| Grade | tinplate |
| Material Grade | ASME B366 NO8020 |
| Payment Terms | T/T,Western Union |
| Chemical Composition | Ni MIn63%,Cu 28%-34%,Fe Max2.5% |
| Pressurerating | Class 150 to Class 2500 |
| Surfacefinish | Plain, Painted, Galvanized, Polished |
| Supply Ability | 10Ton/Month |
| Productname | Butt Weld Fittings |
| Temperature Range | -20°C to 400°C |
| Delivery Time | 15-30 Workdays |
| Outer Diameter | 13-400mm |
| Pipe Class | Not Rated |
| Original | CHINA |
| Standards | ASME B16.9, ASME B16.25, MSS-SP-43 |
| Product Type | tee |
| Corrosion Resistance | Perfect |
| Packaging Details | Standard Shipping Package |
| Process | stamping |
| Wallthickness | Schedule 10 to Schedule XXS |
| Model Number | Butt Welding Fitting |
| Brand Name | TOBO |
| Certification | ISO/TUV/SGS |
| Place of Origin | Shanghai,China |
View Detail Information
Explore similar products
TOBO Flanges Butt Weld Fittings ASTM A182 F5 Steel Flange
Pipe Fittings Elbow Stainless Steel Tee Galvanized Pipe Fittings Silver Color
Monel 400 DN100 Seamless Pipe Fittings SCH40 Long Radius Type For Heat
SCH80 SMLS Nickel Alloy Pipe Elbow Alloy B3 N10675 90° LR DN80
Product Specification
| Grade | tinplate | Material Grade | ASME B366 NO8020 |
| Payment Terms | T/T,Western Union | Chemical Composition | Ni MIn63%,Cu 28%-34%,Fe Max2.5% |
| Pressurerating | Class 150 to Class 2500 | Surfacefinish | Plain, Painted, Galvanized, Polished |
| Supply Ability | 10Ton/Month | Productname | Butt Weld Fittings |
| Temperature Range | -20°C to 400°C | Delivery Time | 15-30 Workdays |
| Outer Diameter | 13-400mm | Pipe Class | Not Rated |
| Original | CHINA | Standards | ASME B16.9, ASME B16.25, MSS-SP-43 |
| Product Type | tee | Corrosion Resistance | Perfect |
| Packaging Details | Standard Shipping Package | Process | stamping |
| Wallthickness | Schedule 10 to Schedule XXS | Model Number | Butt Welding Fitting |
| Brand Name | TOBO | Certification | ISO/TUV/SGS |
| Place of Origin | Shanghai,China | ||
| High Light | Butt-welding pipe fittings CUNI equal tee ,CuNi 7030 SCH40 pipe fittings ,ASME B16.9 butt weld fittings | ||
This product is a butt-welding equal tee fitting manufactured in accordance with ASME B16.9 standards . The material is CuNi 70/30 (also designated as UNS C71500), a high-performance copper-nickel alloy composed of approximately 70% copper and 30% nickel . This 2" Schedule 40 fitting is designed for permanent butt-weld connection in demanding piping systems.
| Parameter | Details / Range |
|---|---|
| Design Standard | ASME B16.9, ANSI B16.9 |
| Material Grade | CuNi 70/30 (UNS C71500 / DIN 2.0882) |
| Type | Equal Tee (Three ports: two inline "run" openings + one perpendicular "branch" opening) |
| Nominal Size | 2" (DN50) |
| Wall Thickness | Schedule 40 |
| End Connection | Butt-weld ends (beveled for welding) |
| Tensile Strength (min) | ~350–520 MPa (52,000 psi) |
| Yield Strength 0.2% (min) | ~130 MPa |
| Elongation (min) | ~36% |
| Density | ~8.94 g/cm³ (0.323 lb/in³) |
| Chemical Composition | Cu: Bal., Ni: 29.0-32.0%, Mn: 0.50-1.50%, Fe: 0.60-1.00% |
This equal tee is ideal for demanding seawater and marine environments :
Marine & Shipbuilding: Seawater piping systems, offshore platforms, subsea applications, Naval surface ships
Power Generation: Condenser and heat exchanger piping
Chemical & Petrochemical: Corrosive fluid handling systems
Pump and Valve Connections: Branch and distribution points requiring high corrosion resistance
Dividing or combining flow within a main pipeline
Superior Corrosion Resistance: Exceptional resistance to seawater corrosion, pitting, and stress corrosion cracking ; outperforms 90/10 CuNi in more hostile operating environments
Biofouling Resistance: Forms a protective oxide layer that resists biological fouling , making it ideal for marine immersion service
Enhanced Strength: High nickel content provides good strength and toughness
Good Weldability: Readily weldable using standard processes with ERCuNi filler material
Permanent Leak-Proof Connection: Butt-weld design provides high structural integrity for critical systems
The equal tee connects three sections of pipe in a T-shaped configuration, enabling fluid to be divided from a single inlet into two branch outlets, or combined from two inlets into one outlet . It provides a permanent, leak-proof junction point with three ports of equal diameter (2" run and branch).
Preparation: Degrease and clean pipe ends, tee weld areas, and filler metal of all contaminants (oil, grease, oxidation, dust) .
Edge Preparation: Bevel pipe ends and tee weld ends as per joint preparation requirements .
Alignment: Accurately align the tee with connecting pipes ensuring proper fit-up .
Tacking: Apply minimum tack welds to hold the assembly in position; clean thoroughly before final welding .
Welding: Use TIG (GTAW) process with ERCuNi filler wire (AWS A5.7 ERCuNi) . Preheat to min. 60°F (15°C) and maintain max. interpass temperature of 150°F (65°C) . Shielding gas: 100% argon, #6 cup minimum, flow rate 20-25 CFH . Use foot control to taper current off to prevent crater cracks .
Post-Weld Cleaning: Remove spatter and slag; clean with stainless steel brush or rotating flapper wheel to leave a bright finish .
Temperature Control: Strictly control interpass temperature not exceeding 150°F (65°C) to avoid microcracking .
Crater Sensitivity: Stops/terminations are very sensitive to crater pits or cracks – always taper current off and grind all stops .
No Post-Weld Heat Treatment: Heat treatment is not required after welding .
Back Purging: Use 99.9% argon back-purge to prevent internal oxidation .
Filler Metal: Use matching 70/30 CuNi consumables (ERCuNi) .
Cleanliness: Requires a higher degree of cleanliness than for steel fabrication .
Standard delivery time is typically 15–30 days, subject to order quantity and specification availability.
Common international payment methods include T/T (Telegraphic Transfer) and L/C at sight (Letter of Credit) .
Products are securely packed in wooden crates or carton packaging with internal cushioning to ensure safe transportation and prevent damage during transit .
All products undergo strict quality inspection before shipment.
In case of quality issues, retain original packaging and provide relevant photos or third-party inspection reports.
Specific return, exchange, and warranty terms are subject to the final sales contract agreement.
![]()
![]()
FAQ
1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
Company Details
Business Type:
Manufacturer,Agent,Importer,Exporter,Trading Company,Seller
Year Established:
1998
Total Annual:
100000-100000000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ... TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ...
Get in touch with us
Leave a Message, we will call you back quickly!