Payment Terms | TT, L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 1 sets per month |
Delivery Time | 30-60 days |
Packaging Details | Standard export package |
Material | Steel |
Color | Silver |
Part Name | Wheel Gear |
Feature | Decoration and Smooth |
Fitment | 100% Match |
OEM/ODM | Depend on Customers |
Brand Name | ERBIWA |
Certification | ISO9001: 2008; ISO16949: 2016 |
Place of Origin | Dongguan Guangdong, China |
View Detail Information
Explore similar products
Precision Plastic Mold Components For Universal Cardiac Electrical Line And 7
SKD61 Material Mold Spare Parts / Injection Mold Components ODM
Durable Mold Spare Parts In 1.2344 , H13 , S136 Of Plastic Mold Components
1.2344 Material Precision Mold Components / 5 Axis CNC Machined Parts
Product Specification
Payment Terms | TT, L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 1 sets per month |
Delivery Time | 30-60 days | Packaging Details | Standard export package |
Material | Steel | Color | Silver |
Part Name | Wheel Gear | Feature | Decoration and Smooth |
Fitment | 100% Match | OEM/ODM | Depend on Customers |
Brand Name | ERBIWA | Certification | ISO9001: 2008; ISO16949: 2016 |
Place of Origin | Dongguan Guangdong, China | ||
High Light | plastic mold parts ,plastic injection mold components ,Wheel Gear Plastic Mold Components |
1.OEM/ODM service
2.Good team
3.Stamping parts
4.Strict quality control system
5.Experienced with Aisa. US. and Europe
OEM & ODM by customers’ design ,quote according to your drawing and requirement.
Our engineer team manage from part drawing until shipment and check each step to make sure the final products are qualified before shipment.
The process of making moulds
Search | We search each other to built business relationship through the internet or some other ways. |
Negotiation | We negotiate about the quality,price,mould material,delivery time,payment,technique requests stc and sign our sales confirmation. |
Down Payment | Usually, we need to get some down payment before start our work. |
R&D | We offer customers the drawings for products and mould structure. |
Confirmation | We send the drawings to customers to confirm |
Machining Center | Our machining center combine CNC milling machine, Mc wire cutting,NC,EDM and so on. |
Testing | We will testing the mould frequently during the process to make sure everything is ok. |
Confirmation | We send the sample to customer to check. |
Delivery | We send the mould to our customer by sea or by air as the demand of our customer. |
Our Advantages
1. Well trained staffs and advanced equipments
2. High quality but competitive price
3. Accept customization
4. Timely feedback and delivery
5. And outstanding customer service
Our team
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
2016
Total Annual:
3,200,000-5,000,000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
2021 ERBIWA Mould-Equipment List.pdf ERBIWA Mould Industrial Co., Ltd was established in 2016 in Changan Town, Dongguan City. It takes less than one hour from Shenzhen airport to our company. Therefore, our company has superior location and facilitated traffic and the logistics i... 2021 ERBIWA Mould-Equipment List.pdf ERBIWA Mould Industrial Co., Ltd was established in 2016 in Changan Town, Dongguan City. It takes less than one hour from Shenzhen airport to our company. Therefore, our company has superior location and facilitated traffic and the logistics i...
Get in touch with us
Leave a Message, we will call you back quickly!