China factories

Chat Now Send Email
China factory - Shijiazhuang Zhengzhong Technology Co., Ltd

Shijiazhuang Zhengzhong Technology Co., Ltd

  • China,Guangzhou ,Guangdong
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China 300,000 Gallon Bolted Steel Water Storage Tank: A Reliable Solution for Large
China 300,000 Gallon Bolted Steel Water Storage Tank: A Reliable Solution for Large

  1. China 300,000 Gallon Bolted Steel Water Storage Tank: A Reliable Solution for Large

300,000 Gallon Bolted Steel Water Storage Tank: A Reliable Solution for Large

  1. MOQ: 1set
  2. Price: $5000~$20000 one set
  3. Get Latest Price
Payment Terms L/C,T/T
Supply Ability 60 sets per month
Delivery Time 10-30 days after deposit received
Packaging Details PE poly-foam between each two steel plates ; wooden pallet and wooden
Easy to clean Smooth, glossy, inert, anti-adhesion
Easy to cle Smooth, glossy, inert, anti-adhesion
Adhesion 3,450N/cm
Size Of Panel 2.4M * 1.2M
Steel plates thickness 3mm - 12mm , depends on the diameter & height
Capactiy available 20 m3 to 18,000 m3
Warranty period 2 years free of charge
Acid and alkalinity proof Standard coating suits for PH3 - PH11, special coating suits for PH1 - PH14
Impact Resistance Excellent
Service life ≥30 years
Coating thickness 0.25mm~0.40mm , two layer of coating internal and external
Steel grade ART 310
Usage Waste water treatment , sewage treatment, effluent treatment, ect.
Brand Name CEC TANKS
Model Number W
Certification ISO 9001:2008, AWWA D103 , OSHA , BSCI
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C,T/T Supply Ability 60 sets per month
Delivery Time 10-30 days after deposit received Packaging Details PE poly-foam between each two steel plates ; wooden pallet and wooden
Easy to clean Smooth, glossy, inert, anti-adhesion Easy to cle Smooth, glossy, inert, anti-adhesion
Adhesion 3,450N/cm Size Of Panel 2.4M * 1.2M
Steel plates thickness 3mm - 12mm , depends on the diameter & height Capactiy available 20 m3 to 18,000 m3
Warranty period 2 years free of charge Acid and alkalinity proof Standard coating suits for PH3 - PH11, special coating suits for PH1 - PH14
Impact Resistance Excellent Service life ≥30 years
Coating thickness 0.25mm~0.40mm , two layer of coating internal and external Steel grade ART 310
Usage Waste water treatment , sewage treatment, effluent treatment, ect. Brand Name CEC TANKS
Model Number W Certification ISO 9001:2008, AWWA D103 , OSHA , BSCI
Place of Origin China
High Light glass fused to steel water tanks ,above ground fuel storage tanks
300,000 Gallon Bolted Steel Water Storage Tank: A Reliable Solution for Large-Scale Water Storage Needs

In municipal water distribution, industrial manufacturing, and private fire protection systems, managing vast volumes of water securely is essential for community safety and operational continuity. When project requirements scale up to massive capacities, conventional storage options often struggle with slow construction timelines, high labor overhead, or severe structural limitations.

For projects demanding a high-performance capacity benchmark, the 300,000-gallon bolted steel water storage tank represents the gold standard in modern civil engineering. Shijiazhuang Zhengzhong Technology Co., Ltd. (Center Enamel) leverages over three decades of specialized manufacturing expertise to deliver world-class 300k-gallon modular storage systems engineered to thrive in the most demanding climatic and environmental conditions globally.

Why Choose a 300,000-Gallon Capacity?

A 300,000-gallon storage milestone is frequently specified across diverse industrial and municipal sectors due to its ideal balance between footprint efficiency and high-volume output:

  1. Municipal Potable Water Reserves: Serves as an essential buffer for growing residential districts, ensuring stable water pressure and backup supply during peak consumption hours or emergency line repairs.

  2. Private Fire Protection (NFPA 22 Compliance): Facilities classified under high-hazard or high-piled storage require robust fire suppression volumes where local municipal water mains cannot deliver adequate flow rates (GPM) for extended durations. A 300,000-gallon reserve guarantees compliance with strict fire safety codes.

  3. Industrial Process and Emergency Water: Provides reliable, uninterrupted raw or treated water supply for manufacturing plants, power facilities, and large-scale agricultural irrigation complexes.

Engineering Advantages of Center Enamel’s Bolted Steel Systems

Center Enamel combines cutting-edge material processing with modular design principles to outperform traditional field-welded steel or poured concrete structures:

1. Advanced Coating Technology (GFS and FBE)
  • Glass-Fused-to-Steel (GFS): Inorganic glass frit is fused to high-strength steel plates at extreme temperatures between 820°C and 930°C, creating an inseparable molecular bond that delivers total corrosion immunity and a smooth, scratch-resistant surface.

  • Fusion Bonded Epoxy (FBE): Applied via automated electrostatic powder coating, FBE systems provide a tough, flexible polymer barrier designed for exceptional impact resistance and long-term weathering defense.

2. Rapid Modular Erection

Unlike cast-in-place concrete tanks that demand weeks or months of formwork, pouring, and weather-dependent curing, 300,000-gallon bolted tanks are prefabricated in a controlled factory environment. Flat-packed for economical shipping, they are rapidly assembled on-site using mechanical bolting and specialized jacking equipment.

3. Structural Resilience and Seismic Performance

Engineered strictly to withstand local wind loads, dead loads, and seismic acceleration parameters (per ASCE 7 and AWWA D103 standards), the flexible nature of bolted steel joints absorbs seismic shocks far better than brittle concrete structures.

Comparative Matrix: Large-Scale Water Storage Technologies
Performance Metric Center Enamel Bolted Steel Tank (GFS/FBE) Cast-in-Place Concrete Tank Traditional Field-Welded Steel Tank
Construction Speed Fast (Prefabricated modules assembled rapidly via mechanical bolting) Very Slow (Months of pouring, formwork, and curing) Moderate (Requires extensive field welding and NDT testing)
Coating Quality Control Factory Tested (100% high-voltage holiday spark testing prior to dispatch) None (Porous concrete surface vulnerable to cracking and seepage) Variable (Prone to environmental contamination during field painting)
Lifecycle Maintenance Minimal (Zero interior repainting required for GFS over decades) High (Requires frequent structural crack sealing and patching) High (Requires continuous labor-intensive exterior and interior recoating)
Seismic Resilience Excellent (High tensile strength steel with flexible bolted joints) Low (Prone to cracking and structural brittleness under dynamic stress) Moderate

Engineering Assurance: All 300,000-gallon storage tanks supplied by Center Enamel undergo stringent quality validation, including high-voltage spark testing (>1500V) on every panel to guarantee absolute pinhole-free corrosion defense.

Frequently Asked Questions (FAQ)
Q: What are the typical physical dimensions of a 300,000-gallon bolted steel water tank?

A: While dimensions can be customized to fit specific site constraints and aspect ratios, a standard round configuration for a 300,000-gallon tank typically ranges around 33 feet in diameter with a peak height of 48 feet, or alternative low-profile and wide-span designs engineered to meet local zoning requirements.

Q: Are Center Enamel's 300,000-gallon tanks compliant with fire protection and municipal codes?

A: Yes. Our tanks are engineered and manufactured in strict compliance with major international standards, including AWWA D103-09 (bolted steel water storage), NFPA 22 (private fire protection), NSF/ANSI 61 (potable water safety), and ISO 9001 quality frameworks.

Q: How long does it take to install a 300,000-gallon bolted steel tank on-site?

A: Because the panels are prefabricated in a climate-controlled factory, on-site installation using mechanical bolting is dramatically faster than concrete construction, typically reducing project timelines to just a few weeks depending on site preparation and foundation readiness.

Q: Do bolted steel water tanks require ongoing interior repainting?

A: If you select Center Enamel's flagship Glass-Fused-to-Steel (GFS) option, the permanent inorganic glass coating eliminates the need for interior repainting entirely over its multi-decade design lifespan, resulting in the lowest lifecycle maintenance cost in the industry.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    1989

  • Employee Number:

    500~600

  • Ecer Certification:

    Verified Supplier

  Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 2008. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a...   Shijiazhuang Zhengzhong Technology Co.,Ltd is a professional manufacturer dedicated to the design and fabrication of bolted storage tanks since 2008. Our products range includes Glass-Fused-to-Steel (GFS) tanks, fusion bonded epoxy tanks, stainless steel tanks, galvanized steel tanks a...

+ Read More

Get in touch with us

  • Reach Us
  • Shijiazhuang Zhengzhong Technology Co., Ltd
  • Fuli Commercial Center room 301#, Xingang West Rd.11#, Haizhu area, Guangzhou, Guangdong province, China.
  • https://www.cectanks.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement