| Wallthickness | Schedule 10 to Schedule 160 |
| Supply Ability | 10Ton/Month |
| Standard | ANSI/ASTM B16.9 |
| Surfacefinish | Polished, Painted, Galvanized |
| Payment Terms | T/T,Western Union |
| Manufacturingprocess | Forging, Machining, Heat Treatment |
| Warranty | 1 year |
| Delivery Time | 15-30 Workdays |
| Production Year | Butt welding Fittings |
| Customized Support | OEM, ODM, OBM |
| Packaging Details | Standard Shipping Package |
| Payment | T/T, Paypal, Alipay |
| Model Number | Butt Welding Fitting |
| Brand Name | TOBO |
| Certification | ISO/TUV/SGS |
| Place of Origin | Shanghai,China |
View Detail Information
Explore similar products
TOBO Flanges Butt Weld Fittings ASTM A182 F5 Steel Flange
Pipe Fittings Elbow Stainless Steel Tee Galvanized Pipe Fittings Silver Color
Monel 400 DN100 Seamless Pipe Fittings SCH40 Long Radius Type For Heat
SCH80 SMLS Nickel Alloy Pipe Elbow Alloy B3 N10675 90° LR DN80
Product Specification
| Wallthickness | Schedule 10 to Schedule 160 | Supply Ability | 10Ton/Month |
| Standard | ANSI/ASTM B16.9 | Surfacefinish | Polished, Painted, Galvanized |
| Payment Terms | T/T,Western Union | Manufacturingprocess | Forging, Machining, Heat Treatment |
| Warranty | 1 year | Delivery Time | 15-30 Workdays |
| Production Year | Butt welding Fittings | Customized Support | OEM, ODM, OBM |
| Packaging Details | Standard Shipping Package | Payment | T/T, Paypal, Alipay |
| Model Number | Butt Welding Fitting | Brand Name | TOBO |
| Certification | ISO/TUV/SGS | Place of Origin | Shanghai,China |
| High Light | CuNi9010 stub end pipe fittings ,short type butt weld fittings ,ASME B16.9 stub end | ||
This product is a butt-welding short type stub end, manufactured from CuNi 90/10 (Copper-Nickel 90/10, UNS C70600) in accordance with ASME B16.9 and MSS SP-43 standards . Also known as CuNi10Fe1.6Mn, this alloy consists of approximately 90% copper and 10% nickel with small but important additions of iron and manganese to enhance overall strength and corrosion resistance . A stub end is a short pipe fitting used in conjunction with a lap joint flange to create a bolted, detachable connection . The short type features a shorter length (F dimension) compared to the long type, suitable for applications where space is limited . The 1" Schedule 10 fitting has a beveled end for butt-welding to the pipe, and a flared/lapped face for sealing against the flange.
| Parameter | Details / Range |
|---|---|
| Dimensional Standard | ASME B16.9, MSS SP-43 |
| Material Standard | ASTM B466 / ASME SB466 (UNS C70600) |
| Material Grade | CuNi 90/10 (UNS C70600 / CuNi10Fe1.6Mn) |
| Type | Short Type Stub End (Lap Joint Stub End) |
| Nominal Size | 1" (DN25) |
| Wall Thickness | Schedule 10 (SCH10S) |
| End Connection | Butt-weld beveled end / Lap joint flanged face |
| Chemical Composition (Cu/Ni/Fe/Mn) | 88.6% min / 9.0-11.0% / 1.0-1.8% / ≤1.0% |
| Tensile Strength | 303-414 MPa (44,000-60,000 psi) |
| Yield Strength (0.2%) | ~110-135 MPa (16,000-20,000 psi) |
| Elongation | 30-42% |
| Density | ~8.94 g/cm³ |
| PREN Value | ~26 |
This stub end is ideal for seawater and corrosive fluid systems requiring frequent disassembly:
Marine & Shipbuilding: Seawater cooling systems, firewater lines, ballast systems
Offshore Oil & Gas: Seawater injection systems, heat exchangers
Desalination Plants: Seawater intake, reverse osmosis feed lines
Power Generation: Condenser cooling water systems
Chemical Processing: Corrosive fluid handling, where frequent pipeline dismantling is needed
Superior Corrosion Resistance: Exceptional resistance to seawater, pitting, crevice corrosion, and stress corrosion cracking; called "offshore engineering alloy" for this reason
Biofouling Resistance: Forms a protective oxide layer that naturally resists marine biological growth
Cost-Effective: Offers a favorable balance of performance and cost compared to 70/30 CuNi or higher nickel alloys
Easy Maintenance: Stub end design enables quick disassembly and reassembly without cutting or welding for pipeline inspection and cleaning
Excellent Weldability: Readily weldable using standard GTAW processes with matching ERCuNi filler
The stub end provides a detachable, leak-proof connection point within a piping system. When welded to the pipe end, its lapped face forms a seal with a lap joint flange and gasket, enabling the flange to rotate freely for bolt-hole alignment . This design is particularly useful for systems requiring frequent maintenance, cleaning, or component replacement .
Preparation: Degrease and clean pipe ends and stub end weld areas thoroughly; CuNi requires a higher degree of cleanliness than steel
Alignment: Accurately align the stub end's beveled end with the pipe end, ensuring proper fit-up
Welding: Use GTAW (TIG) process with ERCuNi filler wire (AWS A5.7); use 100% argon shielding; back purge recommended for root pass to prevent internal oxidation
Assembly: Slide the lap joint flange over the stub end, place a gasket between the lapped faces, and tighten bolts evenly
Post-Weld: No post-weld heat treatment required; clean with stainless steel brush to leave a bright finish
Cleanliness: Requires a higher degree of cleanliness than carbon steel fabrication to prevent weld contamination
Temperature Limit: For aqueous corrosion service, limit to approximately 470°C; verify system conditions
Welding Heat Input: CuNi puddle is sluggish with an oxide film; requires appropriate amperage control
Compatibility: Not recommended for use with nitric acid or ammonia systems
Lap Face Protection: Protect the lapped face from scratches or damage during handling and installation
Standard delivery time is typically 15–30 days, subject to order quantity and specification availability
Common international payment methods include T/T (Telegraphic Transfer) and L/C at sight (Letter of Credit)
Products are securely packed in plywood cases or wooden crates with internal cushioning to ensure safe transportation and prevent damage during transit
All products undergo strict quality inspection before shipment, with Mill Test Certificates (EN 10204 3.1/3.2) available
In case of quality issues, retain original packaging and provide relevant photos or third-party inspection reports
Specific return, exchange, and warranty terms are subject to the final sales contract agreement.
![]()
![]()
FAQ
1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
Company Details
Business Type:
Manufacturer,Agent,Importer,Exporter,Trading Company,Seller
Year Established:
1998
Total Annual:
100000-100000000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ... TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ...
Get in touch with us
Leave a Message, we will call you back quickly!