| Payment Terms | T/T,Western Union |
| Supply Ability | 10Ton/Month |
| Delivery Time | 15-30 Workdays |
| Packaging Details | Standard Shipping Package |
| Model Number | Forged Pipe Fitting |
| Brand Name | TOBO |
| Certification | ISO/TUV/SGS |
| Place of Origin | Shanghai,China |
View Detail Information
Explore similar products
Copper Nickel 70/30 CuNi Seamless Pipe Fitting ISO API CCS Approval
Steel Forged Fittings ASTM A694 F56 , Elbow , Tee , Reducer ,SW, 3000LB,6000LB
Hexagonal Bushing Forged Pipe Fittings 2” x ¾” 3000 / 6000 PSI NPT A105
Steel Forged Fittings ASTM A694 F60 , Elbow , Tee , Reducer ,SW, 3000LB,6000LB
Product Specification
| Payment Terms | T/T,Western Union | Supply Ability | 10Ton/Month |
| Delivery Time | 15-30 Workdays | Packaging Details | Standard Shipping Package |
| Model Number | Forged Pipe Fitting | Brand Name | TOBO |
| Certification | ISO/TUV/SGS | Place of Origin | Shanghai,China |
| High Light | UNS C70600 Copper Nickel pipe fitting ,2 inch ASTM B466 welding tee ,butt welding equal tee fitting | ||
This product is a butt-welding equal tee manufactured from UNS C70600 (90/10 Copper-Nickel alloy / CuNi 90/10) in accordance with ASTM B466 and ASME B16.9 standards. Also known as CuNi10Fe1Mn or Werkstoff Nr. 2.0872, this alloy contains approximately 90% copper and 10% nickel, with small but important additions of iron (1.0-1.8%) and manganese to enhance overall strength and corrosion resistance. This 2" fitting is designed for permanent butt-weld connection, providing a three-way junction with equal-diameter ports for perpendicular flow branching.
| Parameter | Details / Range |
|---|---|
| Material Standard | ASTM B466 / ASME SB466 |
| Dimensional Standard | ASME B16.9, ASME B16.28 |
| Material Grade | UNS C70600 (CuNi 90/10 / CuNi10Fe1Mn / DIN 2.0872) |
| Type | Butt-welding Equal Tee (three equal-diameter ports) |
| Nominal Size | 2" (DN50) |
| Size Range (General) | 1/2" – 24" (DN15 – DN600) |
| Wall Thickness | SCH10S, SCH40S, SCH80S, SCH160, XS, XXS |
| End Connection | Butt-weld ends (beveled for welding) |
| Surface Finish | Mill finish, pickled, or polished |
| Chemical Composition | Cu: 88.6% min, Ni: 9.0-11.0%, Fe: 1.0-1.8%, Mn: ≤1.0% |
| Tensile Strength | 303-414 MPa (44,000-60,000 psi) |
| Yield Strength (0.2%) | ~110-135 MPa (16,000-20,000 psi) |
| Elongation | 30-42% |
| Density | 8.94 g/cm³ |
| Temperature Range | -50°C ~ +300°C |
| Pressure Rating | Class 150, 300, 600; Max. 3000 psi |
This equal tee is ideal for seawater and corrosive fluid systems requiring flow distribution:
Marine & Shipbuilding: Main engine cooling water, ballast systems, firewater lines, deck washing systems
Offshore Oil & Gas: Seawater lift pipes, platform cooling water ring mains, emergency firewater systems, seawater injection
Desalination Plants: Flash chamber brine circulation, reverse osmosis feed distribution, concentrate outfall
Power Generation: Condenser cooling water systems, nuclear plant component cooling water
Chemical Processing: Electroplating wastewater, saline organic waste liquid lines, cooling tower makeup water
Superior Seawater Corrosion Resistance: Exceptional resistance to pitting, crevice corrosion, and stress corrosion cracking in marine environments; only 0.5mm corrosion allowance needed for 20 years of service
Biofouling Resistance: Natural resistance to marine organism attachment due to copper ion release
Excellent Weldability: Single-phase alpha structure enables outstanding fabrication properties; no preheating or post-weld heat treatment required
Cost-Effective: Offers favorable balance of performance and cost compared to 70/30 CuNi, titanium, or super duplex grades
Low Maintenance: Long service life with minimal upkeep; ideal for systems where access for repairs is difficult
The butt-welding equal tee connects three pipe sections in a T-shaped configuration with all three ports of equal diameter (2"). It enables fluid to be divided from a single inlet into two branch outlets, or combined from two inlets into one outlet, providing a permanent, leak-proof junction point for flow distribution in piping systems.
Unpacking Inspection: Check for transit damage; verify markings are clear and complete
Surface Preparation: Clean bevel and 30mm of inner/outer wall area with stainless steel wire brush; remove all oil, grease, and paint
Alignment: Accurately align the tee with connecting pipes. Maximum permissible misalignment during fit-up is 10% of wall thickness, not exceeding 1.5mm
Welding: Use GTAW (TIG) process with ERCuNi filler wire (AWS A5.7). Use low current and fast welding speed to avoid overheating. Shielding: 100% argon or Ar-He mix. Preheating generally not required; maximum interpass temperature 150°C. No post-weld heat treatment required
Hydrotest: Test pressure = 1.5 × design pressure; ambient temperature should not be below 5°C during testing
Cleanliness: Requires a higher degree of cleanliness than carbon steel fabrication; use dedicated stainless steel tools
Temperature Limit: Maximum service temperature ~300°C
Prohibited Contact: Do not contact with low-melting-point metals such as zinc, cadmium, or lead
Medium Compatibility: Not recommended for use with strong oxidizing acids (e.g., nitric acid) or ammonia systems
Welding Heat Input: CuNi puddle is sluggish with an oxide film; requires appropriate amperage control
Standard delivery time is typically 7–30 days, subject to order quantity and specification availability
Common international payment methods include T/T (Telegraphic Transfer) and L/C at sight (Letter of Credit)
Products are securely packed in plywood cases, wooden crates, or pallets with internal cushioning to ensure safe transportation and prevent damage during transit
All products undergo strict quality inspection before shipment, with Mill Test Certificates (EN 10204 3.1/3.2) available
In case of quality issues, retain original packaging and provide relevant photos or third-party inspection reports
Specific return, exchange, and warranty terms are subject to the final sales contract agreement.
FAQ
1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
Company Details
Business Type:
Manufacturer,Agent,Importer,Exporter,Trading Company,Seller
Year Established:
1998
Total Annual:
100000-100000000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ... TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ...
Get in touch with us
Leave a Message, we will call you back quickly!