Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 2 Million Ton/Year |
Delivery Time | 7-14 work days |
Packaging Details | Export Packing |
Material | Carbon Steel |
Type | Blind Flange |
Product name | Forged B16.5 150lb RF A105n Stainless Steel Blind Flange |
Advantage | High technology ; good surface ; high quality etc |
Size | DN15-DN600 |
Standard | ANSI |
Process Method | Forged / Casting |
Application | Oil,Gas |
Brand Name | ST |
Model Number | Blind flange 093 |
Certification | ISO |
Place of Origin | China |
View Detail Information
Explore similar products
Din Flat Cast Welding Forged 15mm Carbon Steel Blind Flange
En1092-1 Carbon Steel Blind Flange Forged 16 Welding Neck 24"
Ss 304 110 Inch Carbon Steel Blind Flange Weld Neck Thread Flat Plate
Ansi Blind Flange Carbon Steel Ss Joint Class 150 Socket Weld Neck For Pipe
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 2 Million Ton/Year |
Delivery Time | 7-14 work days | Packaging Details | Export Packing |
Material | Carbon Steel | Type | Blind Flange |
Product name | Forged B16.5 150lb RF A105n Stainless Steel Blind Flange | Advantage | High technology ; good surface ; high quality etc |
Size | DN15-DN600 | Standard | ANSI |
Process Method | Forged / Casting | Application | Oil,Gas |
Brand Name | ST | Model Number | Blind flange 093 |
Certification | ISO | Place of Origin | China |
High Light | B16.5 stainless steel blind flange ,150lb stainless steel blind flange ,A105n ss blind flange |
Forged B16.5 150lb RF A105n Stainless Steel Blind Flange
Blind flanges have various applications in piping systems and industrial processes. Here are some common applications of blind flanges:
Closure of Pipe Ends: Blind flanges are primarily used to seal off the end of a pipe or vessel opening when it is not in use. They provide closure and prevent the flow of fluids or gases through the pipe.
Pressure Testing: Blind flanges are employed during pressure testing of piping systems. By installing a blind flange at one end of the pipeline and pressurizing the system, it allows for testing the integrity and strength of the system.
Temporary Blockage: In situations where a section of the pipeline needs to be temporarily blocked off for maintenance or repairs, blind flanges are used to isolate the section and prevent the flow of fluids or gases.
Blind flanges are versatile components that offer flexibility and convenience in various industrial applications. They provide a reliable sealing solution, allow for system maintenance, and contribute to the overall integrity and safety of piping systems.
Product Description
Product | Blind Flange |
Type | Blind |
Size | 1/2", 3/4", 1", 1 1/4", 1 1/2", 2", 2 1/2", 3", 3 1/2", 4", 5", 6", 8", 10", 12", 14", 16", 18", 20", 22", 24", 26", 28", 30", 32", 34", 36", 38", 40", 42", 44", 46", 48" |
DN15, DN20, DN25, DN32, DN40, DN50, DN65, DN80, DN90, DN100, DN125, DN150, DN200, DN250, DN300, DN350, DN400, DN450, DN500, DN550, DN600, DN650, DN700, DN750, DN800, DN850, DN900, DN950, DN1000, DN1050, DN1100, DN1150, DN1200 | |
Material | Carbon Steel: A105/RST37.2/C22.8/Q235, etc. |
Stainless Steel: 304/304L,316/316L,321,ect. | |
Pressure | Class 150;Class 300;Class 600;Class 900;Class 1500;Class 2500 |
PN2.5;PN6;PN10;PN16;PN25;PN40;PN63;PN100;PN160;PN250;PN320;PN400 | |
Wall Thickness | Sch5s, Sch10s, Sch10, Sch20, Sch30, Sch40s, STD, Sch40, Sch60, Sch80s, XS; Sch80, Sch100, Sch120, Sch140, Sch160, XXS. |
Standard | ANSI/ASME B16.5, ANSI/ASME B16.47, DIN, JIS, GOST, UNI, etc. |
Surface Treatment | Oiled or Painting or Sandblast or Galvanized |
Application | Because the flange has good comprehensive performance, it is widely used in basic projects such as chemical industry, construction, water supply, drainage, petroleum, light and heavy industry, refrigeration, sanitation, plumbing, fire fighting, electric power, aerospace, shipbuilding, and so on. |
Service | OEM or ODM Service Available |
Packing | Wooden case, pallet or as customers' requirement |
Delivery Items | FOB(30% down payment in advance, the balance before shipment) CIF or CRF(30% in advance, the balance against with the copy of B/L) |
Delivery Time | Within 15-45 days after receipt of advance payment |
Advantage | 1. More than 10 years of flange manufacturing experience. 2. Near Tianjin Port and Tianjin Airport. 3. We provide: We have high-quality processing equipment. We promise on-time, stable quality, just price, client confidentiality. 4. With samples and order: We can offer dimension reports, material certification. |
Inspection | Optical Spectrometer X-ray Detector QR-5 Fully Automatic Computer Carbon Sulfur Analyzer Measurement Tensile Test Finished Product NDT UT(Digital UItrasonic Flaw Detector) Metallographic Analysis Imaging Studies Magnetic Particle Inspection |
Product Display
Package
Company Profile
Certificate
Flange Production Equipment
Test Equipment
Company Details
Business Type:
Manufacturer
Year Established:
1989
Total Annual:
100000000-200000000
Employee Number:
50~500
Ecer Certification:
Site Member
Established in 1989, Hebei Shengtian Pipe-Fitting Group Co., Ltd. located in Mengcun County Hebei Province China, covering a land area of 100,000 square meters, with a workshop of 25,000 square meters and registered capital of 110 million RMB. Our company has a strong staff team. There are ove... Established in 1989, Hebei Shengtian Pipe-Fitting Group Co., Ltd. located in Mengcun County Hebei Province China, covering a land area of 100,000 square meters, with a workshop of 25,000 square meters and registered capital of 110 million RMB. Our company has a strong staff team. There are ove...
Get in touch with us
Leave a Message, we will call you back quickly!