| Delivery Time | 15-30 Workdays |
| Supply Ability | 10Ton/Month |
| Payment Terms | T/T,Western Union |
| Packaging Details | Standard Shipping Package |
| Certification | ISO/TUV/SGS |
| Brand Name | TOBO |
| Place of Origin | Shanghai,China |
View Detail Information
Explore similar products
Super Duplex Steel UNS S32760 2 1/2" Class 600 WN Flanges ASME B16.5
Expander Flange Raised Face DN15 Class 200 Alloy Steel ASTM A182F2 Sliver
Welding Neck Flange Alloy Steel ASTM A182 F7 Pipe Fittings 2inch Class300
ASTM A182 ANSI B16.5 Forged Steel Flanges , SS316 SS304 Stainless Steel Flange
Product Specification
| Delivery Time | 15-30 Workdays | Supply Ability | 10Ton/Month |
| Payment Terms | T/T,Western Union | Packaging Details | Standard Shipping Package |
| Certification | ISO/TUV/SGS | Brand Name | TOBO |
| Place of Origin | Shanghai,China | ||
| High Light | Copper Nickel welding neck flange ,ASTM B466 long flange ,ASME B16.5 C71500 flange | ||
This product is a Long Welding Neck Flange (LWNF) manufactured from UNS C71500 (70/30 Copper-Nickel alloy / CuNi 70/30) in accordance with ASTM B466 and ASME B16.5 standards. Also known as CuNi 70/30 or Werkstoff Nr. 2.0882, this alloy contains approximately 70% copper and 30% nickel, with small additions of iron and manganese to enhance strength and corrosion resistance. The Long Welding Neck Flange features an extended, heavy-wall neck that provides additional reinforcement in high-stress applications. Unlike a standard Weld Neck flange, the LWNF is constructed in two sections: the upper section is a heavy-wall barrel, while the lower section is a disc-like plate flange with all dimensions conforming to ASME B16.5 standard flanges. This flange is designed for butt-weld connection to piping systems and is primarily applied to the construction of pressure vessels functioning as nozzles (such as thermowell nozzles).
| Parameter | Details / Range |
|---|---|
| Material Standard | ASTM B466 / ASME SB466 |
| Dimensional Standard | ASME B16.5 / ANSI B16.5 |
| Material Grade | UNS C71500 (70/30 Cu-Ni / CuNi 70/30 / 2.0882) |
| Type | Long Welding Neck Flange (LWNF) |
| Size Range | 1/2" – 24" (DN15 – DN600) |
| Pressure Class | Class 150# to 2500# |
| Facing Type | RF (Raised Face), FF (Flat Face), RTJ (Ring Type Joint) |
| End Connection | Butt-weld (beveled for welding) |
| Chemical Composition (Cu/Ni/Fe/Mn) | Cu: 65.0% min / Ni: 29.0-33.0% / Fe: 0.40-1.00% / Mn: ≤1.00% |
| Tensile Strength (min) | 372-517 MPa (54,000-75,000 psi) |
| Yield Strength 0.2% (min) | 172-483 MPa (25,000-70,000 psi) |
| Elongation (min) | 30% |
| Density | 8.94 g/cm³ |
| Melting Range | 1170 – 1240°C |
| Marine Standards | EEMUA 145, DIN 86019 |
This Long Welding Neck Flange is ideal for seawater and corrosive fluid systems in demanding environments:
Pressure Vessels & Boilers: Nozzle connections, thermowell nozzles
Offshore Oil & Gas: Platform piping, subsea applications, seawater injection systems
Marine & Shipbuilding: Seawater cooling systems, firewater lines, offshore fire water systems
Desalination Plants: High-pressure seawater intake, brine recirculation lines
Power Generation: Condenser cooling water systems, heat exchangers
Chemical Processing: Chloride-containing environments where stainless steel may suffer SCC
Extended Neck Design: The heavy-wall barrel provides additional reinforcement and stress distribution in high-stress applications, making it ideal for pressure vessel nozzles
Superior Corrosion Resistance: Exceptional resistance to seawater, pitting, crevice corrosion, and chloride stress corrosion cracking
Higher Strength: 70/30 CuNi offers better strength and erosion resistance than 90/10 CuNi
Biofouling Resistance: Copper content naturally inhibits marine biological growth
Excellent Weldability: Single-phase alpha structure enables outstanding fabrication properties
Insulation Clearance: Extended neck provides clearance for insulation in process plant applications
The Long Welding Neck Flange provides a permanent, reinforced bolted connection point for joining piping systems to pressure vessels, boilers, and heat exchangers. The extended heavy-wall neck is butt-welded to the pipe or vessel nozzle, forming a unified structure that distributes stress evenly and minimizes pressure concentration at the joint. The flange face accommodates a gasket to ensure a reliable seal when bolted to a mating flange. Unlike standard Weld Neck flanges, the long type is unsuitable for pipes and is primarily used in process plant applications.
Unpacking Inspection: Check for transit damage; verify markings, dimensions, and pressure class per ASME B16.5
Surface Preparation: Clean the weld bevel and adjacent area using dedicated tools; remove all oil, grease, and contaminants
Alignment: Accurately align the flange neck with the pipe or vessel nozzle, ensuring proper fit-up
Welding: Perform butt-weld following approved WPS with certified welders. Use GTAW (TIG) process with matching filler metal. Preheat generally not required; interpass temperature ≤150°C. No post-weld heat treatment required
Gasket Installation: Place a suitable gasket (e.g., spiral wound, PTFE) on the flange face
Bolting: Install bolts and tighten in a cross-torque sequence to the recommended torque value
Hydrotest: Test pressure = 1.5 × design pressure; ambient temperature not below 5°C
Cleanliness: Requires a higher degree of cleanliness than carbon steel fabrication; use dedicated tools to prevent contamination
Temperature Limit: For aqueous corrosion service, verify system conditions for temperatures above 300°C
Welding Heat Input: CuNi puddle is sluggish with an oxide film; requires appropriate amperage control
Medium Compatibility: Not recommended for use with strong oxidizing acids (e.g., nitric acid) or ammonia systems
Bolting Torque: Do not exceed recommended torque to prevent gasket damage or flange distortion
Gasket Selection: Choose gasket material compatible with the service medium and pressure/temperature conditions
Standard delivery time is typically 15–30 days, subject to order quantity, pressure class, and specification availability
Common international payment methods include T/T (Telegraphic Transfer) and L/C at sight (Letter of Credit)
Products are securely packed in plywood cases or wooden crates with internal cushioning to ensure safe transportation and prevent damage during transit
All products undergo strict quality inspection before shipment, with Mill Test Certificates (EN 10204 3.1/3.2) available
PMI and third-party inspection (ABS, DNV, CCS, LR, BV, etc.) available upon request
In case of quality issues, retain original packaging and provide relevant photos or third-party inspection reports
Specific return, exchange, and warranty terms are subject to the final sales contract agreement.
FAQ
1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
Company Details
Business Type:
Manufacturer,Agent,Importer,Exporter,Trading Company,Seller
Year Established:
1998
Total Annual:
100000-100000000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ... TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ...
Get in touch with us
Leave a Message, we will call you back quickly!