| Cusomized Support | OEM |
| Payment Terms | T/T,Western Union |
| Color | 3000 PSI |
| Wall Thickness | Sch5S-Sch160, XS,XXS |
| Chemical Composition | Ni MIn63%,Cu 28%-34%,Fe Max2.5% |
| Supply Ability | 10Ton/Month |
| Surface Treatment | Solid solution |
| Pressure Rating | 3000LBS, 6000LBS, 9000LBS |
| Delivery Time | 15-30 Workdays |
| Class | 1500#, 2500# , 3000#, 6000#, 9000# |
| Deliver Time | 15Days |
| Packaging Details | Standard Shipping Package |
| Standardscompliance | ASME B16.11, ASTM A105, ASTM A182 |
| Packaging Type | Wooden Case |
| Business Type | Manufacturer |
| Model Number | Butt Welding Fitting |
| Brand Name | TOBO |
| Certification | ISO/TUV/SGS |
| Place of Origin | Shanghai,China |
View Detail Information
Explore similar products
Copper Nickel 70/30 CuNi Seamless Pipe Fitting ISO API CCS Approval
Steel Forged Fittings ASTM A694 F56 , Elbow , Tee , Reducer ,SW, 3000LB,6000LB
Hexagonal Bushing Forged Pipe Fittings 2” x ¾” 3000 / 6000 PSI NPT A105
Steel Forged Fittings ASTM A694 F60 , Elbow , Tee , Reducer ,SW, 3000LB,6000LB
Product Specification
| Cusomized Support | OEM | Payment Terms | T/T,Western Union |
| Color | 3000 PSI | Wall Thickness | Sch5S-Sch160, XS,XXS |
| Chemical Composition | Ni MIn63%,Cu 28%-34%,Fe Max2.5% | Supply Ability | 10Ton/Month |
| Surface Treatment | Solid solution | Pressure Rating | 3000LBS, 6000LBS, 9000LBS |
| Delivery Time | 15-30 Workdays | Class | 1500#, 2500# , 3000#, 6000#, 9000# |
| Deliver Time | 15Days | Packaging Details | Standard Shipping Package |
| Standardscompliance | ASME B16.11, ASTM A105, ASTM A182 | Packaging Type | Wooden Case |
| Business Type | Manufacturer | Model Number | Butt Welding Fitting |
| Brand Name | TOBO | Certification | ISO/TUV/SGS |
| Place of Origin | Shanghai,China | ||
| High Light | Duplex stainless steel pipe fittings ,ASTM A815 forged pipe union ,ASME B16.11 pipe fittings | ||
This product is a forged pipe fitting union manufactured from UNS S31803 (Duplex 2205 / F51) stainless steel in accordance with ASME B16.11 standards. The union is a three-piece threaded fitting consisting of a female threaded end, a male threaded end, and a central nut that secures the two halves together. UNS S31803 is a dual-phase stainless steel with a microstructure of approximately 50% austenite and 50% ferrite, offering roughly double the yield strength of standard 300-series austenitic stainless steels while providing excellent corrosion resistance. As a forged fitting, it is produced by shaping solid steel billets under high pressure, resulting in a tighter grain structure and superior performance under pressure and thermal cycling.
| Parameter | Details / Range |
|---|---|
| Material Standard | ASTM A815 / ASME SA815 |
| Dimensional Standard | ASME B16.11, MSS SP-83 |
| Material Grade | UNS S31803 (Duplex 2205 / F51) |
| Type | Threaded Union (Three-piece: female end, male end, center nut) |
| Size Range | 1/8" – 4" NB |
| Pressure Classes | 2000#, 3000#, 6000#, 9000# |
| Thread Type | NPT (ASME B1.20.1), BSPT, BSPP |
| Chemical Composition | Cr: 21.0-23.0%, Ni: 4.5-6.5%, Mo: 2.5-3.5%, N: 0.08-0.20%, Fe: Balance |
| Tensile Strength (min) | 620-800 MPa (90-116 ksi) |
| Yield Strength 0.2% (min) | 450-550 MPa (65-80 ksi) |
| Elongation (min) | 25% |
| Density | 7.8 g/cm³ |
| PREN Value | ~34-36 |
| Heat Treatment | Solution annealing at 1020-1100°C |
This union is ideal for demanding corrosive and high-pressure environments:
Oil & Gas: Offshore platforms, subsea piping, high-pressure process lines, wellhead connections
Chemical Processing: Chloride-containing acids, brine services, heat exchangers
Marine Engineering: Seawater piping systems, desalination plants
Power Generation: Cooling water systems, high-temperature service
Pulp and Paper: Bleaching lines, digester systems
Superior Strength: Yield strength is approximately double that of standard 300-series austenitic stainless steels (316/316L)
Excellent Corrosion Resistance: PREN ~34-36 provides outstanding resistance to pitting, crevice corrosion, and chloride stress corrosion cracking
Easy Disassembly: Three-piece union design allows for quick connection and disconnection of piping systems without rotating pipes
Cost-Effective: Lower nickel content compared to austenitic grades offers significant material cost savings
Good Weldability: Compatible with standard welding procedures; solution annealing recommended post-weld
Forged Integrity: Tighter grain structure than cast fittings; superior performance under pressure and vibration
The threaded union provides a reliable, leak-proof mechanical connection between two sections of pipe, enabling quick assembly and disassembly for maintenance, inspection, or component replacement. The three-piece design (two threaded ends and a center nut) allows the piping system to be separated without rotating the connected pipes, making it ideal for systems requiring frequent maintenance.
Preparation: Clean pipe threads and fitting threads thoroughly; remove all dirt, oil, and debris
Thread Sealant: Apply PTFE tape or pipe dope to male threads to ensure a reliable seal
Thread Engagement: Screw the union halves onto the respective pipe ends by hand, then tighten with a wrench to appropriate torque
Assembly: Bring the two halves together and tighten the center nut to secure the connection
Avoid Over-tightening: Do not exceed recommended torque to prevent cracking the fitting body
Thread Compatibility: NPT, BSPT, and BSPP threads are not interchangeable. Verify thread type per system specification
Temperature Limitation: Not recommended for use above 300°C or below -50°C due to reduced toughness
Ferrite Balance: Ensure proper material specification to maintain the 50/50 austenite-ferrite microstructure
Vibration Sensitivity: Ensure the union nut is properly tightened to maintain leak-proof seal
Stress Corrosion: Threaded fittings create stress concentrators; verify suitability for the specific service environment
Standard delivery time is typically 15–30 days, subject to order quantity and specification availability
Common international payment methods include T/T (Telegraphic Transfer) and L/C at sight (Letter of Credit)
Products are securely packed in plywood cases or wooden crates with internal cushioning to ensure safe transportation and prevent damage during transit
All products undergo strict quality inspection before shipment, with Mill Test Certificates (EN 10204 3.1/3.2) available
Specific return, exchange, and warranty terms are subject to the final sales contract agreement.
.![]()
![]()
FAQ
1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
Company Details
Business Type:
Manufacturer,Agent,Importer,Exporter,Trading Company,Seller
Year Established:
1998
Total Annual:
100000-100000000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ... TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ...
Get in touch with us
Leave a Message, we will call you back quickly!