China factories

Chat Now Send Email
China factory - TOBO STEEL GROUP CHINA

TOBO STEEL GROUP CHINA

  • China,Shanghai ,Shanghai
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Forged Socket Welding Coupling ASTM A182 UNS S31803 Duplex Stainless Steel DN20
China Forged Socket Welding Coupling ASTM A182 UNS S31803 Duplex Stainless Steel DN20

  1. China Forged Socket Welding Coupling ASTM A182 UNS S31803 Duplex Stainless Steel DN20

Forged Socket Welding Coupling ASTM A182 UNS S31803 Duplex Stainless Steel DN20

  1. MOQ: 1PC
  2. Price: Negotiable
  3. Get Latest Price
Corrosion Resistance High
Outer Diameter 1''
Payment Terms T/T,Western Union
Product Type Carbon Steel Caps
Manufacture Standard ASME,MSS SP-44,JIS, API,DIN
Sizerange 1/2 inch to 48 inches
Supply Ability 10Ton/Month
Wallthickness Schedule 10 to Schedule 160
Shapetypes Elbow, Tee, Reducer, Cap, Stub End
Delivery Time 15-30 Workdays
Surfacefinish Polished, Painted, Galvanized
Technics forged
End Type Threaded
Packaging Details Standard Shipping Package
Shape Reducing
Head Code round
Material Grade N08020
Standard oil gas water industrial
Function Quick Locking
Model Number Butt Welding Fitting
Brand Name TOBO
Certification ISO/TUV/SGS
Place of Origin Shanghai,China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Corrosion Resistance High Outer Diameter 1''
Payment Terms T/T,Western Union Product Type Carbon Steel Caps
Manufacture Standard ASME,MSS SP-44,JIS, API,DIN Sizerange 1/2 inch to 48 inches
Supply Ability 10Ton/Month Wallthickness Schedule 10 to Schedule 160
Shapetypes Elbow, Tee, Reducer, Cap, Stub End Delivery Time 15-30 Workdays
Surfacefinish Polished, Painted, Galvanized Technics forged
End Type Threaded Packaging Details Standard Shipping Package
Shape Reducing Head Code round
Material Grade N08020 Standard oil gas water industrial
Function Quick Locking Model Number Butt Welding Fitting
Brand Name TOBO Certification ISO/TUV/SGS
Place of Origin Shanghai,China
High Light Forged Socket Welding Coupling Duplex Stainless SteelASTM A182 Duplex Stainless Steel Pipe FittingASME B16.11 Socket Welding Coupling DN20

Forged Socket Welding Coupling ASTM A182 UNS S31803 Duplex Stainless Steel DN20 ASME B16.11

1. Product Description

This product is a forged socket welding coupling manufactured from ASTM A182 UNS S31803 in accordance with ASME B16.11 standards . A coupling is a fundamental fitting used to join two sections of pipe in a straight line . The socket weld (SW) connection involves inserting the pipe into the fitting's socket and applying a fillet weld around the joint . Duplex 2205 is a dual-phase stainless steel with roughly equal proportions of austenite and ferrite, offering roughly double the yield strength of standard 300-series austenitic stainless steels and exceptional corrosion resistance . This DN20 (3/4") Class 3000# fitting is designed for permanent, leak-proof connections in demanding small-bore piping systems.

2. Key Product Parameters



Parameter Details / Range
Dimensional Standard ASME B16.11 
Material Standard ASTM A182 / ASME SA182 
Material Grade UNS S31803 (Duplex 2205 / F51) 
Type Full Coupling – Socket Weld (SW) 
Nominal Size DN20 (3/4" NPS) 
Connection Type Socket Weld (Fillet weld) 
Pressure Class 3000# 
Tensile Strength (min) 620 MPa (90 ksi) 
Yield Strength (min) 450 MPa (65 ksi) 
Elongation (min) 25% 
Hardness (max) 293 HBW 
PREN Value ~34-36 
Heat Treatment Solution anneal 1020-1100°C, water quench 

