in Shanghai.         We are one of the Professional manufacturers Exporter  Pipeline products  in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ...      TOBO GROUP sales head offce in Shanghai.         We are one of the Professional manufacturers Exporter  Pipeline products  in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ...

+ Read More

Get in touch with us

  • Reach Us
  • TOBO STEEL GROUP CHINA
  • 2F,Building7,Baolong Center,No.689,Xiwang Road,Jiading District,Shanghai,201800,China
  • MrJoy Wang
  • 0086-21-31261985
  • https://www.buttweldingfitting.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement