Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 80000 pieces/month |
Delivery Time | 7-15 work days |
Packaging Details | in Wooden Cases or Customers Requirements |
Material | Carbon Steel |
Shape | Straight |
Type | Tee |
Size | 1/2''-72'' |
Standard | ASME B16.9 |
Usage | Oil Gas Water Industrial,Convey Water |
Color | Black |
Thickness | STD |
Brand Name | Shengtian |
Model Number | pipe fitting 024 |
Certification | SGS/ISO9000/EN10204 3.1B/TUV |
Place of Origin | Mengcun County,China |
View Detail Information
Explore similar products
Construsction SCH10 P235GH 45 Degree Pipe Elbow
ASTM A234 WPB Carbon Steel Pipe Fitting For Petroleum
Graphite Filled 16 Inch AISI A105 Carbon Steel Pipe Fitting
Butt Welding Black Painting SCH XXS Carbon Steel Pipe Fitting
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 80000 pieces/month |
Delivery Time | 7-15 work days | Packaging Details | in Wooden Cases or Customers Requirements |
Material | Carbon Steel | Shape | Straight |
Type | Tee | Size | 1/2''-72'' |
Standard | ASME B16.9 | Usage | Oil Gas Water Industrial,Convey Water |
Color | Black | Thickness | STD |
Brand Name | Shengtian | Model Number | pipe fitting 024 |
Certification | SGS/ISO9000/EN10204 3.1B/TUV | Place of Origin | Mengcun County,China |
High Light | carbon steel buttweld tee ,buttweld tee carbon steel ,a234 buttweld tee |
Buttweld Carbon Steel A234 Wpb Seamless Carbon Steel Pipe Fitting Tee
Product Parameters:
Porduct Name | Buttweld Carbon Steel A234 Wpb Seamless Carbon Steel Pipe Fitting Tee |
Size | 1/2''-72'' |
Standard | ANSI B16.9, EN10253-2, DIN2605, DIN2615,DIN2616,DIN2617, GOST17375-2001, JIS B2313, MSS SP 75, etc. |
Wall thickness | STD, XS, XXS, SCH20,SCH30,SCH40, SCH60, SCH80, SCH160, XXS And Etc. |
Type | Elbow, Tee, Reducer, Cap, Bend, Stub End, Weldolet, Pipe Nipple, Etc. |
Process | Seamless Or Seam Welded |
End | Bevel End/BE/Buttweld |
Surface | Nature Color, Varnished, Black Painting, Anti-Rust Oil Etc. |
Material | Carbon Steel: A234WPB, A420 WPL6 St37,St45, E24, A42CP, 16Mn, Q345, P245GH,P235GH, P265GH, P280GH, P295GH, P355GH Etc. |
Pipeline Steel: ASTM 860 WPHY42, WPHY52, WPHY60, WPHY65,WPHY70, WPHY80 And Etc. | |
Cr-Mo Alloy Steel: A234 WP11,WP22,WP5,WP9,WP91, 10CrMo9-10, 16Mo3 Etc. | |
Application | Petrochemical Industry;Aviation And Aerospace Industry;Pharmaceutical Industry,Gas Exhaust; Power Plant;Ship Building; Water Treament, Etc. |
Advantages | Ready Stock,Faster Delivery Time;Available In All Sizes,Customized;High Quality |
Heat Treatment:
1. Keep sample raw material to trace
2. Arrange heat treatment as per standard strictly
Company Details
Business Type:
Manufacturer
Year Established:
1989
Total Annual:
100000000-200000000
Employee Number:
50~500
Ecer Certification:
Site Member
Established in 1989, Hebei Shengtian Pipe-Fitting Group Co., Ltd. located in Mengcun County Hebei Province China, covering a land area of 100,000 square meters, with a workshop of 25,000 square meters and registered capital of 110 million RMB. Our company has a strong staff team. There are ove... Established in 1989, Hebei Shengtian Pipe-Fitting Group Co., Ltd. located in Mengcun County Hebei Province China, covering a land area of 100,000 square meters, with a workshop of 25,000 square meters and registered capital of 110 million RMB. Our company has a strong staff team. There are ove...
Get in touch with us
Leave a Message, we will call you back quickly!