3. Application / Usage

This socket weld coupling is ideal for high-pressure and corrosive service:

  • Oil & Gas: Offshore platforms, subsea piping, high-pressure process lines 

  • Chemical Processing: Chloride-containing acids, brine services 

  • Desalination: High-pressure reverse osmosis piping connections 

  • Marine & Seawater Systems: Fire water, cooling water systems 

  • Instrumentation: Connections requiring leak-proof integrity 

4. Advantages

  • Superior Strength: Yield strength is approximately double that of 316L austenitic steel, enabling thinner wall designs 

  • Excellent Corrosion Resistance: PREN ~34-36 provides outstanding resistance to pitting, crevice corrosion, and chloride stress corrosion cracking 

  • Leak-Proof Connection: Socket weld with fillet weld provides high leak resistance, ideal for flammable, toxic, or high-pressure fluids 

  • Vibration Resistance: Excellent performance on lines subject to vibration and thermal cycling 

  • Cost-Effective: Higher strength offsets per-kilogram cost premium over 316L 

5. Functions

The socket weld coupling joins two sections of small-bore pipe (NPS 2 or smaller) in a straight line . It provides a permanent, pressure-rated, leak-proof joint for piping system extension or repair . For DN20 (3/4") Class 3000#, it serves as a durable inline connection for critical service applications requiring welding.

6. Installation Instructions

  1. Preparation: Clean pipe ends and coupling socket of all contaminants

  2. Expansion Gap: Insert pipe leaving 1/16" (1.6 mm) gap between pipe end and socket bottom before welding 

  3. Welding: Perform fillet weld around the joint using qualified WPS and certified welders

  4. NDT: Visual and PT/MT examination recommended for fillet weld 

  5. Cleaning: Post-weld cleaning and inspection as per procedure

7. Precautions

  • Expansion Gap: The 1/16" gap is mandatory to prevent thermal expansion cracking 

  • Temperature Limitation: Maximum service temperature ~315°C (600°F) 

  • Ferrite Balance: Heat treatment (solution anneal) required to maintain 40-60% ferrite content 

  • Quality Testing: Ferric chloride pitting test per ASTM A923 Method C recommended 

  • NACE Compliance: Hardness below 28 HRC required for sour gas service 

8. Shipping & Delivery

  • Standard delivery time is typically 15–30 days, subject to order quantity and specification availability.

9. Payment Terms

  • Common international payment methods include T/T (Telegraphic Transfer) and L/C at sight (Letter of Credit) .

10. Packaging

  • Products are securely packed in plywood cases or wooden crates with internal cushioning to ensure safe transportation and prevent damage during transit .

11. After-Sales / Return & Warranty Policy

  • All products undergo 100% strict quality inspection before shipment, with Mill Test Certificates (EN 10204 3.1/3.2) available .

  • In case of quality issues, retain original packaging and provide relevant photos or third-party inspection reports.

  • Specific return, exchange, and warranty terms are subject to the final sales contract agreement.

    FAQ

    1. Are you trading company or manufacturer ?
        We are manufacturer ,You can see the certification.
    2. How long is your delivery time?
        Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
    3. Do you provide samples ? is it free or extra ?
        Yes, we could offer the sample for free charge but need pay the cost of freight.
    4. What is your terms of payment ?
        Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Agent,Importer,Exporter,Trading Company,Seller

  • Year Established:

    1998

  • Total Annual:

    100000-100000000

  • Employee Number:

    200~300

  • Ecer Certification:

    Verified Supplier

     TOBO GROUP sales head offce in Shanghai.         We are one of the Professional manufacturers Exporter  Pipeline products  in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ...      TOBO GROUP sales head offce in Shanghai.         We are one of the Professional manufacturers Exporter  Pipeline products  in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ...

+ Read More

Get in touch with us

  • Reach Us
  • TOBO STEEL GROUP CHINA
  • 2F,Building7,Baolong Center,No.689,Xiwang Road,Jiading District,Shanghai,201800,China
  • https://www.buttweldingfitting.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement