China factories

Chat Now Send Email
China factory - Shijiazhuang Zhengzhong Technology Co., Ltd

Shijiazhuang Zhengzhong Technology Co., Ltd

  • China,Guangzhou ,Guangdong
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China More than 50,000 Cubic Meters GLS/GFS Storage Tanks to Carry Your Agricultural
China More than 50,000 Cubic Meters GLS/GFS Storage Tanks to Carry Your Agricultural

  1. China More than 50,000 Cubic Meters GLS/GFS Storage Tanks to Carry Your Agricultural

More than 50,000 Cubic Meters GLS/GFS Storage Tanks to Carry Your Agricultural

  1. MOQ: 1set
  2. Price: $5000~$20000 one set
  3. Get Latest Price
Adhesion 3,450N/cm
Steel plates thickness 3mm - 12mm , depends on the diameter & height Defect free Minimum maintenance needed
Holiday test >1500v
Capacity 20 m³ to 18,000 m³
Acid and alkalinity proof Standard coating suits for PH3 - PH11, special coating suits for PH1 - PH14
Payment Terms L/C,T/T
Supply Ability 60 sets per month
Delivery Time 10-30 days after deposit received
Packaging Details PE poly-foam between each two steel plates ; wooden pallet and wooden box
Coating thickness 0.25mm~0.40mm , two layer of coating internal and external
Brand Name CEC TANKS
Model Number W
Certification ISO 9001:2008, AWWA D103 , OSHA , BSCI
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Adhesion 3,450N/cm Steel plates thickness 3mm - 12mm , depends on the diameter & height Defect free Minimum maintenance needed
Holiday test >1500v Capacity 20 m³ to 18,000 m³
Acid and alkalinity proof Standard coating suits for PH3 - PH11, special coating suits for PH1 - PH14 Payment Terms L/C,T/T
Supply Ability 60 sets per month Delivery Time 10-30 days after deposit received
Packaging Details PE poly-foam between each two steel plates ; wooden pallet and wooden box Coating thickness 0.25mm~0.40mm , two layer of coating internal and external
Brand Name CEC TANKS Model Number W
Certification ISO 9001:2008, AWWA D103 , OSHA , BSCI Place of Origin China
High Light grain storage tanks ,irrigation water storage tanks

Secure, large-scale water containment is the backbone of modern agricultural resilience. For mega-scale farming operations, commercial irrigation networks, and regional water conservation initiatives, scaling storage capacity beyond 50,000 cubic meters demands an engineering solution that balances structural integrity with rapid deployment and zero chemical leaching.

In summary, Glass-Fused-to-Steel (GFS)—also known globally as Glass-Lined Steel (GLS)—tanks represent the premier choice for large-capacity agricultural water storage, offering an inert, rust-proof surface that outperforms traditional concrete and welded options in both installation speed and lifetime value.

Why GFS/GLS Technology Wins at Scale

The technical advantage of GFS tanks comes from a high-temperature factory firing process between 820°C and 930°C. This intense heat causes silica glass to molecularly fuse with a steel core plate.

The resulting material delivers a dual benefit: you get the structural strength and flexibility of steel combined with the superior corrosion and wear resistance of glass.

For agricultural operations storing raw well water, surface runoff, or treated liquid fertilizer, this inorganic glass layer ensures absolute chemical stability. It eliminates the risk of water contamination from concrete scaling or epoxy breakdown, providing a clean environment for crops and livestock alike.

Comparing High-Capacity Storage Infrastructure

When managing a total site volume exceeding 50,000 cubic meters, engineers typically evaluate three core infrastructure types. The comparative breakdown below demonstrates why modular bolted steel leads the market in efficiency:

Engineering Metric Glass-Fused-to-Steel (GFS) Reinforced Concrete Welded Carbon Steel
Installation Velocity Fast (Modular panels assemble with sync jacks) Slow (Requires 28+ days of concrete curing) Moderate (Extensive on-site welding required)
Corrosion Resistance Superior (pH 1–14 coverage, inert surface) Low (Porous structure prone to cracking) Moderate (Relies on temporary coatings/linings)
Maintenance Profile Minimal (30+ year design life) High (Requires ongoing crack and seal repairs) High (Demands periodic blasting and repainting)
Quality Control 100% Factory Tested (1500V Holiday test) Field Sampled (Prone to local environmental variables) Field Inspected (Welding quality varies by technician)
Technical Deployment Blueprint for Mega Tank Arrays

Achieving a collective storage volume greater than 50,000 cubic meters requires a carefully sequenced design and execution strategy. Because modular bolted tanks do not rely on traditional field welding, their deployment follows a highly predictable, risk-mitigated timeline.

  1. Geotechnical Assessment & Foundation Engineering:Phase 1. Analyze local soil bearing capacity and seismic activity. A precise concrete ring beam foundation is poured to support the massive hydrostatic pressures exerted by thousands of cubic meters of water.
  2. Factory Fabrication & 1500V Defect Testing:Phase 2. Steel sheets are precision-cut, shot-blasted, coated with liquid enamel, and fired. Every single panel undergoes a 1500V High-Voltage Holiday Test to guarantee absolute coating continuity before being packed for global transport.
  3. Synchronized Ground-Level Assembly:Phase 3. Using specialized mechanical jacking systems, the top ring of the tank and the roof (such as an Aluminum Geodesic Dome or GFS roof) are assembled first at ground level. This drastically minimizes high-altitude labor risks.
  4. Progressive Lifting & Bolting:Phase 4. The jacks elevate the completed ring, allowing crews to bolt the next row of panels beneath it using high-tenacity Grade 10.9 galvanized bolts and specialized, long-lasting sealants. This process repeats until full height is reached.
  5. Hydrostatic Commissioning & Integration:Phase 5. The tank array is filled progressively to verify seal integrity. Inlet, outlet, and overflow piping networks are integrated alongside automated agricultural telemetry systems.
Global Compliance and Production Authority

To ensure maximum asset protection, large-scale containment infrastructure must adhere strictly to established international design codes. Premium GFS tanks are engineered and fabricated in compliance with global standards, including:

  • AWWA D103-09: The benchmark standard for factory-coated bolted carbon steel water storage.
  • ISO 28765: The governing standard for design and engineering testing of glass-lined steel tanks.
  • NSF/ANSI 61: Validates that the containment system will not leach harmful materials into potable or agricultural water supplies.

The Takeaway: When engineering a water storage system over 50,000 cubic meters, moving away from porous concrete or high-maintenance welded steel to modular GFS tanks dramatically lowers long-term operational expenditures (OpEx) while protecting your most valuable agricultural resource.

Project Procurement and Engineering Contact

As a leading global provider of modular containment systems, Shijiazhuang Zhengzhong Technology Co., Ltd. (Center Enamel) delivers customized EPC technical support from initial product design to final on-site commissioning. For tailored engineering calculations, site layouts, or formal budget quotes for your next agricultural infrastructure project, connect with our technical sales division through our direct corporate channels:

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    1989

  • Employee Number:

    500~600

  • Ecer Certification:

    Verified Supplier

  Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 2008. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a...   Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 2008. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a...

+ Read More

Get in touch with us

  • Reach Us
  • Shijiazhuang Zhengzhong Technology Co., Ltd
  • Fuli Commercial Center room 301#, Xingang West Rd.11#, Haizhu area, Guangzhou, Guangdong province, China.
  • https://www.cectanks.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement