| Payment Terms | T/T,Western Union |
| Supply Ability | 10Ton/Month |
| Delivery Time | 15-30 Workdays |
| Packaging Details | Standard Shipping Package |
| Model Number | Butt Welding Fitting |
| Brand Name | TOBO |
| Certification | ISO/TUV/SGS |
| Place of Origin | Shanghai,China |
View Detail Information
Explore similar products
TOBO Flanges Butt Weld Fittings ASTM A182 F5 Steel Flange
Pipe Fittings Elbow Stainless Steel Tee Galvanized Pipe Fittings Silver Color
Monel 400 DN100 Seamless Pipe Fittings SCH40 Long Radius Type For Heat
SCH80 SMLS Nickel Alloy Pipe Elbow Alloy B3 N10675 90° LR DN80
Product Specification
| Payment Terms | T/T,Western Union | Supply Ability | 10Ton/Month |
| Delivery Time | 15-30 Workdays | Packaging Details | Standard Shipping Package |
| Model Number | Butt Welding Fitting | Brand Name | TOBO |
| Certification | ISO/TUV/SGS | Place of Origin | Shanghai,China |
| High Light | Copper Nickel butt weld reducer ,ASTM B466 pipe fitting ,2x1 concentric reducer fitting | ||
This product is a butt-welding concentric reducer manufactured from UNS C70600 (90/10 Copper-Nickel alloy / CuNi 90/10) in accordance with ASTM B466 and ASME B16.9 standards. Also known as CuNi10Fe1.6Mn or Werkstoff Nr. 2.0872, this alloy consists of approximately 90% copper and 10% nickel, with small additions of iron (1.0-1.8%) and manganese to enhance strength and corrosion resistance. The 90/10 CuNi alloy has a single-phase alpha structure, providing excellent fabricability and weldability. This 2" x 1" fitting is designed for permanent butt-weld connection, enabling a smooth, concentric reduction from a larger bore to a smaller bore while maintaining a common centerline.
| Parameter | Details / Range |
|---|---|
| Material Standard | ASTM B466 / ASME SB466 |
| Dimensional Standard | ASME B16.9, ASME B16.28, MSS-SP-43 |
| Material Grade | UNS C70600 (CuNi 90/10 / CuNi10Fe1.6Mn / DIN 2.0872) |
| Type | Butt-welding Concentric Reducer |
| Nominal Size | 2" x 1" (DN50 x DN25) |
| Size Range (General) | 1/2" – 24" NB (DN15 – DN600) |
| Wall Thickness | SCH10, SCH40, SCH80, SCH160, XS, XXS |
| End Connection | Butt-weld ends (beveled for welding) |
| Chemical Composition | Cu: 88.6% min, Ni: 9.0-11.0%, Fe: 1.0-1.8%, Mn: ≤1.0% |
| Tensile Strength | 303-414 MPa (44,000-60,000 psi) |
| Yield Strength (0.2%) | ~100-135 MPa (14,500-20,000 psi) |
| Elongation | 30-42% |
| Density | 8.94 g/cm³ |
| Melting Range | 1100-1145°C |
| Thermal Conductivity | 40-50 W/mK |
| Hardness | ~90 Hv |
This concentric reducer is ideal for seawater and corrosive fluid systems requiring pipe diameter transitions:
Marine & Shipbuilding: Seawater cooling systems, firewater lines, ballast systems, bilge lines
Offshore Oil & Gas: Seawater lift pipes, platform cooling water ring mains, seawater injection
Desalination Plants: Seawater intake, reverse osmosis feed distribution, brine recirculation lines
Power Generation: Condenser cooling water systems, heat exchangers
Chemical Processing: Corrosive fluid handling, hydraulic lines
Superior Seawater Corrosion Resistance: Exceptional resistance to pitting, crevice corrosion, and stress corrosion cracking in marine environments; forms a protective oxide layer that improves with service
Biofouling Resistance: Naturally resists marine biological growth due to copper ion release
Excellent Weldability: Single-phase alpha structure enables outstanding fabrication properties without complex preheating or post-weld heat treatment
Cost-Effective: Widely used as an inexpensive alternative to 70/30 CuNi, titanium, or super duplex grades while delivering excellent performance
Smooth Flow Transition: Concentric design with common centerline ensures uniform diameter reduction with minimal turbulence and pressure drop
The concentric reducer connects two pipes of different diameters in a straight line while maintaining a common centerline. It reduces the pipe diameter uniformly from 2" to 1", ensuring smooth, efficient fluid flow with minimal turbulence and pressure drop. The butt-weld connection provides a permanent, leak-proof joint with high structural integrity.
Unpacking Inspection: Check for transit damage; verify markings are clear and complete
Surface Preparation: Clean weld bevel and adjacent area within 10mm using a stainless steel wire brush; remove all oil, grease, and oxidation
Alignment: Accurately align the reducer with connecting pipes ensuring concentricity. Square butt weld preparations are possible up to 3mm wall thickness
Tacking: Apply minimum tack welds to hold assembly in position; clean thoroughly before final welding
Welding: Use GTAW (TIG) process with ERCuNi filler wire (AWS A5.7). Shielding: 100% argon or Ar-He mix. Preheat recommended at 200-300°F (93-150°C). Use DCEN (Direct Current Electrode Negative). Keep tack welds to a minimum
Post-Weld: No post-weld heat treatment required; clean with stainless steel brush to leave a bright finish
Cleanliness: Requires a higher degree of cleanliness than carbon steel fabrication; use dedicated stainless steel tools
Temperature Limit: For aqueous corrosion service, verify system conditions for temperatures above 300°C
Welding Heat Input: CuNi puddle is sluggish with an oxide film; requires appropriate amperage control
Medium Compatibility: Not recommended for use with strong oxidizing acids (e.g., nitric acid) or ammonia systems
Pressure Rating: Verify that the fitting's pressure class matches the system design requirements
Standard delivery time is typically 7–30 days, subject to order quantity and specification availability
Common international payment methods include T/T (Telegraphic Transfer) and L/C at sight (Letter of Credit)
Products are securely packed in plywood cases, wooden crates, or pallets with internal cushioning to ensure safe transportation and prevent damage during transit
All products undergo strict quality inspection before shipment, with Mill Test Certificates (EN 10204 3.1/3.2) available
Optional third-party inspection by ABS, DNV, CCS, LR, BV, RINA, or KR is available
In case of quality issues, retain original packaging and provide relevant photos or third-party inspection reports
Specific return, exchange, and warranty terms are subject to the final sales contract agreement.
FAQ
1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
Company Details
Business Type:
Manufacturer,Agent,Importer,Exporter,Trading Company,Seller
Year Established:
1998
Total Annual:
100000-100000000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ... TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ...
Get in touch with us
Leave a Message, we will call you back quickly!